Weather seal |
Level |
Bottom section |
Wooden shims |
(If necessary) |
12 | Vertical Tracks |
Tools: Power Drill, 3/16” Drill bit, 7/16” Socket driver, Tape measure, |
IMPORTANT: If your door is to be installed prior to a finishing construction of the building’s floor, the vertical tracks and the door bottom section assembly should be installed such that when the floor is constructed, no door or track parts are trapped in the floor construction.
Important: The tops of the vertical tracks must be level from side to side. If the bottom section was shimmed to level it, the vertical track on the shimmed side must be raised the height of the shim.
Position the left hand vertical track assembly / wall angle track assembly over the track rollers of the bottom section. Make sure the counterbalance lift cable is located between the track rollers and the door jamb. Drill 3/16” pilot holes into the door jamb for the lag screws.
For flag angle track assemblies:
Loosely fasten jamb brackets and flag angle to the jamb using 5/16” x
For wall angle track assembly:
Loosely fasten wall angle to the jamb using 5/16” x
If you have 2” vertical tracks:
Tighten lag screws, securing the bottom jamb bracket/bottom slot to jamb, maintain 3/8” to 5/8” spacing, between the bottom section and vertical track.
If you have 3” vertical tracks:
Tighten lag screws, securing the bottom jamb bracket/bottom slot to jamb, maintain 1/2” to 3/4” spacing, between the bottom section and vertical track.
Hang counterbalance lift cable over flag angle/wall angle. Repeat same process for other side.
Wallangle | Riveted track |
|
|
|
track |
|
|
| |
assembly | flag angle |
|
|
|
| shown |
|
|
|
|
|
| Lag |
|
|
|
| screw |
|
|
|
| locations |
|
| 5/16” x |
|
|
|
| Lag screws |
|
|
|
| Jamb |
|
|
|
| bracket | Flag | Fully Adjustable | Riveted |
|
| |||
|
| angle | flag angle | flag angle |
| Bottom | 2” Vertical track | Bottom | |
| section | |||
| spacing (3/8” to 5/8”) | section | ||
|
| |||
| Track | 3” Vertical track |
| |
| spacing (1/2” to 3/4”) |
| ||
| rollers |
| ||
|
|
|
| |
| Vertical track | Floor |
| Track roller |
|
|
|
| |
| assembly |
|
|
|
13 | Stacking Sections |
Tools: Power drill,7/16” Socket driver |
Note: Make sure graduated end and center hinges are flipped down, when stacking another section on top.
With assistance, lift intermediate I (second) section and guide the track rollers / tandem rollers into the vertical tracks. Lower section until it is seated against bottom section. Keep sections aligned. Repeat same process for other sections, except top section.
For Graduated end hinges and Center Hinges:
Starting with the outer graduated end hinges, flip the upper hinge leaf up and secure to the section using (2)
If you have double graduated end hinges, flip the inner upper hinge leaf up and use it as a template. Mark and
If you have half center hinges:
Flip the upper hinge leaf up and use it as a template. Mark and
(2)
IMPORTANT: Be extremely careful not to drill thru the section. Only drill 1” deep.
Important: Push & hold the hinge leafs securely against the sections while securing with
Typical graduated end hinge with typical long stem tandem track roller
Intermediate I section
Left double graduated end hinge with typical long stem track roller
Vertical tracks
Right double graduated | Bottom section | |
|
| |
end hinge with typical |
|
|
long stem track roller |
|
|
(2) | ||
Left single |
| Right single |
graduated end |
| |
hinge with | Center | graduated end hinge |
typical short | with typical short | |
stem track roller | hinge(s) | stem track roller |
(2) | Upper hinge leaf | |
Lag screws |
Typical sections shown | Half center hinge |
|
Long strut (if applicable)
14 | Top Section |
Tools: Hammer, Step ladder, Tape measure |
Place the top section in the opening. Temporarily secure the top section by driving a nail into the header near the center of the door and bending it over the top section. Now, flip up the graduated end hinge and center hinge leaves, hold tight against section, and fasten center hinges first and end hinges last (refer to step, Stacking Sections). Vertical track alignment is critical. For 2” track, position flag angle/wall angle between
Flag angles/wall angles must be parallel to the door sections. Repeat same process for other
10