A.O. Smith VB/VW- 750, VB/VW- 1000 ONE VF Model VW HOT Water Supply Boiler with Horizontal Tank

Page 27

ONE VF (MODEL VW) HOT WATER SUPPLY BOILER WITH HORIZONTAL TANK

INSTALL IN ACCORDANCE WITH ALL LOCAL CODES.

WHEN BLOW DOWN VALVE IS REQUIRED, INSTALL

IN PLACE OF THE DRAIN VALVE SHOWN.

27

DANGER

TEMPERATURE SETTING SHOULD

NOT EXCEED SAFE USE TEMPERATURE

AT FIXTURES. IF HIGHER PREHEAT

TEMPERATURES ARE NECESSARY

TO OBTAIN ADEQUATE BOOSTER

OUTPUT, ADD AN ANTI-SCALD VALVE

FOR HOT WATER SUPPLIED TO

FIXTURES, SEE TABLE 8.

FIGURE 15.

Image 27
Contents Models Safe INSTALLATION, USE and Service General Safety GAS and Electrical Characteristics Dimension and capacity dataCapacity and Flow data Recovery CapacitiesIntroduction ContentsGrounding Instructions PrecautionsHigh Altitude Installations Field Installed ComponentsControl Components Circulating Pump Water Temperature Limit ControlsON/OFF Switch Temperature ProbesVB HOT Water Heating BOILERS, are shipped with a 50 psi Required AbilityLocation Panels and CoversAir Requirements Breathing Hazard Carbon Monoxide Gas Installtion ClearancesChemical Vapor Corrosion LevelingOutdoor Air Through Two Vertical Ducts Outdoor Air Through Two OpeningsOutdoor Air Through One Opening OutdoorAir Through Two HorizontalDuctsAir From Other Indoor Spaces Power Vent Termination Clearances Sidewall Power VentDirect Vent Termination Clearances Sidewall Direct VentSpecial Installation Considerations Venting System Using AL 29-4CConnecting Vent to Boiler Vertical Installation Requirements Horizontal Installtion RequirementsVenting Supports Vertical Termination BELOW. Keep Clear of ALL Obstructions Direct Vent Installation RequirementsDirect Vent Horizontal Direct Vent Using TWT with Vertical Intake System installation GeneralHot Water Heating Hydronic Equipment Thermal Expansion Closed System Remote Probe Installation ProcedureInternal Contaminants Hard Water Conditions Gas Supply Line Sizing Gas ConnectionsTypical PRIMARY, Secondary Piping ONE VF Model VW HOT Water Supply Boiler with Vertical Tank ONE VF Model VW HOT Water Supply Boiler with Horizontal Tank Wiring Suggested Pipe Size For Multiple Gas Appliances Propane Gas Suggested Pipe Size For Multiple Gas Appliances Natural GasConnection Diagram Wiring DiagramPage VB/VW-500, 750 & 1000 Schematic Diagram Purging Gas Line Filling and Purging of Heating Boiler InstallationFilling Hot Water Supply Boiler Installation OperationRisk of Scalds Water Temperature RegulationMCB Ten Position Dipswitch MCB/FCB DipswitchesMCB Three position Dipswitch Lighting & Operation Instructions for Models VB/VW 500, 750 Propane AdjustmentSetting of the Test Mode High Fire Setting Natural GASInputs to MCB Operating Sequence Temperature Setpoints System Control AlgorithmUIM Operating Procedures Description of FCB control states OperatingSetpointAdjustmentProcedureHighLimitDifferentialSetpointAdjustment Procedure UIM LED’s Fault Messages and Troubleshooting GuideFault Displayed Description Red LED Lockout Troubleshooting Ignition SystemPreventative maintenance Troubleshooting Gas ValveMain Burner Blower Compartment Burner MaintenanceRelief Valve Combustion Air FilterReplacement Parts Venting MaintenanceHeatExchangerPreventativeMaintenance Tube Cleaning Procedure Mechanical Removal of DepositsPage Page Page Limited Warranty Tennessee Waltz Parkway, Ashland City, TN Phone