Allied Telesis AT-IX5-28GPX manual Switch Initialization Messages

Models: AT-IX5-28GPX

1 129
Download 129 pages 53.38 Kb
Page 74
Image 74
Figure 31. Switch Initialization Messages

Chapter 4: Installing the Switch and its Power Supplies

Figure 31. Switch Initialization Messages

Starting base/loopback...

[

OK

]

Starting base/poe_done...

[

OK

]

Starting base/sysctl...

[

OK

]

Received event poefw.done

 

 

 

Starting base/portmapper...

[

OK

]

Received event syslog.done

 

 

 

Starting base/reboot-stability...

[

OK

]

Starting base/autofs-card...

[

OK

]

Checking system reboot stability...

[

OK

]

Starting base/cron...

[

OK

]

Starting base/appmond...

[

OK

]

Starting hardware/openhpi...

[

OK

]

Starting hardware/timeout...

[

OK

]

Starting base/inet...

[

OK

]

Starting base/modules...

[

OK

]

Received event modules.done

 

 

 

Received event board.inserted

 

 

 

Received event hardware.done

 

 

 

Starting network/startup...

[

OK

]

Starting network/stackd...

[

OK

]

Starting network/election.timeout...

[

OK

]

Received event network.enabled

 

 

 

Initializing HA processes:

openhpid, hostd, cntrd, nsm, auth, epsr, hsl imiproxyd, irdpd, lldpd, loopprot, mstp rmon, sflowd, udldd, vrrpd, imi

lacp, pdmd

Received event network.initialized

03:44:11 awplus-1 VCS[826]: No neighboring members found, unit may be in a stand alone configuration

03:44:11 awplus-1 VCS[826]: Startup speed can be improved by adding 'no stack 1 enable' to configuration

Received event vcs.elected-master

03:44:11 awplus-1 VCS[826]: Member 1 (0015.774f.ed30) has become the Active Master

Figure 32. Switch Initialization Messages (Continued)

74

Page 74
Image 74
Allied Telesis AT-IX5-28GPX manual Switch Initialization Messages Continued