23 Ensuring the fixing lugs and locating pins are correctly aligned, carefully place the valve end cap onto the on/off lever and click into position.
Adjustable height head installation
1Prepare pipe work from the shower valve to the required position for the hose outlet using
a ø15mm copper pipe. Slide the 15mm gripper ring down the projecting pipe up to the wall face.
2Trim the projecting pipe to a length of
3
4
Clean and lubricate the pipe using a suitable (silicone based) lubricant.
Remove the wall outlet cover plate and carefully slide the wall outlet onto the projecting pipe. Turn to the required position and mark the screw holes on the wall face.
5Remove the wall outlet and drill and prepare suitable wall fixings. Ensure the projecting pipe
is clean and lubricate again if necessary. Refit the wall outlet and secure it to the wall using the screws provided.
6Refit the wall outlet coverplate.
Quartz Thermo installation guide |
| page 9 |
|
|
|