Allied Telesis AT-IX5-28GPX manual Switch Initialization Messages Continued

Models: AT-IX5-28GPX

1 129
Download 129 pages 53.38 Kb
Page 75
Image 75
lldpd, loopprotd, mstpd, authd, epsrd, imi, imiproxyd

IX5-28GPX Installation Guide

Assigning Active Workload to HA processes: hsl, nsm, rmond, sflowd, vrrpd, irdpd, lacpd

lldpd, loopprotd, mstpd, authd, epsrd, imi, imiproxyd

Received event network.activated

Loading default configuration

Warning: flash:/default.cfg does not exist, loading factory defaults.

..

done!

Received event network.configured

awplus login:

Figure 33. Switch Initialization Messages (Continued)

75

Page 75
Image 75
Allied Telesis AT-IX5-28GPX Switch Initialization Messages Continued, done Received event network.configured awplus login