Important information

Pump installation

UNDER NO CIRCUMSTANCES MUST A PUMP BE FITTED DIRECTLY TO THE WATER MAIN.

A pump must only be used to boost the pressure from tank-fed supplies. A typical layout is shown on the reverse of this guide.

Stored water capacities

The minimum capacity of the cold storage cistern should not be less than 225 litres (50 gallons). The capacity of the hot cylinder must be capable of meeting the anticipated demand.

Pressures

The Quartz Thermo shower valve is designed to control static pressure up to 10 bar. Where pressures are likely to exceed 10 bar, a pressure reducing valve (PRV) must be fitted into the incoming mains supply. A setting of 3 bar is recommended. It should be noted that daytime pressures approaching 8 bar can rise above the stated maximum overnight.

Quartz Thermo is not suitable for mixed supply systems e.g. gravity hot and mains cold.

A suitable PRV is available from Aqualisa.

Gravity fed hot and cold supplies

Services must be installed according to good plumbing practice having regard to pipe sizing, long pipe runs and low-head situations.

The cold supply for the valve assembly must be taken directly from the cold storage system. The hot supply may be taken from the vent/draw off pipe of the hot water cylinder at a point below the cylinder connection or alternatively from the underside of the horizontal draw off.

Rising pipe work must not be connected into the horizontal draw-off from the cylinder or to any point in the vent/draw off pipe above the cylinder connection.

CYLINDER TEMPERATURE IN EXCESS OF 65ºC MAY RESULT IN POOR SHOWER PERFORMANCE.

To minimise pressure loss we recommend that the hot and cold supplies are run in 22mm as close as reasonably possible to the mixing valve before reducing to 15mm.

A typical layout is shown oon page 15.

Combination boiler/multipoint system

The gas water heater must be capable of raising the temperature of the incoming water by 35˚C and delivering a flow rate of no less than 9 litres (2 gallons) per minute to the shower valve. This is sufficient to operate one outlet point at a time.

The Aqualisa Thermo cartridge is designed to operate from the mains at a maximum pressure of 10 bar. If the mains pressure exceeds 10 bar a ‘drop tight’ PRV must be fitted on the supply pipe after the main stopcock.

The cold supply can be taken from the nearest convenient mains supply and the hot supply can be taken from the nearest hot water draw-off point. Account must be taken of the pressure drops that will occur when other draw-off points are used while the shower is in use. Pipe work can generally be run in 15mm.

A typical layout is shown oon page 15.

Balanced high-pressure system

The Aqualisa Thermo cartridge is designed to operate with unvented hot water storage systems up to a maximum pressure

of 10 bar. A PRV must be used if either supply exceeds 10 bar. The cold water supply must be drawn from the same mains supply as that to the hot water system (down stream of the cylinder manufacturers pressure limiting valve, where supplied) and the hot supply from the nearest convenient draw off point. Account must be taken of pressure drops that may occur when other draw-off points are used while the shower is in use.Pipe work can generally be run in 15mm.

A typical layout is shown oon page 15.

Quartz Thermo installation guide

 

page 4

 

 

 

Image 4
Contents Quartz Thermo installation guide Concealed shower valve with adjustable headQuartz ThermoShower systems Quartz Thermo installation guideQZ3111 ComponentsSafety information Important informationIntroduction FlushingPump installation Stored water capacitiesPressures Gravity fed hot and cold suppliesQuartz Thermo installation guide Step-by-stepinstructionsQuartz Thermo is supplied with universal fixings Quartz Thermo installation guide Prepare the wall fixings as requiredTemporarily cap off the outlet supply pipe Quartz Thermo installation guideTHE MORTAR GUARD MUST BE USED Quartz Thermo installation guide ring and the white temperature presetAdjustable height head installation Quartz Thermo installation guideQuartz Thermo installation guide Fit the rail end clip fitting into position intoQuartz Thermo installation guide Connect the hose to the wall outlet assemblyafter passing it through the gel hook/hose restraint if required and run the shower forCommissioning After installationQuartz Thermo installation guide After installation CleaningUser guide Quartz Thermo installation guideTroubleshooting guide SymptomAction Quartz Thermo installation guideTypical installations Quartz Thermo installation guideTypical gravity system installation Typical Thermal storage unit system installationAqualisa Products Limited The Flyer’s Way