Bosch Appliances 12/18, 18/25, 25/32kW Balanced External Oilfit Flue Options, Ac D

Page 17

L = 2000mm

L

F

B

*

125mmØ x2

 

**

High level horizontal terminal (rear outlet)

L = 7000mm

L

BALANCED EXTERNAL OILFIT

FLUE OPTIONS

IMPORTANT: The weather seal (supplied) must be fitted to every flue joint to give the required level of weather protection.

The diagrams (opposite) show the components used and the maximum flue length (L) for each flue configuration.

In all cases L is measured from the outside of the boiler casing.

To achieve the maximum flue length (L), a flue section will have to be reduced in length.

Only the straight flue extensions can be reduced in length by cutting.

IMPORTANT: All horizontal sections must rise away from the boiler by 52mm per metre (3°) to allow the condensate to drain back to the boiler.

AC D

PRE - INSTALLATION

E

B

F E

B

125mmØ x5

**

Vertical terminal (rear outlet)

L = 6000mm

L

 

ED D

B

125mmØ x4

**

Vertical terminal (rear outlet)

L = 6000mm

L

E

C

B

125mmØ x4

**

Vertical terminal (side outlet)

A - Horizontal terminal

B - Straight flue extension C - Flue bend 90°

D - Flue bend 45°

E - Vertical Terminal Kit (incl. 90° elbow) F - Horizontal terminal kit (incl. 90° elbow)

Calculating the flue length:

Measure the total flue length required, noting that the maximum straight flue length including the terminal is:

Horizontal 80/125mmØ: 4000mm.

Vertical 80/125mmØ / 100/150mmØ (25/32 only): 7000mm.

Then reduce the total straight flue length for each extra flue bend (excluding the vertical flue kit 90° elbow) by:

1000mm for 90°

500mm for 45°

Flue Extension lengths:

Horizontal & Vertical: 1000mm overall length.

Effective length when engaged into sockets within the flue run is 950mm.

Flue Terminal lengths:

Horizontal 80/125mmØ: 720mm

Vertical 80/125mmØ: 1080mm + cage

*Rear exit only.

**Horizontal flue runs should be kept as short as possible.

INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32

BALANCED EXTERNAL OILFIT

8 716 113 389b (09/07)

16

FLUE OPTIONS

Image 17
Contents Greenstar Heatslave External 12/18, 18/25, 25/32kW Installation & Servicing Instructions Installation & Servicing InstructionsContents Installation Regulations Safety PrecautionsSafety Precautions Installation Regulations OIL SMELLS, Leaks or Fumes from the ApplianceStandard Package General InformationGeneral Information Technical Data Technical DataDescription BSPLayout & Components Layout & ComponentsCleaning Primary Systems Cleaning Primary SystemsMains Supplies Mains SuppliesMains Water Expansion Vessel Electric SupplyOIL Supply OIL SupplyG J HeadWater Systems & Pipework Water Systems & PipeworkDomestic HOT Water Filling Primary Sealed SystemsSHOWERS/BIDETS Condensate Pressure Relief Pipework Condensate Pressure Relief PipeworkCondensate Pipework Pressure Relief Pipework Boiler Location Boiler Location Clearances Clearances FrontTerminal Position Cabinet Mounted LOW Level Flue Terminal PositionsCabinet Mounted LOW Level Flue Terminal Positions Positions High Level Flue TerminalHigh Level Flue Terminal PositionsBalanced External Oilfit Balanced External Oilfit Flue OptionsFlue Options AC DBalanced Flue Options Cabinet Mounted BalancedHorizontal Flue Options Unpacking the Boiler Lifting and Carrying PrecautionsUnpacking the Boiler Pipework & Flue Positions SafetyPipework & Flue Positions Boiler Installation Boiler InstallationInstallation Notes Flue InstallationFlue Installation Combustion Chamber Combustion ChamberHor Plan sectional view Hook the retainer J over the end two bafflesPipework Connections Pipework ConnectionsWater Connections OIL Supply ConnectionsPressure Relief Connection Condensate ConnectionOIL Burner & Pump OIL Burner & PumpOIL Burner OIL PumpPlug burner lead E into control box F Refitting ComponentsRefitting Components Programmer External Electrics MainsBoard ElectricsBlue Green/Yellow Br BrownRed WhiteChecks Appliance PRE-COMMISSIONING Checks AppliancePRE-COMMISSIONING Filling the System Filling the SystemSafely dispose of the container/discharge Starting the ApplianceStarting the Appliance Boiler lockout indicator on Pressure adjustment Vacuum gauge port 25/32Bleed & pressure gauge port Holder with oilBurner should be OFF and the circulating pump on Set the room thermostat to minimum Central heating Open all radiator valvesPump and all radiators Water TreatmentWater Treatment Appliance Finishing CommissioningFinishing Commissioning Inspection and Service Inspection and ServiceRoutine servicing Loosen clip D to detach air duct3.0mm Clean both sides of the fan impeller Clean the BurnerThoroughly clean any deposits Any debris and clean if necessaryFront 11.5 18.6 50 80EH55 80EH 12.0 22.2Short Parts List 12/18 Short Parts List 12/18Auto reset High Limit thermostat Part Number 8 716 107 640 Burner SterlingManifold access cover seal Short Parts List 18/25Short Parts List 18/25 Short Parts List 25/32 Short Parts List 25/32Fault Finding Fault FindingFaulty Boiler Operation Problem Cause RemedyNoisy operation Pump noise from air in pump or OIL SmellsMeasure all 230V tests between Neutral N and the pin, wire orBase of the control box before replacing any components Control BOX Logic for 535 SE/LD RDB Fault FindingElectrical SchematicOIL Boiler Combustion Record Service 1 Date Excellence Comes AS Standard General checks