Lochinvar 399 operation manual Air inlet pipe materials, Stainless steel vent

Page 19

Installation & Operation Manual

3General venting (continued)

Air inlet pipe materials:

The air inlet pipe(s) must be sealed. Choose acceptable combustion air inlet pipe materials from the following list:

PVC, CPVC or ABS

Dryer Vent or Sealed Flexible Duct (not recommended for rooftop air inlet)

Galvanized steel vent pipe with joints and seams sealed as specified in this section.

Type “B” double-wall vent with joints and seams sealed as specified in this section.

AL29-4C, stainless steel material to be sealed to specification of its manufacturer.

*Plastic pipe may require an adapter (not provided) to transition between the air inlet connection on the appliance

When a sidewall or vertical rooftop combustion air supply system is disconnected for any reason, the air inlet pipe must be resealed to ensure that combustion air will be free of contaminants and supplied in proper volume.

￿Failure to properly seal all joints and

DANGER

seams as required in the air inlet piping may result in flue gas recirculation, spillage of flue products and carbon monoxide emissions causing severe personal injury or death.

Stainless steel vent

This product has been approved for use with stainless steel using the manufacturers listed in Table 3A.

and the plastic air inlet pipe.

￿WARNING

Use only the materials, vent systems, and terminations listed in Table 3B. DO NOT

￿WARNING

Using vent or air intake materials other than those specified, failure to properly seal all seams and joints or failure to follow vent pipe manufacturer’s instructions can result in personal injury, death or property damage. Mixing of venting materials will void the warranty and certification of the appliance.

mix vent systems of different types or manufacturers, unless listed in this manual. Failure to comply could result in severe personal injury, death, or substantial property damage.

NOTICE

Installations must comply with applicable

national, state, and local codes. Stainless

 

 

steel vent systems must be listed as a

NOTICE

The use of double-wall vent or insulated material for the combustion air inlet pipe is recommended in cold climates to prevent the condensation of airborne moisture in the incoming combustion air.

 

UL-1738 approved system for the United

 

States and a ULC-S636 approved system

 

for Canada.

 

Installation of a stainless steel vent system

NOTICE

should adhere to the stainless steel vent

 

Sealing of Type “B” double-wall vent material or galvanized vent pipe material used for air inlet piping on a sidewall or vertical rooftop Combustion Air Supply System:

a.Seal all joints and seams of the air inlet pipe using either Aluminum Foil Duct Tape meeting UL Standard 723 or 181A-P or a high quality UL Listed silicone sealant such as those manufactured by Dow Corning or General Electric.

b.Do not install seams of vent pipe on the bottom of horizontal runs.

c.Secure all joints with a minimum of three sheet metal screws or pop rivets. Apply Aluminum Foil Duct Tape or silicone sealant to all screws or rivets installed in the vent pipe.

d.Ensure that the air inlet pipes are properly supported.

The PVC, CPVC, or ABS air inlet pipe should be cleaned and sealed with the pipe manufacturer’s recommended solvents and standard commercial pipe cement for the material used. The PVC, CPVC, ABS, Dryer Vent or Flex Duct air inlet pipe should use a silicone sealant to ensure a proper seal at the appliance connection and the air inlet cap connection. Dryer vent or flex duct should use a screw type clamp to seal the vent to the appliance air inlet and the air inlet cap. Proper sealing of the air inlet pipe ensures that combustion air will be free of contaminants and supplied in proper volume.

 

manufacturer’s installation instructions

 

supplied with the vent system.

 

The installer must use a specific vent

NOTICE

starter adapter at the flue collar

 

 

connection, supplied by the vent

 

manufacturer to adapt to its vent system.

 

See Table 3B for approved vent adapters.

 

Discard CPVC starter piece.

19

Image 19
Contents Save this manual for future reference Models 399Contents Please read before proceeding When servicing boilerKnight XL How it works Model Air pressure switch Pump relay boardModels 600 Knight XL Boiler =B=R Rating RatingsBefore locating the boiler, check Installation must comply withCloset and alcove installations Determine boiler locationTOP For closet installations, Cpvc orFlooring and foundation Residential garage installationProvide air openings to room Vent and air pipingProducts to avoid When using an existing vent system to install a new boilerAreas likely to have contaminants When removing a boiler from existing common vent system Gas conversions Prepare boilerRemove boiler from wood pallet ModelModels 600 Leveling the boilerGeneral venting Direct venting options Vertical Vent General venting Install vent and combustion air pipingRequirements for installation in Canada Installing vent or air pipingApproved Stainless Steel Vent Manufacturers PVC/CPVC air intake/vent connectionsMake Stainless steel vent Air inlet pipe materialsStainless steel air intake/vent connections FasNSeal Saf-T VentRemoving from existing vent Optional room airAir contamination Model Description Kit NumberDetermine location If using the alternate sidewall terminationSidewall direct venting Vent/air termination sidewall3AClearance to Gravity Air Inlets Bird Screen Typical Prepare wall penetrationsMultiple vent/air terminations Prepare wall penetrations Alternate Field Supplied OptionTermination and fittings Description and usage Sidewall termination installation9Concentric Vent Dimensional Drawing Models 399 Multiventing sidewall terminations 11Concentric Vent Sidewall AttachmentVent/air termination vertical Vertical direct venting2Vertical Terminations with Multiple Boilers Prepare roof penetrations4Concentric Vertical Termination Vertical termination installationMm see -9, Multiventing vertical terminationsHydronic piping Hydronic piping Near boiler piping connections Flow switch adjustmentCirculator sizing 399 500 600 700 800 Head FeetPressure 20F 25F 30F 35FNear boiler piping components 7Single Boiler Primary/Secondary Piping Number of Units Model Manifold Pipe Sizes in Inches mm Gas connections Connecting gas supply pipingPropane Gas Natural gasLength of Pipe in Straight Feet Nominal Natural Gas Pipe Capacity ChartCheck inlet gas supply Iron PipeGas Pressure Gas valve replacementInstallation must comply with Field wiringLine voltage connections Low gas pressure switch Outdoor temperature sensorAuxiliary device proving switch High gas pressure switchBoiler management system Alarm contactsWiring of the cascade System supply sensor3Low Voltage Field Wiring Connections Condensate drain Condensate disposalFill and test water system Freeze protection when usedStart-up Check/control water chemistryInspect/check condensate lines and fittings Check for gas leaksCheck thermostat circuits Inspect/fill condensate systemCheck system and boiler Final checks before starting the boilerStart the boiler If boiler does not start correctlyFor Your Safety Read Before Operating Natural Gas Propane Set space heating operationSet domestic hot water DHW operation Configuration of the cascadeGeneral Operating informationProtection features Outdoor reset operation, if used Boiler temperature regulationCascade Sequence of the cascade DHW, Night Setback, and Ramp Delay operation with CascadeBLR Ignition Sequence of operationShutdown Knight XL control moduleTo save parameters and exit programming Access modesInstaller UserPrepurge ServiceStandby Set Point MetControl will display the actual fan motor RPM SYS ***.*F10V in **.Vdc DelayOperation of the cascade Service technician Maintenance Maintenance and annual startupOwner maintenance Inspect boiler area MaintenanceAddress reported problems Clean condensate trap Check all piping for leaksCheck boiler relief valve Flue vent system and air pipingCheck water system Check expansion tankInspect ignition and flame sense electrodes Check ignition ground wiringCheck all boiler wiring Check control settingsModel Kit Part Component Number Description Check flame signalCleaning boiler heat exchanger Review with ownerHigh Voltage Diagrams2Ladder Diagram Page Page KBX-I-O Rev H
Related manuals
Manual 72 pages 15.81 Kb

399 specifications

Lochinvar 999 - 750, CF-CH(E)-i&s-08,399 is a cutting-edge boiler designed for commercial heating applications. With its robust construction and high efficiency, this model stands out in the crowded market of heating solutions.

One of the main features of the Lochinvar 999 - 750 is its exceptional thermal efficiency rating. The unit incorporates advanced condensing technology that allows it to recover heat from flue gases, which helps in achieving efficiency levels of up to 99%. This efficiency not only reduces energy consumption but also lowers operational costs, making it an excellent investment for businesses looking to minimize their carbon footprint.

The boiler is designed to provide a powerful output of 750 kW, ensuring it meets the heating demands of larger buildings or commercial spaces. Its capacity makes it suitable for a range of applications including schools, hospitals, and industrial facilities. Moreover, the unit features a built-in cascading system that enables multiple boilers to be connected, enhancing system reliability and flexibility.

In terms of technology, the Lochinvar 999 - 750 is equipped with a user-friendly touchscreen interface. This innovative control system allows operators to monitor and adjust settings with ease, providing real-time performance data and alerts for maintenance needs. The intelligent controls optimize operation to match the heating load, further enhancing energy efficiency.

Safety is a top priority with this model. It is built with multiple safety features such as automatic shut-off valves, pressure relief valves, and flame monitoring systems, ensuring safe operation under various conditions. The unit also adheres to stringent industry standards and regulations, making it a reliable choice for commercial applications.

Furthermore, the Lochinvar 999 - 750 is designed with serviceability in mind. Its compact footprint and accessible components simplify maintenance, reducing downtime and associated costs. The unit also supports a variety of fuel sources, including natural gas, propane, and biodiesel, providing flexibility to meet different facility requirements.

In summary, the Lochinvar 999 - 750, CF-CH(E)-i&s-08,399 represents a blend of efficiency, reliability, and safety in commercial heating. Its advanced technologies and thoughtful design make it a powerful solution for various heating needs, making it an ideal choice for businesses aiming for excellence in energy management and operational efficiency.