Mamiya C24, C32, C28 manual Correctly Ignition at attempt, Installer the contact fire not does

Page 65

.137 322 London .No Registration .448858 01482 .Fax 492251 01482 .Tel .4JN HU5 Hull, Upon Kingston Ave, National 103, Box .O.P Boilers, Ideal

.notice without specification vary to reserved therefore is right The .products its of performance and design the in improvement continuing of policy a pursues limited Ideal Caradon

com.idealboilers.www 498660 01482 Helpline: Consumer Ideal

.supply water mains cold incoming the of temperature varying the to relevant is but appliance the with fault a not is This

.months summer warmer the in achieved temperatures same the achieve to taps outlet the at reduced be to need will rate flow the

that months winter colder the in likely is it months winter and summer the during varies main cold the of temperature ambient the As

.rise temperature Cû35 a achieve to instructions), installation boiler the in shown (as rates, flow stated the at water hot domestic supply

to boiler the through directly supply water mains incoming the from directly water up heat to is boilers combination all of nature The

 

 

 

heating

F

 

central for setting winter the at set is (C) control temperature radiator the Check

 

installer your contact respond not does this If --- up fully turning by thermostat

F

 

room the Test --- temperature required the at set is thermostat room the Check

heating central for

installer your contact operate not does still it If --- period “on” an at

F

operate not will but water hot for Operating

set is channel heating central the that check programmer external an with fitted If

 

installer your contact operate not does still it If ---“auto” to set is

F

 

switch function the and period “on” an to set is programmer integral that Check

 

.correctly

F

ignition at attempt

fitted are boiler, the of top on caps, test switch pressure air the that Check

no is there but continuosly run pump & Fan

supplier gas the Contact --- fault boiler a not is this then

 

lockout ignition to goes then and water

F

hot or heating central either for fire not will

supply gas no If etc) cooker/fire appliance gas another (try supply gas Check

but sequence ignition through goes Boiler

 

 

installer the contact fire not does

F

 

still boiler If --- (D) button reset boiler Press --- alight (E) lamp signal lockout the Is

 

installer

 

water hot or

your contact then filling after drop to continues pressure the if or so do to unable

 

If .boiler the reset to (D) button reset the press and loop filling the on tap the off

 

heating central for working not is Boiler

 

 

turn installer), your contact unsure (if bar 1 to loop filling the via pressurise---re not If

F

 

.bar 1 of minimum a shows boiler on gauge pressure Check

 

installer the contact --- fault boiler a not is this not If .seconds 4 every flashing

F

 

and alight (A) LED green side hand left the is .e.i boiler the to power there Is

 

Solution

 

Problem

Faults Product Non Typical --- Troubleshooting

.engineer the by gained not is access where visit arranged--- pre any for or visit, the for charge a levy to right the reserve we

appliance the with than other be to found be problem the Should .visit engineers service a requesting to prior boiler the to external

problems any identify to guide following the through check you that ask would we policy warranty current our with line In .Note

User Boiler for Points

Image 65
Contents Installation and servicing Mini HE --- Installation & Servicing Document Amendments Boiler Data GeneralPerformance Data --- Central Heating Domestic Hot WaterBenchmark Commissioning Checklist Details ContentsBoiler Clearances General Boiler Water ConnectionIntroduction GAS SafetyOptional Extra Kits Safe HandlingGAS Supply Flue Installation RequirementsSafe Handling of Substances Location of Boiler and Flue OutletWater Treatment Water Circulation SystemAIR Supply Additional PumpsRequirements Electrical SupplyHydraulic Loss Remaining pump capacity Mini HE C24, mini HE C28Size of expansion vessel Domestic HOT Water Requirements General Boiler Control InterlocksGeneral Boiler Water Circuit Diagram Installation Boiler Assembly InstallationPack a contents Installation UnpackingHardware pack contents Pack B contentsFitting the Flue System InstallationRefer to the following diagram for the model mini HE C32 Rear Flue AssemblyTwin Pipe Flue DuctWall Mounting Template rear flue Fitting the Extension Kits Installation Cutting the FlueRing Roof Flue KIT CONTENTS/OPTIONS Installation Fitting the Optional Roof FlueFlue Arrangement Installation Flue Terminal PositionFlue over 3 meters long Assembling the Roof Flue KITFit the service valves, washers and tail pipes as shown Installation Fitting the Wall Mounting PlateMounting the Boiler ConnectionsCondensate Drain Safety Valve DrainLocate the gasket and flue turret on the top of the boiler Flues over 1 meter longElectrical Connections For external controls wiring see frameIncoming mains wiring detail Pictorial Wiring Control pcb Installation Functional Flow DiagramElectrical Connections for a Combi Boiler External Electrical ControlsInstallation Initial Lighting Minimum valve setting To Adjust PressuresMaximum valve setting Commissioning and Testing Anti Cycling SettingElectrical Installation Gas InstallationGeneral Checks Handing Over Installation GAS ConversionServicing Schedule ServicingServicing Removal of Outer and Inner Casing Cleaning the Heat Exchanger Servicing Burner Removal and CleaningRE---ASSEMBLY Burner Pressure CheckRemove the fan by sliding it towards left see the arrow Servicing FAN and Venturi Removal and CleaningBurner Replacement Spark and Detection Electrode ReplacementBurner Injectors Replacement When replacing any componentFlue Temperature Probe Replacement Servicing Overheat Thermostat ReplacementTemperature Probe Replacement Removal of CH temperature probeExpansion Vessel Replacement GAS Valve ReplacementAIR Pressure Switch Replacement Servicing FAN ReplacementVenturi Replacement Pump Replacement Complete Servicing Electronic CONTROL/IGNITION PCB Replacement Boiler mode setting CH Flow Switch Membrane Replacement Servicing CH Flow Switch ReplacementFlow limiter Servicing DHW Flow Switch ReplacementDHW Filter and Flow Limiter Replacement Recuperator Replacement Servicing Primary Heat Exchanger ReplacementDiverter Valve Internal Parts Replacement Servicing Diverter Valve Actuator ReplacementCH Drain Cock Replacement Servicing DHW Heat Exchanger ReplacementTo replace the condensate trap Condensate Trap ReplacementTo clean the condensate trap and drain OFF Normal operationFinding Fault FindingFrom Fault finding Fault Finding Fault Refer back to page 52 of fault finding to continue Fault Finding From 075535 Burner mod. mini HE C28, mini HE C32Fan mod. mini HE C28, mini HE C32 17398422 23 Installer Notification Guidelines GAS Boiler Commissioning Checklist Service Interval Record Ideal boilers Technical TrainingCorrectly Ignition at attempt Installer the contact fire not doesInstaller Water hot or GAS of Escape MaintenanceCleaning Clearances Minimum Lights DiagnosticBoiler the Light to

C28, C24, C32 specifications

The Mamiya C series is celebrated among photography enthusiasts for its unique twin-lens reflex (TLR) design, offering both a classic aesthetic and innovative features that set it apart in the world of medium format cameras. The C32, C24, and C28 models represent a range of technology and design advancements that cater to various shooting needs.

The Mamiya C32, introduced in the early 1970s, is renowned for its precision engineering and versatility. This model features interchangeable lenses, allowing photographers to switch between different focal lengths for creative flexibility. The camera supports 120 and 220 film formats, enabling higher film capacities for extended shooting sessions. An essential feature of the C32 is its built-in light meter, which enhances exposure accuracy by providing real-time readings. The camera's bright waist-level finder offers excellent viewing comfort and composition aid, attracting those who appreciate a more hands-on shooting experience.

Next in line, the Mamiya C24 offers a slightly more compact and lighter design, making it an appealing option for documentary and street photographers. While still featuring the electronic leaf shutter system utilized in the C32, the C24 omits built-in metering, which encourages users to develop their exposure skills. The lens selection remains robust, with options ranging from wide-angle to telephoto, allowing for creative versatility. The C24's rugged build quality and reliable shutter performance make it a trusted companion in various shooting conditions.

Lastly, the Mamiya C28 provides a perfect blend of portability and advanced capabilities. With its ergonomic design and improved lens coatings, the C28 offers enhanced image quality with better contrast and sharpness. Similar to its predecessors, it utilizes an interchangeable lens system but enhances user convenience through quick-to-use shutter speeds and aperture settings. The camera is also compatible with a range of accessories, such as flash units and close-up attachments, further expanding its creative potential.

In summary, the Mamiya C32, C24, and C28 each present unique features and technological advancements that cater to various types of photographers. Whether it's the precision of the C32, the compact convenience of the C24, or the versatile performance of the C28, these cameras maintain a special place in the hearts of medium format enthusiasts, showcasing the blend of craftsmanship and innovation that Mamiya is known for.