PRE - INSTALLATION

 

CABINET MOUNTED BALANCED

 

HORIZONTAL FLUE OPTIONS

REAR FLUE OUTLET

• The horizontal flue is fitted to the rear or

either side of the cabinet.

 

A + C

 

 

IMPORTANT:

 

It is strongly recommended that the flue

 

terminal faces away from walls to

 

minimise the occurance of wetting.

Plan view

FRONT

A - External horizontal flue kit

Part No. 7 716 190 052

LEFT HAND FLUE OUTLET

A + B + C

B - 90° inline elbow 80/125mm

Part No. 7 716 190 034

Plan view

C - Terminal guard

Part No. 7 716 190 050

FRONT

RIGHT HAND FLUE

OUTLET

A + B + C

Plan view

FRONT

17

BALANCED FLUE OPTIONS

INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32 8 716 113 389b (09/07)

Image 18
Contents Greenstar Heatslave External 12/18, 18/25, 25/32kW Installation & Servicing Instructions Installation & Servicing InstructionsContents Safety Precautions Installation Regulations Safety PrecautionsInstallation Regulations OIL SMELLS, Leaks or Fumes from the ApplianceGeneral Information General InformationStandard Package Description Technical DataTechnical Data BSPLayout & Components Layout & ComponentsCleaning Primary Systems Cleaning Primary SystemsMains Water Expansion Vessel Mains SuppliesMains Supplies Electric SupplyG J OIL SupplyOIL Supply HeadWater Systems & Pipework Water Systems & PipeworkFilling Primary Sealed Systems SHOWERS/BIDETSDomestic HOT Water Condensate Pipework Condensate Pressure Relief PipeworkCondensate Pressure Relief Pipework Pressure Relief PipeworkClearances Boiler Location ClearancesBoiler Location Front Cabinet Mounted LOW Level Flue Terminal Positions Cabinet Mounted LOW Level Flue Terminal Positions Terminal Position High Level Flue Terminal High Level Flue TerminalPositions PositionsFlue Options Balanced External Oilfit Flue OptionsBalanced External Oilfit AC DCabinet Mounted Balanced Horizontal Flue OptionsBalanced Flue Options Lifting and Carrying Precautions Unpacking the BoilerUnpacking the Boiler Safety Pipework & Flue PositionsPipework & Flue Positions Boiler Installation Boiler InstallationFlue Installation Flue InstallationInstallation Notes Hor Plan sectional view Combustion ChamberCombustion Chamber Hook the retainer J over the end two bafflesWater Connections Pipework ConnectionsPipework Connections OIL Supply ConnectionsCondensate Connection Pressure Relief ConnectionOIL Burner OIL Burner & PumpOIL Burner & Pump OIL PumpRefitting Components Refitting ComponentsPlug burner lead E into control box F Board MainsProgrammer External Electrics ElectricsRed Br BrownBlue Green/Yellow WhitePRE-COMMISSIONING Checks Appliance PRE-COMMISSIONINGChecks Appliance Filling the System Filling the SystemStarting the Appliance Starting the ApplianceSafely dispose of the container/discharge Bleed & pressure gauge port Pressure adjustment Vacuum gauge port 25/32Boiler lockout indicator on Holder with oilBurner should be OFF and the circulating pump on Central heating Open all radiator valves Set the room thermostat to minimumWater Treatment Water TreatmentPump and all radiators Finishing Commissioning Finishing CommissioningAppliance Routine servicing Inspection and ServiceInspection and Service Loosen clip D to detach air ductThoroughly clean any deposits Clean the Burner3.0mm Clean both sides of the fan impeller Any debris and clean if necessaryFront 55 80EH 50 80EH11.5 18.6 12.0 22.2Auto reset High Limit thermostat Part Number 8 716 107 640 Short Parts List 12/18Short Parts List 12/18 Burner SterlingShort Parts List 18/25 Short Parts List 18/25Manifold access cover seal Short Parts List 25/32 Short Parts List 25/32Fault Finding Fault FindingNoisy operation Pump noise from air in pump or Problem Cause RemedyFaulty Boiler Operation OIL SmellsNeutral N and the pin, wire or Base of the control box before replacing any componentsMeasure all 230V tests between 535 SE/LD RDB Fault Finding Control BOX Logic forSchematic ElectricalOIL Boiler Combustion Record Service 1 Date General checks Excellence Comes AS Standard