PB Heat WBV Series, WV Series manual Electrical, General, Burner Wiring

Page 11

ELECTRICAL

4. ELECTRICAL

A.GENERAL

All electrical wiring shall be done in accordance with the National Electrical Code and Local Requirements. Single pole switches including those of safety controls or protective devices shall not be wired in a grounded line.

B.BURNER WIRING

1.See Section 5 for mounting burner.

2.Install junction box, limit harness, and Heyco bushing, each located in the trim carton. See Figure 4.1. Mount junction box to the holes in the right side of jacket with (2) #10 x 1/2" sheet metal screws. Attach Heyco bushing to 7/8" knockout in left side of junction box. Connect limit harness to 7/8" knockout on top of junction box and insert limit harness Molex connector into Heyco bushing until it snaps firmly in place.

Improper installation of burner WARNING harness can allow burner to energize

with burner mounting plate open, creating a severe burn hazard to boiler maintenance personnel.

3. Install burner harness located in the burner carton.

Beckett or Carlin – PP7024 Harness (11-1/2" conduit)

Riello – PP7023 Harness (17-1/2" conduit)

4.For complete information on servicing and adjustment of controls, refer to the attached control specification sheets.

5.See the following Wiring Diagrams:

Figure 4.2 - Water Boilers, Knockdown Figure 4.3 - Water Boilers, Packaged Figure 4.4 - Steam Boilers with Float LWCO Figure 4.5 - Steam Boilers with Probe LWCO Figure 4.6 - Zoning with Circulators

Figure 4.7 - Zoning with Zone Valves

Figure 4.1: Junction Box Wiring, Steam and Knockdown Water Boilers

9

Image 11
Contents Series WBV/WV Table of Contents Special Attention Boxes Using this ManualInstallation Clearance Required from Jacket Recommended From Jacket for PreinstallationClearances AIR for Combustion and VentilationOld New Comments Installation SurveyChimney / Vent and Draft Control Planning the LayoutJacket Assembly Knockdown Boilers Boiler Placement and AssemblySetting the Boiler Connecting the Flue OutletSteam boiler Water Boiler Piping Pressure Test Block AssemblyPiping and Controls Boiler Return ClearanceControls Tankless Heater or CoverplateFloat Low Water Cut-off General Burner WiringElectrical Water Boilers, Knockdown Steam with Float Low Water Cut-Off Zoning with Circulators Check Boiler Controls Burner Setup & Boiler OperationBurner Installation Burner START-UP and AdjustmentCleaning the boiler requires the use Clean the Boiler Steam Boilers only65 60 B Hago Hago85 x 60 B Hago DELMaintenance Monthly Maintenance with Boiler Operating Daily Maintenance with Boiler OperatingWeekly Maintenance with Boiler Operating Maintenance of Safety Relief ValveOpened to facilitate this operation If a Long Shutdown is RequiredBoiler Jacket Rear of Jacket to Boiler Dimensions & RatingsBoiler Jacket Rear of Jacket to Top DepthInput Water ContentHeating CapacityItem No Stock Code Description Additional Information Repair PartsPage Page Series WBV/WV