Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller manual Maintenance

Page 44

MAINTENANCE

44

Image 44
Contents Munchkin High Efficiency Heater With the 925 ControllerUsing this Manual Special Attention BoxesTable of Contents HOW IT Operates Munchkin Ratings and DimensionsPart 1. General Information Recommended Service Clearances Dimensions 80M 140M/199M PRE-INSTALLATION Requirement GeneralElectrical Connection Part 2. ElectricalPressure Relief Valve Electrical Connection Wiring Directly to Central Heating Circulator Part 3. GAS Connection GAS ConnectionGAS Piping GAS TableDungs GAS Valve Part 4. Venting Approved Venting MaterialsVenting the Munchkin Direct vent terminal clearance Minimum clearance, C Longer Vent Runs Vented ApplianceHeater Removal from a Common Vent System Condensate RemovalDiagrams for Sidewall Venting Venting Diagrams for Vertical Venting Part 5. Piping Hydronic Piping with Circulators or Zone ValvesCirculator Sizing Munchkin T50M Munchkin T80M/80M Munchkin 140M Munchkin 199MFill and Purge Heating System Piping Symbol Legend Piping IllustrationsOFF Zone valves Piping Zone valves Make-up water Piping Space heating zone circuit Zone Circulators Make-up water PB1 PB2 PB1 PB2 Items to be Checked Before Lighting the Munchkin Part 6. START-UP ProceduresSequence of Operation Lighting Instructions Operating InstructionsAdjusting the Temperature on the Munchkin Display Status MenuTest Mode To Turn OFF GAS to AppliancePart 7. Troubleshooting Munchkin Error Code925 Control Board Error Codes Resistance Tables Part 8. Maintenance Maintenance Procedures Condensate Cleaning Instructions Before Each Heating SeasonMaintenance Control Wiring Layout Munchkin ControllerMaintenance Maintenance Page Page Munchkin R1