PB Heat WV Series, WBV Series If a Long Shutdown is Required, Opened to facilitate this operation

Page 20

MAINTENANCE

2.To thoroughly clean the boiler it must be brushed down from the top. Alternatively, for limited space or minimum clearance to combustible installations, cleaning the heat exchanger from the combustion chamber side is acceptable. If unit is extremely dirty, it may be necessary to brush from both directions. The target wall is made of a soft ceramic fiber. Care must be taken not to damage this material during cleaning.

3.Remove any scale or soot from the combustion chamber area by vacuum cleaning or any other available means.

NOTICE

Burner mounting plate must be

 

opened to facilitate this operation.

4.Replace oil burner and flue collector cover plate making sure all gaskets are in place.

5.Replace jacket top panel.

All cover plates, enclosures, and NOTICE guards must be maintained in place

at all times, except during maintenance and servicing.

6. Inspect venting system.

G.IF A LONG SHUTDOWN IS REQUIRED

1.To take boiler out of service if the boiler and system are not to be used when temperatures are below freezing:

a.Drain the boiler and system completely and shut off make-up water supply.

b.Open main line power disconnect switch to boiler. Remove the fuses or secure the switch so that the power cannot be turned on accidentally.

2.Be certain that the boiler and system are refilled before returning to service.

Always keep the manual fuel supply CAUTION valve shut off if the burner is shut

down for an extended period of time.

18

Image 20
Contents Series WBV/WV Table of Contents Special Attention Boxes Using this ManualInstallation Clearance Preinstallation ClearancesAIR for Combustion and Ventilation Required from Jacket Recommended From Jacket forInstallation Survey Chimney / Vent and Draft ControlPlanning the Layout Old New CommentsBoiler Placement and Assembly Setting the BoilerConnecting the Flue Outlet Jacket Assembly Knockdown BoilersSteam boiler Pressure Test Block Assembly Piping and ControlsBoiler Return Clearance Water Boiler PipingTankless Heater or Coverplate ControlsFloat Low Water Cut-off General Burner WiringElectrical Water Boilers, Knockdown Steam with Float Low Water Cut-Off Zoning with Circulators Burner Setup & Boiler Operation Burner InstallationBurner START-UP and Adjustment Check Boiler ControlsClean the Boiler Steam Boilers only Cleaning the boiler requires the useHago 85 x 60 B HagoDEL 65 60 B HagoMaintenance Daily Maintenance with Boiler Operating Weekly Maintenance with Boiler OperatingMaintenance of Safety Relief Valve Monthly Maintenance with Boiler OperatingIf a Long Shutdown is Required Opened to facilitate this operationBoiler Dimensions & Ratings Boiler Jacket Rear of Jacket to TopDepth Boiler Jacket Rear of Jacket toWater Content HeatingCapacity InputRepair Parts Item No Stock Code Description Additional InformationPage Page Series WBV/WV