Installation & Operation Manual

6Hydronic piping

System water piping methods

The Knight XL is designed to function in a closed loop pressurized system not less than 12 psi (83 kPa). A temperature and pressure gauge is included to monitor system pressure and outlet temperature and should be located on the boiler outlet.

It is important to note that the boiler has a minimal amount of pressure drop which must be figured in when sizing the circulators. Each boiler installation must have an air elimination device, which will remove air from the system. Install the boiler so the gas ignition system components are protected from water (dripping, spraying, etc.) during appliance operation or basic service of circulator replacement, valves, and others.

Observe a minimum of 1 inch (25 mm) clearance around all un-insulated hot water pipes when openings around the pipes are not protected by non-combustible materials.

Low water cutoff device

On a boiler installed above radiation level, some states and local codes require a low water cutoff device at the time of installation.

Chilled water system

If the boiler supplies hot water to heating coils in air handler units, flow control valves or other devices must be installed to prevent gravity circulation of heater water in the coils during the cooling cycle. A chilled water medium must be piped in parallel with the heater.

Freeze protection

Freeze protection for new or existing systems must use glycol that is specially formulated for this purpose. This includes inhibitors, which prevent the glycol from attacking the metallic system components. Make certain to check that the system fluid is correct for the glycol concentration and inhibitor level. The system should be tested at least once a year and as recommended by the producer of the glycol solution. Allowance should be made for the expansion of the glycol solution in the system piping.

￿WARNING Use only inhibited propylene glycol solutions, which are specifically

formulated for hydronic systems. Ethylene glycol is toxic and can attack gaskets and seals used in hydronic systems.

34

General piping information

Basic steps are listed below along with illustrations on the following pages (FIG.’s 6-7 and 6-8), which will guide you through the installation of the Knight XL (reference FIG.’s 6-4A and 6-4B).

1.Connect the system return marked “Inlet”, make sure to install with pipe sealant compound.

2.Connect the system supply marked “Outlet”, make sure to install with pipe sealant compound.

3.Install purge and balance valve or shutoff valve and drain on system return to purge air out of each zone.

4.Install a backflow preventer on the cold feed make-up water line.

5.Install a pressure reducing valve on the cold feed make-up water line, (15 psi (103 kPa) nominal). Check temperature and pressure gauge (shipped separately), which should read a minimum pressure of 12 psi (83 kPa).

6.Install a circulator as shown on the piping diagrams in this section. Make sure the circulator is properly sized for the system and friction loss.

7.Install an expansion tank on the system supply. Consult the tank manufacturer’s instruction for specific information relating to tank installation. Size the expansion tank for the required system volume and capacity.

8.Install an air elimination device on the system supply.

9.Install a drain valve at the lowest point of the system. Note: The boiler cannot be drained completely of water without purging the unit with an air pressure of 15 psi (103 kPa).

10.This appliance is supplied with a relief valve sized in accordance with ASME Boiler and Pressure Vessel Code, Section IV (“Heating Boilers”). Pipe the discharge of the safety relief valve to prevent injury in the event of pressure relief. Pipe the discharge to a drain. Provide piping that is the same size as the safety relief valve outlet. Never block the outlet of the safety relief valve.

￿ WARNING The relief valve, tee and any other necessary fittings are shipped in the install kit with the

boiler and are to be field installed (FIG.’s 6-1 and 6-2).

11.On any pre-existing system, it is good practice to install a field supplied strainer to prevent damage to the heat exchanger.

See the piping illustrations included in this section, FIG.’s 6-7 and 6-8 for suggested guidelines in piping the Knight XL.

NOTICE

Please note that these illustrations are meant

to show system piping concept only, the

 

 

 

installer is responsible for all equipment and

 

detailing required by local codes.

Image 34
Contents Models 399 Save this manual for future referenceContents When servicing boiler Please read before proceedingKnight XL How it works Air pressure switch Pump relay board ModelModels 600 Ratings Knight XL Boiler =B=R RatingDetermine boiler location Installation must comply withCloset and alcove installations Before locating the boiler, checkFor closet installations, Cpvc or TOPVent and air piping Residential garage installationProvide air openings to room Flooring and foundationProducts to avoid When using an existing vent system to install a new boilerAreas likely to have contaminants When removing a boiler from existing common vent system Model Prepare boilerRemove boiler from wood pallet Gas conversionsLeveling the boiler Models 600General venting Direct venting options Vertical Vent Installing vent or air piping Install vent and combustion air pipingRequirements for installation in Canada General ventingApproved Stainless Steel Vent Manufacturers PVC/CPVC air intake/vent connectionsMake Air inlet pipe materials Stainless steel ventFasNSeal Saf-T Vent Stainless steel air intake/vent connectionsOptional room air Removing from existing ventModel Description Kit Number Air contaminationVent/air termination sidewall If using the alternate sidewall terminationSidewall direct venting Determine location3AClearance to Gravity Air Inlets Prepare wall penetrations Bird Screen TypicalMultiple vent/air terminations Prepare wall penetrations Alternate Field Supplied OptionTermination and fittings Sidewall termination installation Description and usage9Concentric Vent Dimensional Drawing Models 399 11Concentric Vent Sidewall Attachment Multiventing sidewall terminationsVertical direct venting Vent/air termination verticalPrepare roof penetrations 2Vertical Terminations with Multiple BoilersVertical termination installation 4Concentric Vertical TerminationMultiventing vertical terminations Mm see -9,Hydronic piping Hydronic piping Near boiler piping connections Flow switch adjustmentCirculator sizing 20F 25F 30F 35F Head FeetPressure 399 500 600 700 800Near boiler piping components 7Single Boiler Primary/Secondary Piping Number of Units Model Manifold Pipe Sizes in Inches mm Connecting gas supply piping Gas connectionsNatural gas Propane GasIron Pipe Nominal Natural Gas Pipe Capacity ChartCheck inlet gas supply Length of Pipe in Straight FeetGas valve replacement Gas PressureInstallation must comply with Field wiringLine voltage connections High gas pressure switch Outdoor temperature sensorAuxiliary device proving switch Low gas pressure switchSystem supply sensor Alarm contactsWiring of the cascade Boiler management system3Low Voltage Field Wiring Connections Condensate disposal Condensate drainCheck/control water chemistry Freeze protection when usedStart-up Fill and test water systemInspect/fill condensate system Check for gas leaksCheck thermostat circuits Inspect/check condensate lines and fittingsIf boiler does not start correctly Final checks before starting the boilerStart the boiler Check system and boilerFor Your Safety Read Before Operating Set space heating operation Natural Gas PropaneConfiguration of the cascade Set domestic hot water DHW operationOperating information GeneralProtection features Outdoor reset operation, if used Boiler temperature regulationCascade DHW, Night Setback, and Ramp Delay operation with Cascade Sequence of the cascadeSequence of operation BLR IgnitionKnight XL control module ShutdownUser Access modesInstaller To save parameters and exit programmingSet Point Met ServiceStandby PrepurgeSYS ***.*F Control will display the actual fan motor RPMDelay 10V in **.VdcOperation of the cascade Service technician Maintenance Maintenance and annual startupOwner maintenance Clean condensate trap Check all piping for leaks MaintenanceAddress reported problems Inspect boiler areaCheck expansion tank Flue vent system and air pipingCheck water system Check boiler relief valveCheck control settings Check ignition ground wiringCheck all boiler wiring Inspect ignition and flame sense electrodesReview with owner Check flame signalCleaning boiler heat exchanger Model Kit Part Component Number DescriptionDiagrams High Voltage2Ladder Diagram Page Page KBX-I-O Rev H
Related manuals
Manual 72 pages 15.81 Kb

399 specifications

Lochinvar 999 - 750, CF-CH(E)-i&s-08,399 is a cutting-edge boiler designed for commercial heating applications. With its robust construction and high efficiency, this model stands out in the crowded market of heating solutions.

One of the main features of the Lochinvar 999 - 750 is its exceptional thermal efficiency rating. The unit incorporates advanced condensing technology that allows it to recover heat from flue gases, which helps in achieving efficiency levels of up to 99%. This efficiency not only reduces energy consumption but also lowers operational costs, making it an excellent investment for businesses looking to minimize their carbon footprint.

The boiler is designed to provide a powerful output of 750 kW, ensuring it meets the heating demands of larger buildings or commercial spaces. Its capacity makes it suitable for a range of applications including schools, hospitals, and industrial facilities. Moreover, the unit features a built-in cascading system that enables multiple boilers to be connected, enhancing system reliability and flexibility.

In terms of technology, the Lochinvar 999 - 750 is equipped with a user-friendly touchscreen interface. This innovative control system allows operators to monitor and adjust settings with ease, providing real-time performance data and alerts for maintenance needs. The intelligent controls optimize operation to match the heating load, further enhancing energy efficiency.

Safety is a top priority with this model. It is built with multiple safety features such as automatic shut-off valves, pressure relief valves, and flame monitoring systems, ensuring safe operation under various conditions. The unit also adheres to stringent industry standards and regulations, making it a reliable choice for commercial applications.

Furthermore, the Lochinvar 999 - 750 is designed with serviceability in mind. Its compact footprint and accessible components simplify maintenance, reducing downtime and associated costs. The unit also supports a variety of fuel sources, including natural gas, propane, and biodiesel, providing flexibility to meet different facility requirements.

In summary, the Lochinvar 999 - 750, CF-CH(E)-i&s-08,399 represents a blend of efficiency, reliability, and safety in commercial heating. Its advanced technologies and thoughtful design make it a powerful solution for various heating needs, making it an ideal choice for businesses aiming for excellence in energy management and operational efficiency.