A.O. Smith VB/VW- 1000, VB/VW- 750 instruction manual Contents, Introduction

Page 6

contents

SAFE INSTALLATION, USE AND SERVICE

2

Horizontal Installtion Requirements

17

GENERAL SAFETY

3

Direct Vent Installation Requirements

19

dimension and capacity data

4

INSTALLATION REQUIREMENTS FOR THE COMMONWEALTH OF

capacity AND FLOW data

5

MASSACHUSETTS

19

contents

6

system installation

22

introduction

6

General

22

Grounding

Instructions

7

Hot Water Heating (Hydronic) Equipment

22

Inlet Water

Considerations

7

Internal Contaminants

23

Correct Gas

7

Hot Water Supply Boiler System - General Water Line Connections...

23

Precautions

7

Hard Water Conditions

23

Liquefied Petroleum Gas Models

7

Thermal Expansion (Closed System)

23

High Altitude Installations

7

Remote Probe Installation Procedure

23

Field Installed Components

7

Gas Connections

24

Control Components

8

Gas Supply Line Sizing

24

The Control System

8

Wiring

28

Hot Surface Igniter

8

Suggested Pipe Sizing Tables

29

Pressure Switches

8

Wiring Diagram

30

Low Gas Switch

8

VB/VW-500, 750 & 1000 SCHEMATIC DIAGRAM

32

Water Flow Switch

8

operation

33

Flame Sensor

8

Important

33

Water Temperature Limit Controls

9

General

33

ON/OFF Switch

9

Filling and Purging of Heating Boiler Installation

33

Circulating

Pump

9

Filling Hot Water Supply Boiler Installation

33

Temperature Probes

9

Purging Gas Line

33

Low Water

Cutoff (Optional)

9

Inlet Gas Pressure

33

Pressure Relief Valve

9

Water Temperature Regulation

34

GENERAL

10

LIGHTING & OPERATION INSTRUCTIONS

36

Required Ability

10

Adjustment

37

Location

10

Setting of the Test Mode

37

Panels and Covers

10

Control System

37

Chemical Vapor Corrosion

11

Inputs to MCB

38

Installtion Clearances

11

Operating Sequence

39

Leveling

11

UIM Operating Procedures

40

Air Requirements

11

Operating Setpoint Adjustment Procedure

41

Unconfined Space

11

High Limit Differential Setpoint Adjustment Procedure

42

Confined Space

11

TROUBLESHOOTING IGNITION SYSTEM

44

Fresh Air Openings for Confined Spaces

11

Troubleshooting Gas Valve

45

Outdoor Air Through Two Openings

12

Main Burner

45

Outdoor Air Through One Opening

12

preventative maintenance

45

Outdoor Air Through Two Horizontal Ducts

12

Relief Valve

46

Outdoor Air Through Two Vertical Ducts

12

Combustion Air Filter

46

Air From Other Indoor Spaces

13

Blower Compartment

46

Termination Clearances Sidewall Power Vent

14

Burner Maintenance

46

Termination Clearances Sidewall Direct Vent

15

Condensate Removal System

46

VENTING

16

Venting Maintenance

47

Special Installation Considerations

16

Heat Exchanger Preventative Maintenance

47

Venting System Using AL 29-4C®

16

Deliming

47

General Exhaust Vent Installation Procedure

16

Tube Cleaning Procedure Mechanical Removal of Deposits

47

Connecting Vent to Boiler

16

Replacement Parts

47

Venting Supports

17

notes

48

Vertical Installation Requirements

17

LIMITED WARRANTY

51

introduction

This design complies with the current edition of the ANSI Z21.13 low-pressure boiler standard.

Compliance under this standard implies that when the boiler underwent test, the gas manifold and control assembly pro­vided on the boiler met safe lighting and other performance criteria.

Detailed installation diagrams are found in this manual. These diagrams will serve to provide the installer a reference for the materials and methods of piping necessary. It is essential that all water, gas piping and wiring be installed as shown on the diagrams. You should thoroughly read and understand this manual before installation and/or operation of this boiler.

The factory warranty will be void if the boiler(s) have been improperly installed or operated.

AL 29-4C®is a registered trademark of Allegheny Ludlum Corporation.

In addition to these instructions, the boiler(s) shall be installed in

accordance with those installation regulations in force in the local area where the installation is to be made. These shall be carefully followed in all cases. Authorities having jurisdiction should be consulted before installations are made.

In the absence of local codes, the installation must comply with the current editions, as follows:

In the United States:

The National Fuel Gas Code, ANSI Z223.1/NFPA 54 and the National Electric Code, NFPA 70.

6

Image 6
Contents Models Safe INSTALLATION, USE and Service General Safety Dimension and capacity data GAS and Electrical CharacteristicsRecovery Capacities Capacity and Flow dataContents IntroductionField Installed Components PrecautionsHigh Altitude Installations Grounding InstructionsControl Components Temperature Probes Water Temperature Limit ControlsON/OFF Switch Circulating PumpPanels and Covers Required AbilityLocation VB HOT Water Heating BOILERS, are shipped with a 50 psiLeveling Installtion ClearancesChemical Vapor Corrosion Air Requirements Breathing Hazard Carbon Monoxide GasOutdoorAir Through Two HorizontalDucts Outdoor Air Through Two OpeningsOutdoor Air Through One Opening Outdoor Air Through Two Vertical DuctsAir From Other Indoor Spaces Termination Clearances Sidewall Power Vent Power VentTermination Clearances Sidewall Direct Vent Direct VentSpecial Installation Considerations Venting System Using AL 29-4CConnecting Vent to Boiler Vertical Installation Requirements Horizontal Installtion RequirementsVenting Supports Vertical Termination Direct Vent Installation Requirements BELOW. Keep Clear of ALL ObstructionsDirect Vent Horizontal Direct Vent Using TWT with Vertical Intake System installation GeneralHot Water Heating Hydronic Equipment Hard Water Conditions Remote Probe Installation ProcedureInternal Contaminants Thermal Expansion Closed SystemGas Connections Gas Supply Line SizingTypical PRIMARY, Secondary Piping ONE VF Model VW HOT Water Supply Boiler with Vertical Tank ONE VF Model VW HOT Water Supply Boiler with Horizontal Tank Wiring Suggested Pipe Size For Multiple Gas Appliances Natural Gas Suggested Pipe Size For Multiple Gas Appliances Propane GasWiring Diagram Connection DiagramPage VB/VW-500, 750 & 1000 Schematic Diagram Operation Filling and Purging of Heating Boiler InstallationFilling Hot Water Supply Boiler Installation Purging Gas LineWater Temperature Regulation Risk of ScaldsMCB Ten Position Dipswitch MCB/FCB DipswitchesMCB Three position Dipswitch Lighting & Operation Instructions for Models VB/VW 500, 750 High Fire Setting Natural GAS AdjustmentSetting of the Test Mode PropaneInputs to MCB Temperature Setpoints System Control Algorithm Operating SequenceUIM Operating Procedures OperatingSetpointAdjustmentProcedure Description of FCB control statesHighLimitDifferentialSetpointAdjustment Procedure Fault Messages and Troubleshooting Guide UIM LED’sTroubleshooting Ignition System Fault Displayed Description Red LED LockoutPreventative maintenance Troubleshooting Gas ValveMain Burner Combustion Air Filter Burner MaintenanceRelief Valve Blower CompartmentTube Cleaning Procedure Mechanical Removal of Deposits Venting MaintenanceHeatExchangerPreventativeMaintenance Replacement PartsPage Page Page Limited Warranty Tennessee Waltz Parkway, Ashland City, TN Phone