Bosch Appliances 25/32kW, 18/25, 12/18 General checks, Excellence Comes AS Standard

Page 52

In the unlikely event the boiler does not give complete satisfaction, before calling for a service engineer, the installer should check the following:-

General checks

1.Is the mode switch in boiler mode (indicator on)?

2.Is there 230V across the boiler live and neutral terminals?

3.Is the polarity correct? (230V across live and earth, 0V across neutral and earth)

4.Is the air bled from the primary system?

5.Is the air bled from the oil supply?

6.Is the flue sized and routed correctly?

Boiler runs straight to lockout

1.Has the oil line been purged of air?

2.Where an air eliminator is used in conjunction with a top feed oil tank the non-return valve, (if fitted), should be removed from the oil dip pipe.

Boiler locks out at the start of a demand (Heating off overnight for example)

1.If an air eliminator is being used, check that there are no leaks that allow air to be pulled into the oil supply.

2.If a two pipe oil supply is a being used, has a non-return valve been fitted to the inlet pipe? Refer to the instructions for guidelines.

No domestic hot water (external programmer)

1.Is the mains water in connected to the 15mm isolation valve?

2.Is there a domestic hot water demand from the programmer and has the tank reached temperature?

3.Is there 230V on pin 2 of terminal block X4?

4.Remove the external wiring from terminal block X4 and fit a link across 1 and 2, if the domestic hot water now operates there is a problem with the external programmer and/or its wiring.

No central heating (external programmer)

1.Are both programmer and room thermostat on demand for central heating?

2.Is the room thermostat wired correctly?

3.Refit the link across pins LS and LR on terminal X2, if the central heating now operates correctly the room thermostat and/or its wiring are faulty.

4.Is there 230V on pin 1 of terminal block X4?

5.Remove the external wiring to terminal block X4 and fit a link across pins 1 and 3 on terminal X4, if the central heating now operates correctly the room programmer and/or its wiring are faulty.

UNDER NO CIRCUMSTANCES MUST AN APPLIANCE BE LEFT

TO OPERATE WITH ANY CONTROL LINKED OUT OR OVER RIDDEN.

EXCELLENCE COMES AS STANDARD

Worcester, Bosch Group

Cotswold Way, Warndon, Worcester WR4 9SW.

Tel. 01905 754624 Fax. 01905 754619

Worcester, Bosch Group is a trading name of BBT

Thermotechnology UK Ltd.

www.worcester-bosch.co.uk

CONTACT INFORMATION

WORCESTER, BOSCH GROUP:

TECHNICAL:

08705 266241

SERVICE:

08457 256206

SPARES:

01905 752571

LITERATURE:

01905 752556

TRAINING:

01905 752526

SALES:

01905 752640

WEBSITE: www.worcester-bosch.co.uk

WATER TREATMENT:

FERNOX

01799 550811

www.fernox.com

 

SENTINEL

0151 420 9595

www.betzdearborn.com/sentinel

FLUE TERMINAL GUARD:

PART No. 7 716 190 050

8 716 113 389b (09/07)

Image 52
Contents Greenstar Heatslave External 12/18, 18/25, 25/32kW Installation & Servicing Instructions Installation & Servicing InstructionsContents Safety Precautions Installation RegulationsSafety Precautions Installation Regulations OIL SMELLS, Leaks or Fumes from the ApplianceGeneral Information General InformationStandard Package Technical Data Technical DataDescription BSPLayout & Components Layout & ComponentsCleaning Primary Systems Cleaning Primary SystemsMains Supplies Mains SuppliesMains Water Expansion Vessel Electric SupplyOIL Supply OIL SupplyG J HeadWater Systems & Pipework Water Systems & PipeworkSHOWERS/BIDETS Filling Primary Sealed SystemsDomestic HOT Water Condensate Pressure Relief Pipework Condensate Pressure Relief PipeworkCondensate Pipework Pressure Relief PipeworkBoiler Location Clearances Boiler LocationClearances FrontCabinet Mounted LOW Level Flue Terminal Positions Cabinet Mounted LOW Level Flue Terminal PositionsTerminal Position High Level Flue Terminal PositionsHigh Level Flue Terminal PositionsBalanced External Oilfit Flue Options Balanced External OilfitFlue Options AC DHorizontal Flue Options Cabinet Mounted BalancedBalanced Flue Options Unpacking the Boiler Lifting and Carrying PrecautionsUnpacking the Boiler Pipework & Flue Positions SafetyPipework & Flue Positions Boiler Installation Boiler InstallationFlue Installation Flue InstallationInstallation Notes Combustion Chamber Combustion ChamberHor Plan sectional view Hook the retainer J over the end two bafflesPipework Connections Pipework ConnectionsWater Connections OIL Supply ConnectionsCondensate Connection Pressure Relief ConnectionOIL Burner & Pump OIL Burner & PumpOIL Burner OIL PumpRefitting Components Refitting ComponentsPlug burner lead E into control box F Mains Programmer External ElectricsBoard ElectricsBr Brown Blue Green/YellowRed WhitePRE-COMMISSIONING PRE-COMMISSIONING Checks ApplianceChecks Appliance Filling the System Filling the SystemStarting the Appliance Starting the ApplianceSafely dispose of the container/discharge Pressure adjustment Vacuum gauge port 25/32 Boiler lockout indicator onBleed & pressure gauge port Holder with oilBurner should be OFF and the circulating pump on Central heating Open all radiator valves Set the room thermostat to minimumWater Treatment Water TreatmentPump and all radiators Finishing Commissioning Finishing CommissioningAppliance Inspection and Service Inspection and ServiceRoutine servicing Loosen clip D to detach air ductClean the Burner 3.0mm Clean both sides of the fan impellerThoroughly clean any deposits Any debris and clean if necessaryFront 50 80EH 11.5 18.655 80EH 12.0 22.2Short Parts List 12/18 Short Parts List 12/18Auto reset High Limit thermostat Part Number 8 716 107 640 Burner SterlingShort Parts List 18/25 Short Parts List 18/25Manifold access cover seal Short Parts List 25/32 Short Parts List 25/32Fault Finding Fault FindingProblem Cause Remedy Faulty Boiler OperationNoisy operation Pump noise from air in pump or OIL SmellsBase of the control box before replacing any components Neutral N and the pin, wire orMeasure all 230V tests between 535 SE/LD RDB Fault Finding Control BOX Logic for Schematic ElectricalOIL Boiler Combustion Record Service 1 Date General checks Excellence Comes AS Standard