IX5-28GPX Installation Guide

Cabling Switches with AT-StackOP/0.3 or AT-StackOP/9.0 Transceivers

For guidelines to cabling the switches with AT-StackOP/0.3 or AT- StackOP/9.0 fiber optic transceivers, refer to “Planning a Stack” on page 57. To cable switches with fiber optic transceivers, perform the following procedure:

1.Remove a dust cover from either the S1 or S2 slot on the switch.

2.To install the transceiver in the S1 slot, position it with the handle on top, as shown in Figure 55. To install it in the S2 slot, position it with the handle on the bottom.

Handle

Figure 55. Handle on the AT-StackOP/0.3 and AT-StackOP/9.0

Transceivers

97

Page 97
Image 97
Allied Telesis AT-IX5-28GPX manual Handle on the AT-StackOP/0.3 and AT-StackOP/9.0 Transceivers