After installation...
Commissioning
The Quartz Thermo valve is
1.Ensure that the hot water system is at normal maximum temperature.
2.Turn the temperature control lever to the full cold position (9 o’clock).
3.Carefully remove the on/off lever cap. Remove the on/off lever screw and remove the on/off lever assembly.
4.Using a screwdriver, carefully remove the temperature lever cover plate ensuring any damage to plated surfaces is avoided. Remove the temperature control lever screws and pull the temperature lever clear.
5.Carefully remove the lilac
6.Depress the stop button and replace the temperature lever in the full cold position. Push the on/off knob into position fully home, but do not secure with the small screw at this stage.
7.Test the shower by turning it on and slowly increasing the temperature, at the selected point, the button should pop up and prevent further movement.
8.Repeat the above process if the maximum temperature stop button needs further adjustment.
9.Follow steps 20 to 23 to
Quartz Thermo installation guide |
| page 12 |
|
|
|