Quartz QZ3111 manual Quartz Thermo installation guide, Prepare the wall fixings as required

Page 6
Prepare the wall fixings as required.

5Set the temperature control lever to full cold (9 o’clock) prior to removing the four screws

securing the lever to the valve. Carefully remove the temperature lever to reveal the lilac temperature preset override ring and the white temperature preset location ring. Neither of these parts need to be removed for installation. However if they are removed please take a note of their orientation on the valve prior to removal (as illustrated).

6Carefully remove the shroud from the valve assembly.

7If the valve is being installed for use with a gas fired instantaneous (multipoint) water

heater or a combination boiler, the cold water flow regulator must be fitted at this stage by insertion into the cold water port as shown (the flow regulator is supplied in its own pack).

8Fit the elbows to the valve body hand tight, ensuring that the rubber washers are correctly engaged (these are supplied in the screw pack).

9The Quartz Thermo valve is supplied with an outlet cap on the bottom of the valve allowing for a top outlet connection. The bottom outlet can be used by

simply removing the cap and repositioning it on the top outlet. If the cap is removed please ensure that when replaced, the membrane in the cap is in place and that the cap is done up tight.

10

Fit the outlet connector ensuring the rubber

washer is correctly engaged (supplied in the

screwpack), on the required outlet ensuring a tight fit. Offer the valve up to the required fixing position to check the four fixings points are correct and there is adequate space available around both inlet elbows and outlet connector.

Prepare the wall fixings as required.

Quartz Thermo installation guide

 

page 6

 

 

 

Image 6
Contents Quartz Quartz Thermo installation guideConcealed shower valve with adjustable head ThermoQZ3111 Shower systemsQuartz Thermo installation guide ComponentsIntroduction Safety informationImportant information FlushingPressures Pump installationStored water capacities Gravity fed hot and cold suppliesStep-by-stepinstructions Quartz Thermo installation guideQuartz Thermo is supplied with universal fixings Quartz Thermo installation guide Prepare the wall fixings as requiredQuartz Thermo installation guide Temporarily cap off the outlet supply pipeTHE MORTAR GUARD MUST BE USED Quartz Thermo installation guide ring and the white temperature presetAdjustable height head installation Quartz Thermo installation guideQuartz Thermo installation guide Fit the rail end clip fitting into position intoafter passing it through the gel hook/hose Quartz Thermo installation guideConnect the hose to the wall outlet assembly restraint if required and run the shower forAfter installation CommissioningQuartz Thermo installation guide User guide After installationCleaning Quartz Thermo installation guideAction Troubleshooting guideSymptom Quartz Thermo installation guideTypical gravity system installation Typical installationsQuartz Thermo installation guide Typical Thermal storage unit system installationAqualisa Products Limited The Flyer’s Way