Typical installations
Typical gravity system installation
Supply
Underside of cistern |
Vent and
| Highest point |
Cold feed | must be 1m below |
to cylinder | underside of |
| cistern |
| Connect |
| ‘A’ or ‘B’ |
| B |
| A |
Typical Thermal storage unit system installation
Supply
Hot water |
| Hot water |
| cylinder | |
cylinder |
| |
|
|
Typical pumped system installation | Typical UHW system installation | |
Supply |
|
|
| Underside of cistern |
|
| Vent and |
|
| pipe to hot water |
|
| Highest point |
|
Cold feed | must be below |
|
to cylinder | underside of |
|
cistern | Central | |
heating | ||
| ||
| boiler | |
B |
| |
Connect |
| |
‘A’ or ‘B’ |
| |
A |
| |
| Supply | |
Hot water |
| |
cylinder |
|
Typical combination boiler installation
Pressure reducing valve if required
Supply
Quartz Thermo installation guide |
| page 15 |
|
|
|