contents
SAFE INSTALLATION, USE AND SERVICE | 2 | Horizontal Installtion Requirements | 17 | |
GENERAL SAFETY | 3 | Direct Vent Installation Requirements | 19 | |
dimension and capacity data | 4 | INSTALLATION REQUIREMENTS FOR THE COMMONWEALTH OF | ||
capacity AND FLOW data | 5 | MASSACHUSETTS | 19 | |
contents | 6 | system installation | 22 | |
introduction | 6 | General | 22 | |
Grounding | Instructions | 7 | Hot Water Heating (Hydronic) Equipment | 22 |
Inlet Water | Considerations | 7 | Internal Contaminants | 23 |
Correct Gas | 7 | Hot Water Supply Boiler System - General Water Line Connections... | 23 | |
Precautions | 7 | Hard Water Conditions | 23 | |
Liquefied Petroleum Gas Models | 7 | Thermal Expansion (Closed System) | 23 | |
High Altitude Installations | 7 | Remote Probe Installation Procedure | 23 | |
Field Installed Components | 7 | Gas Connections | 24 | |
Control Components | 8 | Gas Supply Line Sizing | 24 | |
The Control System | 8 | Wiring | 28 | |
Hot Surface Igniter | 8 | Suggested Pipe Sizing Tables | 29 | |
Pressure Switches | 8 | Wiring Diagram | 30 | |
Low Gas Switch | 8 | 32 | ||
Water Flow Switch | 8 | operation | 33 | |
Flame Sensor | 8 | Important | 33 | |
Water Temperature Limit Controls | 9 | General | 33 | |
ON/OFF Switch | 9 | Filling and Purging of Heating Boiler Installation | 33 | |
Circulating | Pump | 9 | Filling Hot Water Supply Boiler Installation | 33 |
Temperature Probes | 9 | Purging Gas Line | 33 | |
Low Water | Cutoff (Optional) | 9 | Inlet Gas Pressure | 33 |
Pressure Relief Valve | 9 | Water Temperature Regulation | 34 | |
GENERAL | 10 | LIGHTING & OPERATION INSTRUCTIONS | 36 | |
Required Ability | 10 | Adjustment | 37 | |
Location | 10 | Setting of the Test Mode | 37 | |
Panels and Covers | 10 | Control System | 37 | |
Chemical Vapor Corrosion | 11 | Inputs to MCB | 38 | |
Installtion Clearances | 11 | Operating Sequence | 39 | |
Leveling | 11 | UIM Operating Procedures | 40 | |
Air Requirements | 11 | Operating Setpoint Adjustment Procedure | 41 | |
Unconfined Space | 11 | High Limit Differential Setpoint Adjustment Procedure | 42 | |
Confined Space | 11 | TROUBLESHOOTING IGNITION SYSTEM | 44 | |
Fresh Air Openings for Confined Spaces | 11 | Troubleshooting Gas Valve | 45 | |
Outdoor Air Through Two Openings | 12 | Main Burner | 45 | |
Outdoor Air Through One Opening | 12 | preventative maintenance | 45 | |
Outdoor Air Through Two Horizontal Ducts | 12 | Relief Valve | 46 | |
Outdoor Air Through Two Vertical Ducts | 12 | Combustion Air Filter | 46 | |
Air From Other Indoor Spaces | 13 | Blower Compartment | 46 | |
Termination Clearances Sidewall Power Vent | 14 | Burner Maintenance | 46 | |
Termination Clearances Sidewall Direct Vent | 15 | Condensate Removal System | 46 | |
VENTING | 16 | Venting Maintenance | 47 | |
Special Installation Considerations | 16 | Heat Exchanger Preventative Maintenance | 47 | |
Venting System Using AL | 16 | Deliming | 47 | |
General Exhaust Vent Installation Procedure | 16 | Tube Cleaning Procedure Mechanical Removal of Deposits | 47 | |
Connecting Vent to Boiler | 16 | Replacement Parts | 47 | |
Venting Supports | 17 | notes | 48 | |
Vertical Installation Requirements | 17 | LIMITED WARRANTY | 51 |
introduction
This design complies with the current edition of the ANSI Z21.13
Compliance under this standard implies that when the boiler underwent test, the gas manifold and control assembly provided on the boiler met safe lighting and other performance criteria.
Detailed installation diagrams are found in this manual. These diagrams will serve to provide the installer a reference for the materials and methods of piping necessary. It is essential that all water, gas piping and wiring be installed as shown on the diagrams. You should thoroughly read and understand this manual before installation and/or operation of this boiler.
The factory warranty will be void if the boiler(s) have been improperly installed or operated.
AL
In addition to these instructions, the boiler(s) shall be installed in
accordance with those installation regulations in force in the local area where the installation is to be made. These shall be carefully followed in all cases. Authorities having jurisdiction should be consulted before installations are made.
In the absence of local codes, the installation must comply with the current editions, as follows:
In the United States:
The National Fuel Gas Code, ANSI Z223.1/NFPA 54 and the National Electric Code, NFPA 70.
6