Allied Telesis AT-IX5-28GPX Installing Power Supply Modules, Overview Installing a Power Supply

Models: AT-IX5-28GPX

1 129
Download 129 pages 53.38 Kb
Page 63
Image 63
Installing Power Supply Modules

IX5-28GPX Installation Guide

Installing Power Supply Modules

Overview

Installing a Power Supply

The AT-IX5-28GPX switch has two rear slots for hot-swappable power supplies. You can install one or two AT-PWR800 power supplies.

The switch is supplied with a factory installed blank panel that covers both power supply slots, and with a separate blank panel to use if you only install one power supply.

The installation procedure is identical for each power supply.

To install a power supply, perform the following procedure:

1. Remove the module from the shipping package.

Note

Store the packaging material in a safe location. You must use the original shipping material if you need to return the unit to Allied Telesis.

2.Remove the blank panel from the power supply slots on the rear panel of the switch by unscrewing it, as shown in the following figure.

Figure 19. Removing the rear panel

63

Page 63
Image 63
Allied Telesis AT-IX5-28GPX manual Installing Power Supply Modules, Overview Installing a Power Supply