
Chapter 4
Installing the Switch and its Power Supplies
The procedures in this chapter are:
“Installing the Power Cord Retaining Clip” on page 62
“Installing Power Supply Modules” on page 63
“Installing the Switches on a Table or Desktop” on page 66
“Installing the Switch in an Equipment Rack” on page 67
“Connecting AC Power to a Power Supply Module” on page 70
“Starting a Local Management Session” on page 72
“Monitoring the Initialization Processes” on page 73
61