Manuals
/
Allied Telesis
/
Computer Equipment
/
Switch
Allied Telesis
AT-IX5-28GPX
manual
Configuring the Switch for Stand-alone Operations
Models:
AT-IX5-28GPX
1
84
129
129
Download
129 pages
53.38 Kb
81
82
83
84
85
86
87
88
Troubleshooting
Specification
Install
Pin MDI Signal MDI-X Signal
Wiring Implementation
Setting the Priority Numbers
Reviewing Safety Precautions
Safety
Ieee Powered Device Classes
Features
Page 84
Image 84
Chapter 5: Configuring the Switch for
Stand-alone
Operations
84
Page 83
Page 85
Page 84
Image 84
Page 83
Page 85
Contents
Installation Guide
Page
Electrical Safety and Emissions Standards
Translated Safety Statements
Contents
Powering On the Switches Individually
Figures
Figures
Ieee Powered Device Classes
Tables
Tables
Preface
Document Conventions
Contacting Allied Telesis
Preface
Overview
Chapter
Features
10/100/1000 Mbps Twisted Pair Ports
Stacking Slots LEDs Installation Options MAC Address Table
Management Software Interfaces Methods
Front panel of the AT-IX5-28GPX switch is shown in Figure
Front and Rear Panels
Management Panel
AT-IX5-28GPX Management Panel
Speed Duplex Mode Wiring Configuration
10/100/1000Base-T Twisted Pair Ports
Maximum Distance Cable Requirements Port Pinouts
Power Over Ethernet
Powered Device Classes
Cable Type 1000Mbps Non-PoE PoE+
Port Prioritization
Wiring Implementation
SFP+ Slots
Stacking SFP+ Slots
Eco-friendly Button
LEDs
LEDs for the Twisted Pair Ports
LEDs for SFP+ Slots
SFP+ Slot LEDs
LEDs for the Stacking Slots
Switch ID LED
Switch ID LEDs in the Low Power Mode
USB Port
Console Port
Power Supplies
AT-PWR800 Power Supply
Virtual Chassis Stacking
Overview
Stacking Slots
Stacking Transceivers
Stacking Cable Type Operating Distance
IX5-28GPX Installation Guide
Stacking Port Topologies
Stack in on page 45 has four switches in the linear topology
Stack of Two Switches in the Ring Topology
2697
Master and Member Switches
Selection of the Master Switch
IX5-28GPX Installation Guide
Specifying Ports in the Command Line Interface
Port1.0.n
Beginning the Installation
Reviewing Safety Precautions
X510 Series Installation Guide for Virtual Chassis Stacking
Beginning the Installation
X510 Series Installation Guide for Virtual Chassis Stacking
Choosing a Site for the Switches
Planning a Stack
Operating Distances of the AT-StackOP/0.3 Transceiver
Unpacking the Switch
Beginning the Installation
Installing the Switch and its Power Supplies
Installing the Power Cord Retaining Clip
Installing Power Supply Modules
Overview Installing a Power Supply
Installing the AT-PWR800 Power Supply Module
PWR8000
Installing the Switches on a Table or Desktop
Installing the Switch in an Equipment Rack
Removing the Rubber Feet
Attaching the Equipment Rack Brackets
Mounting the Switch Horizontally in an Equipment Rack
Connecting AC Power to a Power Supply Module
Connecting the AC Power Cord
IX5-28GPX Installation Guide
Starting a Local Management Session
Monitoring the Initialization Processes
Switch Initialization Messages
Switch Initialization Messages
Installing the Switch and its Power Supplies
Configuring the Switch for Stand-alone Operations
Configuring the Switch for Stand-alone Operations
Disabling VCStack
No stack id enable
Awplusconfig# no stack 1 enable
Confirming Status VCStack Feature
Show interface port1.0.27
Status of a Stacking Slot When VCStack is Enabled
Port1.0.n
Configuring the Switch for Stand-alone Operations
Verifying the Status of VCStack and Activating VCStack
Verifying the Status of VCStack
Activating the VCStack Feature
Activating VCStack
Awplusconfig# exit awplus#
Awplus# reboot reboot system? y/n awplus#
Verifying the Status of VCStack and Activating VCStack
Cabling the Stacking Ports
Cabling Switches with AT-StackXS/1.0 Transceivers
Removing the Dust Cover from the AT-StackXS/1.0 Transceiver
Installing the AT-StackXS/1.0 Transceiver in Slot S1
SFP+ CON
SFP+
Handle on the AT-StackOP/0.3 and AT-StackOP/9.0 Transceivers
Installing the AT-StackOP/0.3 or AT-StackOP/9.0 Transceiver
Positioning the Handle in the Upright Position
100
Powering On the Stack
Plus Operating System for IX5-28GPX Switches
Powering On the Switches Individually
103
Powering On the Switches Simultaneously
105
Verifying the Stack
Awplus show stack
Setting the Priority Numbers
Stack IDnumber priority priority
108
Cabling the Networking Ports
Cabling the Twisted Pair Ports
111
Installing SFP and SFP+ Transceivers
On page 113 shows the dust plug being removed from a port
Removing the Dust Cover from an SFP or SFP+ Transceiver
115
Cabling the Networking Ports 116
Troubleshooting
Try inserting the PSU into the other PSU bay
118
119
120
121
Troubleshooting 122
Technical Specifications
Physical Specifications
Environmental Specifications
Appendix a
Power Specifications
Certifications
Pin MDI Signal MDI-X Signal
RJ-45 Twisted Pair Port Pinouts
Pinout Pair
Pin Signal
RJ-45 Style Serial Console Port Pinouts
128
129
Top
Page
Image
Contents