17 | Refit the lilac temperature preset override |
ring and the white temperature preset |
location ring if removed prior to installation, taking care to fit the override ring in the correct orientation as outlined in step 5. Prior to replacing the shroud, ensure the shroud seal is in position as indicated.
18 | Replace the shroud ensuring that it is fully |
fitted against the shroud support ring as |
shown.
19 | Using a silicone based lubricant or liquid |
soap, lubricate the wall plate seal. Apply a |
thin bead of silicone mastic into the groove on the rear of the wall plate and carefully push the wall plate into position flush with the wall.
20 | Depress the maximum temperature stop |
button and replace the temperature lever |
onto the valve in the full cold (9 o’clock). Replace the four screws to secure the lever to the valve hand tight only.
21 Ensuring the fixing lugs and locating pins are correctly aligned, carefully place the temperature lever cover plate onto the temperature lever and click into position.
22
Shroud support ring
Shroud seal
Quartz Thermo installation guide |
| page 8 |
|
|
|