Allied Telesis AT-IX5-28GPX manual Restart the switch with the REBOOT command, as shown in Figure

Models: AT-IX5-28GPX

1 129
Download 129 pages 53.38 Kb
Page 89
Image 89
8.Restart the switch with the REBOOT command, as shown in Figure 49.

IX5-28GPX Installation Guide

8.Restart the switch with the REBOOT command, as shown in Figure 49.

awplus# reboot reboot system? (y/n): awplus#

Figure 49. Rebooting the Switch with the REBOOT Command

9.Type “Y” for yes.

10.Wait one minute for the switch to initialize its management software.

11.Check the ID LED and do one of the following:

ˆIf the ID LED is displaying the number 1, 2, 3, or 4, VCStack is now enabled on the switch. Power off the switch by disconnecting the power cord and repeat the procedures in this chapter on the next switch. If there are no further switches to test, go to Chapter 7, “Cabling the Stacking Ports” on page 91.

ˆIf the ID LED is still displaying “0,” repeat this procedure. If the procedure was not successful, it might be because you did not issue the WRITE command in step 5 to save your change.

89

Page 89
Image 89
Allied Telesis AT-IX5-28GPX manual Restart the switch with the REBOOT command, as shown in Figure