Installing the Switch in an Equipment Rack
This procedure requires the following items:
Twelve bracket screws (included with the switch)
Two equipment rack brackets (included with the switch)
Four standard equipment rack screws (not provided)
Installation guidelines may be found in “Choosing a Site for the Switches” on page 56. Here is the procedure for installing the switch horizontally or vertically in a
Caution
The chassis may be heavy and awkward to lift. Allied Telesis recommends that you get assistance when mounting the chassis in an equipment rack. E28
1. Place the unit upside down on a level, secure surface.
COL | HDX | FDX | ACT | LINK 10/100 | ACT | LINK 1000 |
|
|
| S2/28 | 26 | |
|
|
|
|
|
|
CONSOLE |
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| S1/27 SFP+ | 25 |
2668
Figure 23. Turning the Switch Upside Down
2.Using a flat-head screwdriver, pry the rubber feet from the bottom of the switch, as shown in Figure 24.
2
1
2669
Figure 24. Removing the Rubber Feet