Lochinvar 399 When using an existing vent system to install a new boiler, Products to avoid

Page 11

Installation & Operation Manual

1Determine boiler location (continued)

When using an existing vent system to install a new boiler:

￿WARNING Failure to follow all instructions can result in flue gas spillage and carbon monoxide

emissions, causing severe personal injury or death.

Check the following venting components before installing:

Material - For materials listed for use with this appliance, see Section 3 - General Venting, Table 3A. For stainless steel venting, an adapter of the same manufacturer (Table 3B) must be used at the flue collar connection.

Size - To ensure proper pipe size is in place, see Table 3D. Check to see that this size is used throughout the vent system.

Manufacturer - For a stainless steel application, you must use only the listed manufacturers and their type product listed in Table 3A for CAT IV positive pressure venting with flue producing condensate.

Supports - Non-combustible supports must be in place allowing a minimum 1/4" rise per foot. The supports should adequately prevent sagging and vertical slippage, by distributing the vent system weight. For additional information, consult the vent manufacturer’s instructions for installation.

Terminations - Carefully review Sections 3 through 5 to ensure requirements for the location of the vent and air terminations are met and orientation of these fit the appropriate image from the Sidewall or Vertical options listed in the General Venting Section. For stainless steel vent, only use terminations listed in Table 3B for the manufacturer of the installed vent.

Seal - With prior requirements met, the system should be tested to the procedure listed in parts (c) through (f) of the Removal of an Existing Boiler Section on page 12.

With stainless steel vent, seal and connect all pipe and components as specified by the vent manufacturer used; with PVC/CPVC vent, see the Installing Vent or Air Piping Section on page 17.

If any of these conditions are not met, the ￿ WARNING existing system must be updated or

replaced for that concern. Failure to follow all instructions can result in flue gas spillage and carbon monoxide emissions, causing severe personal injury or death.

Table 1A Corrosive Contaminants and Sources

Products to avoid:

Spray cans containing chloro/fluorocarbons

Permanent wave solutions

Chlorinated waxes/cleaners

Chlorine-based swimming pool chemicals

Calcium chloride used for thawing

Sodium chloride used for water softening

Refrigerant leaks

Paint or varnish removers

Hydrochloric acid/muriatic acid

Cements and glues

Antistatic fabric softeners used in clothes dryers

Chlorine-type bleaches, detergents, and cleaning solvents found in household laundry rooms

Adhesives used to fasten building products and other similar products

Areas likely to have contaminants

Dry cleaning/laundry areas and establishments

Swimming pools

Metal fabrication plants

Beauty shops

Refrigeration repair shops

Photo processing plants

Auto body shops

Plastic manufacturing plants

Furniture refinishing areas and establishments

New building construction

Remodeling areas

Garages with workshops

11

Image 11
Contents Save this manual for future reference Models 399Contents Please read before proceeding When servicing boilerKnight XL How it works Model Air pressure switch Pump relay boardModels 600 Knight XL Boiler =B=R Rating RatingsBefore locating the boiler, check Installation must comply withCloset and alcove installations Determine boiler locationTOP For closet installations, Cpvc orFlooring and foundation Residential garage installationProvide air openings to room Vent and air pipingAreas likely to have contaminants When using an existing vent system to install a new boilerProducts to avoid When removing a boiler from existing common vent system Gas conversions Prepare boilerRemove boiler from wood pallet ModelModels 600 Leveling the boilerGeneral venting Direct venting options Vertical Vent General venting Install vent and combustion air pipingRequirements for installation in Canada Installing vent or air pipingMake PVC/CPVC air intake/vent connectionsApproved Stainless Steel Vent Manufacturers Stainless steel vent Air inlet pipe materialsStainless steel air intake/vent connections FasNSeal Saf-T VentRemoving from existing vent Optional room airAir contamination Model Description Kit NumberDetermine location If using the alternate sidewall terminationSidewall direct venting Vent/air termination sidewall3AClearance to Gravity Air Inlets Bird Screen Typical Prepare wall penetrationsTermination and fittings Prepare wall penetrations Alternate Field Supplied OptionMultiple vent/air terminations Description and usage Sidewall termination installation9Concentric Vent Dimensional Drawing Models 399 Multiventing sidewall terminations 11Concentric Vent Sidewall AttachmentVent/air termination vertical Vertical direct venting2Vertical Terminations with Multiple Boilers Prepare roof penetrations4Concentric Vertical Termination Vertical termination installationMm see -9, Multiventing vertical terminationsHydronic piping Hydronic piping Circulator sizing Flow switch adjustmentNear boiler piping connections 399 500 600 700 800 Head FeetPressure 20F 25F 30F 35FNear boiler piping components 7Single Boiler Primary/Secondary Piping Number of Units Model Manifold Pipe Sizes in Inches mm Gas connections Connecting gas supply pipingPropane Gas Natural gasLength of Pipe in Straight Feet Nominal Natural Gas Pipe Capacity ChartCheck inlet gas supply Iron PipeGas Pressure Gas valve replacementLine voltage connections Field wiringInstallation must comply with Low gas pressure switch Outdoor temperature sensorAuxiliary device proving switch High gas pressure switchBoiler management system Alarm contactsWiring of the cascade System supply sensor3Low Voltage Field Wiring Connections Condensate drain Condensate disposalFill and test water system Freeze protection when usedStart-up Check/control water chemistryInspect/check condensate lines and fittings Check for gas leaksCheck thermostat circuits Inspect/fill condensate systemCheck system and boiler Final checks before starting the boilerStart the boiler If boiler does not start correctlyFor Your Safety Read Before Operating Natural Gas Propane Set space heating operationSet domestic hot water DHW operation Configuration of the cascadeGeneral Operating informationProtection features Cascade Boiler temperature regulationOutdoor reset operation, if used Sequence of the cascade DHW, Night Setback, and Ramp Delay operation with CascadeBLR Ignition Sequence of operationShutdown Knight XL control moduleTo save parameters and exit programming Access modesInstaller UserPrepurge ServiceStandby Set Point MetControl will display the actual fan motor RPM SYS ***.*F10V in **.Vdc DelayOperation of the cascade Owner maintenance Maintenance Maintenance and annual startupService technician Inspect boiler area MaintenanceAddress reported problems Clean condensate trap Check all piping for leaksCheck boiler relief valve Flue vent system and air pipingCheck water system Check expansion tankInspect ignition and flame sense electrodes Check ignition ground wiringCheck all boiler wiring Check control settingsModel Kit Part Component Number Description Check flame signalCleaning boiler heat exchanger Review with ownerHigh Voltage Diagrams2Ladder Diagram Page Page KBX-I-O Rev H
Related manuals
Manual 72 pages 15.81 Kb

399 specifications

Lochinvar 999 - 750, CF-CH(E)-i&s-08,399 is a cutting-edge boiler designed for commercial heating applications. With its robust construction and high efficiency, this model stands out in the crowded market of heating solutions.

One of the main features of the Lochinvar 999 - 750 is its exceptional thermal efficiency rating. The unit incorporates advanced condensing technology that allows it to recover heat from flue gases, which helps in achieving efficiency levels of up to 99%. This efficiency not only reduces energy consumption but also lowers operational costs, making it an excellent investment for businesses looking to minimize their carbon footprint.

The boiler is designed to provide a powerful output of 750 kW, ensuring it meets the heating demands of larger buildings or commercial spaces. Its capacity makes it suitable for a range of applications including schools, hospitals, and industrial facilities. Moreover, the unit features a built-in cascading system that enables multiple boilers to be connected, enhancing system reliability and flexibility.

In terms of technology, the Lochinvar 999 - 750 is equipped with a user-friendly touchscreen interface. This innovative control system allows operators to monitor and adjust settings with ease, providing real-time performance data and alerts for maintenance needs. The intelligent controls optimize operation to match the heating load, further enhancing energy efficiency.

Safety is a top priority with this model. It is built with multiple safety features such as automatic shut-off valves, pressure relief valves, and flame monitoring systems, ensuring safe operation under various conditions. The unit also adheres to stringent industry standards and regulations, making it a reliable choice for commercial applications.

Furthermore, the Lochinvar 999 - 750 is designed with serviceability in mind. Its compact footprint and accessible components simplify maintenance, reducing downtime and associated costs. The unit also supports a variety of fuel sources, including natural gas, propane, and biodiesel, providing flexibility to meet different facility requirements.

In summary, the Lochinvar 999 - 750, CF-CH(E)-i&s-08,399 represents a blend of efficiency, reliability, and safety in commercial heating. Its advanced technologies and thoughtful design make it a powerful solution for various heating needs, making it an ideal choice for businesses aiming for excellence in energy management and operational efficiency.