PB Heat WV Series, WBV Series manual Maintenance

Page 18

MAINTENANCE

6. MAINTENANCE

WARNING

Product Safety Information

Refractory Ceramic Fiber Product

This appliance contains materials made from refractory ceramic fibers (RCF). Airborne RCF, when inhaled, have been classified by the International Agency for Research on Cancer (IARC), as a possible carcinogen to humans. After the RCF materials have been exposed to temperatures above 1800°F, they can change into crystalline silica, which has been classified by the IARC as carcinogenic to humans. If particles become airborne during service or repair, inhalation of these particles may be hazardous to your health.

Avoid Breathing Fiber Particulates and Dust

Suppliers of RCF recommend the following precautions be taken when handling these materials:

Precautionary Measures: Provide adequate ventilation.

Wear a NIOSH/MSHA approved respirator.

Wear long sleeved, loose fitting clothing and gloves to prevent skin contact. Wear eye goggles.

Minimize airborne dust prior to handling and removal by water misting the material and avoiding unnecessary disturbance of materials.

Wash work clothes separately from others. Rinse washer thoroughly after use. Discard RCF materials by sealing in an airtight plastic bag.

First Aid Procedures:

Inhalation: If breathing difficulty or irritation occurs, move to a location with fresh clean air. Seek immediate medical attention if symptoms persist.

Skin Contact: Wash affected area gently with a mild soap and warm water. Seek immediate medical attention if irritation persists.

Eye Contact: Flush eyes with water for 15 minutes while holding eyelids apart. Do not rub eyes. Seek immediate medical attention if irritation persists.

Ingestion: Drink 1 to 2 glasses of water. Do not induce vomiting. Seek immediate medical attention.

16

Image 18
Contents Series WBV/WV Table of Contents Using this Manual Installation ClearanceSpecial Attention Boxes AIR for Combustion and Ventilation PreinstallationClearances Required from Jacket Recommended From Jacket forPlanning the Layout Installation SurveyChimney / Vent and Draft Control Old New CommentsConnecting the Flue Outlet Boiler Placement and AssemblySetting the Boiler Jacket Assembly Knockdown BoilersSteam boiler Boiler Return Clearance Pressure Test Block AssemblyPiping and Controls Water Boiler PipingTankless Heater or Coverplate ControlsFloat Low Water Cut-off Burner Wiring ElectricalGeneral Water Boilers, Knockdown Steam with Float Low Water Cut-Off Zoning with Circulators Burner START-UP and Adjustment Burner Setup & Boiler OperationBurner Installation Check Boiler ControlsClean the Boiler Steam Boilers only Cleaning the boiler requires the useDEL Hago85 x 60 B Hago 65 60 B HagoMaintenance Maintenance of Safety Relief Valve Daily Maintenance with Boiler OperatingWeekly Maintenance with Boiler Operating Monthly Maintenance with Boiler OperatingIf a Long Shutdown is Required Opened to facilitate this operationDepth Boiler Dimensions & RatingsBoiler Jacket Rear of Jacket to Top Boiler Jacket Rear of Jacket toCapacity Water ContentHeating InputRepair Parts Item No Stock Code Description Additional InformationPage Page Series WBV/WV