Figures

 

Figure 50: Removing the Dust Plug from the S1 Slot

92

Figure 51: Removing the Dust Cover from the AT-StackXS/1.0 Transceiver

93

Figure 52: Installing the AT-StackXS/1.0 Transceiver in Slot S1

94

Figure 53: Removing the Dust Plug from the S2 Slot

95

Figure 54: Installing the AT-StackXS/1.0 Transceiver in Slot S2

96

Figure 55: Handle on the AT-StackOP/0.3 and AT-StackOP/9.0 Transceivers

97

Figure 56: Installing the AT-StackOP/0.3 or AT-StackOP/9.0 Transceiver

98

Figure 57: Removing the Dust Cover from a Stacking Transceiver

99

Figure 58: Positioning the Handle in the Upright Position

99

Figure 59: Connecting the Fiber Optic Cable to the Stacking Transceiver

100

Figure 60: SHOW STACK Command

106

Figure 61: Moving to the Global Configuration Mode with the CONFIGURE TERMINAL Command

107

Figure 62: Returning to the Privileged Exec Mode

107

Figure 63: Saving the Priority Values with the WRITE Command

108

Figure 64: Removing the Dust Plug from an SFP+ Slot

113

Figure 65: Installing an SFP or SFP+ Transceiver

114

Figure 66: Removing the Dust Cover from an SFP or SFP+ Transceiver

114

Figure 67: Positioning the SFP or SFP+ Handle in the Upright Position

115

Figure 68: Connecting a Fiber Optic Cable to an SFP or SFP+ Transceiver

115

Figure 69: RJ-45 Socket Pin Layout (Front View)

125

8

Page 8
Image 8
Allied Telesis AT-IX5-28GPX manual Figures