Lochinvar 800 operation manual Condensate disposal, Condensate drain

Page 49

Installation & Operation Manual

9Condensate disposal

Condensate drain

1.This boiler is a high efficiency appliance that produces condensate.

2.The side of the boiler has a 1/2 inch (12.7 mm) PVC union for connection of a 1/2 inch (12.7 mm) PVC pipe (FIG. 9-1).

3.Slope condensate tubing down and away from the boiler into a drain or condensate neutralizing filter. Condensate from the Knight XL will be slightly acidic (typically with a pH from 3 to 5). Install a neutralizing filter if required by local codes.

A Neutralizer Kit (FIG. 9-1) is available from the factory (KIT3087 for Models 399 - 500 and KIT3046 for Models 600 - 800).

4.Install the 1/2 inch (12.7 mm) PVC tee assembly (shipped with the unit) as shown in FIG. 9-1.

5.Leave the top of the 1/2 inch (12.7 mm) tee OPEN. This is needed as a vacuum break.

6.Do not expose condensate line to freezing temperatures.

7.Use only plastic tubing or piping as a condensate drain line (FIG. 9-1).

NOTICE

Use materials approved by the authority

having jurisdiction. In the absence of other

 

 

 

authority, PVC and CPVC pipe must comply

 

with ASTM D1785 or D2845. Cement and

 

primer must comply with ASME D2564 or

 

F493. For Canada use CSA or ULC certified

 

PVC or CPVC pipe, fittings, and cement.

 

To allow for proper drainage on large

NOTICE

horizontal runs, a second line vent may be

 

 

required and tubing size may need to increase

 

to 1 inch (25 mm).

The condensate line must remain unobstructed, allowing free flow of condensate. If condensate is allowed to freeze in the line or if the line is obstructed in any other manner, condensate can exit from the boiler tee, resulting in potential water damage to property.

8.A condensate removal pump is required if boiler is below drain. When installing a condensate pump, select one approved for use with condensing boilers and furnaces. The pump should have an overflow switch to prevent property damage from condensate spillage. The switch should be wired to the auxiliary device proving switch terminals on the low voltage connection board.

Figure 9-1Condensate Disposal

1/2" (12.7 mm) PVC TEE ASSEMBLY (FACTORY SUPPLIED)

1/2" (12.7 mm) PVC UNION (FACTORY SUPPLIED)

NEUTRALIZER KIT

FLOOR DRAIN OR DRAIN PAN

KIT3087 shown for illustration purposes.

49

Image 49 Contents
Save this manual for future reference Models 399Contents Please read before proceeding When servicing boilerKnight XL How it works Model Air pressure switch Pump relay boardModels 600 Knight XL Boiler =B=R Rating RatingsCloset and alcove installations Installation must comply withDetermine boiler location Before locating the boiler, checkTOP For closet installations, Cpvc orProvide air openings to room Residential garage installationVent and air piping Flooring and foundationProducts to avoid When using an existing vent system to install a new boilerAreas likely to have contaminants When removing a boiler from existing common vent system Remove boiler from wood pallet Prepare boilerModel Gas conversionsModels 600 Leveling the boilerGeneral venting Direct venting options Vertical Vent Requirements for installation in Canada Install vent and combustion air pipingInstalling vent or air piping General ventingApproved Stainless Steel Vent Manufacturers PVC/CPVC air intake/vent connectionsMake Stainless steel vent Air inlet pipe materialsStainless steel air intake/vent connections FasNSeal Saf-T VentRemoving from existing vent Optional room airAir contamination Model Description Kit NumberSidewall direct venting If using the alternate sidewall terminationVent/air termination sidewall Determine location3AClearance to Gravity Air Inlets Bird Screen Typical Prepare wall penetrationsMultiple vent/air terminations Prepare wall penetrations Alternate Field Supplied OptionTermination and fittings Description and usage Sidewall termination installation9Concentric Vent Dimensional Drawing Models 399 Multiventing sidewall terminations 11Concentric Vent Sidewall AttachmentVent/air termination vertical Vertical direct venting2Vertical Terminations with Multiple Boilers Prepare roof penetrations4Concentric Vertical Termination Vertical termination installationMm see -9, Multiventing vertical terminationsHydronic piping Hydronic piping Near boiler piping connections Flow switch adjustmentCirculator sizing Pressure Head Feet20F 25F 30F 35F 399 500 600 700 800Near boiler piping components 7Single Boiler Primary/Secondary Piping Number of Units Model Manifold Pipe Sizes in Inches mm Gas connections Connecting gas supply pipingPropane Gas Natural gasCheck inlet gas supply Nominal Natural Gas Pipe Capacity ChartIron Pipe Length of Pipe in Straight FeetGas Pressure Gas valve replacement Installation must comply with Field wiring Line voltage connections Auxiliary device proving switch Outdoor temperature sensorHigh gas pressure switch Low gas pressure switchWiring of the cascade Alarm contactsSystem supply sensor Boiler management system3Low Voltage Field Wiring Connections Condensate drain Condensate disposalStart-up Freeze protection when usedCheck/control water chemistry Fill and test water systemCheck thermostat circuits Check for gas leaksInspect/fill condensate system Inspect/check condensate lines and fittingsStart the boiler Final checks before starting the boilerIf boiler does not start correctly Check system and boilerFor Your Safety Read Before Operating Natural Gas Propane Set space heating operationSet domestic hot water DHW operation Configuration of the cascadeGeneral Operating informationProtection features Outdoor reset operation, if used Boiler temperature regulationCascade Sequence of the cascade DHW, Night Setback, and Ramp Delay operation with CascadeBLR Ignition Sequence of operationShutdown Knight XL control moduleInstaller Access modesUser To save parameters and exit programmingStandby ServiceSet Point Met PrepurgeControl will display the actual fan motor RPM SYS ***.*F10V in **.Vdc DelayOperation of the cascade Service technician Maintenance Maintenance and annual startupOwner maintenance Address reported problems MaintenanceClean condensate trap Check all piping for leaks Inspect boiler areaCheck water system Flue vent system and air pipingCheck expansion tank Check boiler relief valveCheck all boiler wiring Check ignition ground wiringCheck control settings Inspect ignition and flame sense electrodesCleaning boiler heat exchanger Check flame signalReview with owner High Voltage Diagrams2Ladder Diagram Page