GENERAL

5

From vertical drain pipes or soil

25 mm ( 1”) ***

 

pipes*

 

 

 

 

6

From an internal or external corner

25 mm ( 1”) ***

 

or to a boundary along side the

 

 

terminal

 

 

 

 

7

Above adjacent ground, roof or

300 mm (12”)

 

balcony level

 

 

 

 

8

From a surface or a boundary

600 mm (24”)

 

facing the terminal.

 

 

 

 

9

From a terminal facing a terminal

1200 mm (48”)

 

 

 

10

From an opening in a car port (e.g.

1200 mm (48”)

 

door or window) into dwelling

 

 

 

 

11

Vertically from a terminal on the

1500 mm (60”)

 

same wall

 

 

 

 

12

Horizontally from a terminal on the

300 mm (12”)

 

wall

 

 

 

 

*If the terminal is within 150mm of any vertical soil or drain pipe, an aluminium shield at least 400mm (15 3/4”) long should be fitted equi---distant from the terminal and close to the pipe.

***Only 1 spacing down to 25mm is allowable per installation.

Vertical Terminals

13

Above the roof pitch with roof

300 mm (12”)

 

slope of all angles.

 

 

Above flat roof

300 mm (12”)

 

 

 

14

From single wall face

600 mm (24”)

 

From corner wall faces

1000 mm (40”)

 

 

 

 

Twin Flue Applications

 

 

 

15

Centre distance between air inlet

120mm (5”) **

 

and flue outlet ducts

 

 

 

 

**Where the twin flue ducts are positioned at or near the above minimum centres the wall sealing gaskets should be trimmed to allow them to fit flat to the wall. This should be done for both in- side and outside wall gaskets

Terminals guards are available from boiler suppliers --- ask for Tower Flue Guard, Model K6. In case of difficulty seek advice from:

Grasslin UK Ltd.,Tower house, Vale Rise, Tonbridge, Kent TN9 1TB Tel. +44 (0) 1732 359 888 Fax No. +44 (0) 1732 354 455 www.tfc---group.co.uk

IMPORTANT It is absolutely ESSENTIAL to ensure, in practice, that products of combustion discharging from the terminal cannot re---enter the building or any other adjacent building through ventilators, windows, doors other sources of natural air infiltration, or forced ventilation / air conditioning.

If this should occur the appliance MUST be turned OFF, labelled as “unsafe” until corrective action taken.

WATER CIRCULATION SYSTEM

The boilers are designed for connection to pressurised, fully pumped, sealed water central heating systems ONLY. The domestic hot water (DHW) calorifier is incorporated within the combi boiler and only requires connection to the mains water supply.

Additional Pumps.

The boiler is supplied with an integral circulating pump. If the boiler is to be used in conjunction with any additional circulating pumps, please contact the Technical Helpline for advice on application.

IMPORTANT

A minimum length of 1m of copper pipe MUST be fitted to both flow and return connections from the boiler before connection to any plastic piping.

Ensure that the mains water supply pressure is adequate to provide the required DHW flow rate. Refer to Table 1 on page 4.

The central heating system should be in accordance with BS. 6798 and, in addition, for smallbore and microbore systems BS. 5449.

The domestic hot water system should be in accordance with BS. 5546 and BS. 6700.

Copper tubing to BS 2871:1 is recommended for water carrying pipework and MUST be used for pipework carrying potable water.

Any soldered joints on potable water pipework MUST NOT be made with solder containing lead.

Ancillary pipework not forming part of the useful heating surface should be lagged to prevent heat loss and any possible freezing --- particularly where pipes run through roof spaces or ventilated underfloor spaces.

Draining taps should be at least 1/2” BSP nominal size and be in accordance with BS 2879.

WATER TREATMENT

Central Heating

Antifreeze fluid, corrosion and scale inhibitor fluids suitable for use with boilers having copper heat exchangers may be used in the central heating system.

IMPORTANT

The application of any other treatment to this product may render the guarantee of Caradon Ideal Limited

INVALID.

Caradon Ideal Limited recommend Water Treatment in accordance with the Benchmark Guidance Notes on Water Treatment in Central Heating Systems.

Caradon Ideal Limited recommend the use of Fernox, GE Betz Sentinel or Salamander water treatment products, which must be used in accordance with the manufacturers instructions.

Notes.

1.It is most important that the correct concentration of the water treatment products is maintained in accordance with the manufacturers’ instructions.

AIR SUPPLY

It is NOT necessary to have a purpose---provided air vent in the room or internal space in which the boiler is installed. Neither is it necessary to ventilate a cupboard or compartment in which the boiler is installed, due to the low surface temperatures of the boiler casing during operation; therefore the requirements of BS6798, Clause 12, BS 5440:2 and in IE I.S. 813:2002 may be disregarded.

2.If the boiler is installed in an existing system any unsuitable additives MUST be removed by thorough cleansing.

BS 7593:2006 details the steps necessary to clean a domestic heating system.

3.In hard water areas, treatment to prevent lime scale may be necessary --- however, the use of artificially softened water is NOT permitted.

4.Under no circumstances should the boiler be fired before the system has been thoroughly flushed.

mini HE --- Installation & Servicing

9

Image 9
Contents Installation and servicing Mini HE --- Installation & Servicing Document Amendments Boiler Data GeneralPerformance Data --- Central Heating Domestic Hot WaterBenchmark Commissioning Checklist Details ContentsBoiler Clearances General Boiler Water ConnectionIntroduction GAS SafetyOptional Extra Kits Safe HandlingGAS Supply Flue Installation RequirementsSafe Handling of Substances Location of Boiler and Flue OutletWater Treatment Water Circulation SystemAIR Supply Additional PumpsRequirements Electrical SupplyMini HE C24, mini HE C28 Size of expansion vesselHydraulic Loss Remaining pump capacity Domestic HOT Water Requirements General Boiler Control InterlocksGeneral Boiler Water Circuit Diagram Installation Boiler Assembly InstallationPack a contents Installation UnpackingHardware pack contents Pack B contentsFitting the Flue System InstallationRefer to the following diagram for the model mini HE C32 Rear Flue AssemblyTwin Pipe Flue DuctWall Mounting Template rear flue Installation Cutting the Flue RingFitting the Extension Kits Roof Flue KIT CONTENTS/OPTIONS Installation Fitting the Optional Roof FlueFlue Arrangement Installation Flue Terminal PositionFlue over 3 meters long Assembling the Roof Flue KITFit the service valves, washers and tail pipes as shown Installation Fitting the Wall Mounting PlateMounting the Boiler ConnectionsCondensate Drain Safety Valve DrainLocate the gasket and flue turret on the top of the boiler Flues over 1 meter longFor external controls wiring see frame Incoming mains wiring detailElectrical Connections Pictorial Wiring Control pcb Installation Functional Flow DiagramElectrical Connections for a Combi Boiler External Electrical ControlsInstallation Initial Lighting To Adjust Pressures Maximum valve settingMinimum valve setting Commissioning and Testing Anti Cycling SettingElectrical Installation Gas InstallationGeneral Checks Handing Over Installation GAS ConversionServicing Schedule ServicingServicing Removal of Outer and Inner Casing Cleaning the Heat Exchanger Servicing Burner Removal and CleaningRE---ASSEMBLY Burner Pressure CheckRemove the fan by sliding it towards left see the arrow Servicing FAN and Venturi Removal and CleaningBurner Replacement Spark and Detection Electrode ReplacementBurner Injectors Replacement When replacing any componentFlue Temperature Probe Replacement Servicing Overheat Thermostat ReplacementTemperature Probe Replacement Removal of CH temperature probeExpansion Vessel Replacement GAS Valve ReplacementServicing FAN Replacement Venturi ReplacementAIR Pressure Switch Replacement Pump Replacement Complete Servicing Electronic CONTROL/IGNITION PCB Replacement Boiler mode setting CH Flow Switch Membrane Replacement Servicing CH Flow Switch ReplacementServicing DHW Flow Switch Replacement DHW Filter and Flow Limiter ReplacementFlow limiter Recuperator Replacement Servicing Primary Heat Exchanger ReplacementDiverter Valve Internal Parts Replacement Servicing Diverter Valve Actuator ReplacementCH Drain Cock Replacement Servicing DHW Heat Exchanger ReplacementCondensate Trap Replacement To clean the condensate trap and drainTo replace the condensate trap OFF Normal operationFinding Fault FindingFrom Fault finding Fault Finding Fault Refer back to page 52 of fault finding to continue Fault Finding From 075535 Burner mod. mini HE C28, mini HE C32Fan mod. mini HE C28, mini HE C32 17398422 23 Installer Notification Guidelines GAS Boiler Commissioning Checklist Service Interval Record Ideal boilers Technical TrainingInstaller the contact fire not does Installer Water hot orCorrectly Ignition at attempt Maintenance CleaningGAS of Escape Lights Diagnostic Boiler the Light toClearances Minimum

C28, C24, C32 specifications

The Mamiya C series is celebrated among photography enthusiasts for its unique twin-lens reflex (TLR) design, offering both a classic aesthetic and innovative features that set it apart in the world of medium format cameras. The C32, C24, and C28 models represent a range of technology and design advancements that cater to various shooting needs.

The Mamiya C32, introduced in the early 1970s, is renowned for its precision engineering and versatility. This model features interchangeable lenses, allowing photographers to switch between different focal lengths for creative flexibility. The camera supports 120 and 220 film formats, enabling higher film capacities for extended shooting sessions. An essential feature of the C32 is its built-in light meter, which enhances exposure accuracy by providing real-time readings. The camera's bright waist-level finder offers excellent viewing comfort and composition aid, attracting those who appreciate a more hands-on shooting experience.

Next in line, the Mamiya C24 offers a slightly more compact and lighter design, making it an appealing option for documentary and street photographers. While still featuring the electronic leaf shutter system utilized in the C32, the C24 omits built-in metering, which encourages users to develop their exposure skills. The lens selection remains robust, with options ranging from wide-angle to telephoto, allowing for creative versatility. The C24's rugged build quality and reliable shutter performance make it a trusted companion in various shooting conditions.

Lastly, the Mamiya C28 provides a perfect blend of portability and advanced capabilities. With its ergonomic design and improved lens coatings, the C28 offers enhanced image quality with better contrast and sharpness. Similar to its predecessors, it utilizes an interchangeable lens system but enhances user convenience through quick-to-use shutter speeds and aperture settings. The camera is also compatible with a range of accessories, such as flash units and close-up attachments, further expanding its creative potential.

In summary, the Mamiya C32, C24, and C28 each present unique features and technological advancements that cater to various types of photographers. Whether it's the precision of the C32, the compact convenience of the C24, or the versatile performance of the C28, these cameras maintain a special place in the hearts of medium format enthusiasts, showcasing the blend of craftsmanship and innovation that Mamiya is known for.