PB Heat WBV Series, WV Series manual

Page 25

NOTES

23

Image 25
Contents Series WBV/WV Table of Contents Installation Clearance Using this ManualSpecial Attention Boxes Clearances PreinstallationAIR for Combustion and Ventilation Required from Jacket Recommended From Jacket forChimney / Vent and Draft Control Installation SurveyPlanning the Layout Old New CommentsSetting the Boiler Boiler Placement and AssemblyConnecting the Flue Outlet Jacket Assembly Knockdown BoilersSteam boiler Piping and Controls Pressure Test Block AssemblyBoiler Return Clearance Water Boiler PipingControls Tankless Heater or CoverplateFloat Low Water Cut-off Electrical Burner WiringGeneral Water Boilers, Knockdown Steam with Float Low Water Cut-Off Zoning with Circulators Burner Installation Burner Setup & Boiler OperationBurner START-UP and Adjustment Check Boiler ControlsCleaning the boiler requires the use Clean the Boiler Steam Boilers only85 x 60 B Hago HagoDEL 65 60 B HagoMaintenance Weekly Maintenance with Boiler Operating Daily Maintenance with Boiler OperatingMaintenance of Safety Relief Valve Monthly Maintenance with Boiler OperatingOpened to facilitate this operation If a Long Shutdown is RequiredBoiler Jacket Rear of Jacket to Top Boiler Dimensions & RatingsDepth Boiler Jacket Rear of Jacket toHeating Water ContentCapacity InputItem No Stock Code Description Additional Information Repair PartsPage Page Series WBV/WV