A.O. Smith VB/VW- 750, VB/VW- 1000 instruction manual Direct Vent Installation Requirements

Page 19

Direct Vent Installation Requirements

Follow the guidelines in the “HORIZONTAL INSTALLATION REQUIREMENTS” section for the exhausting of flue products.

IMPORTANT

The labels in the Direct Vent Kit must be affixed to the boiler in locations specified by the instruction sheet provided in the kit. The following are requirements for the Air-Intake Terminal (AIT):

1.The Air-Intake System (AIS) must terminate­ with the venting equipment pro­vided with the boiler, Refer to the parts list for required direct vent parts.

2.The AIT shall not be located less than 3 feet (1.0m) below any exhaust vent within 10 feet (3.0m), see “HORI­ZONTAL INSTALLATION REQUIREMENTS”­ section­.

3.The total horizontal distance of the AIS from the boiler’s Blower

Adapter to the outside of the “AIT” shall not be greater than 70 “equivalent” feet (21.3m) of vent pipe nor less than 3 feet (1.0m), excluding elbows. A maximum of 3 elbows, equivalent­ to 10 feet

(3.0m) each of pipe may be used.

INSTALLATION REQUIREMENTS FOR THE COMMONWEALTH OF MASSACHUSETTS

For all side wall terminated, horizontally vented power vent, direct vent, and power direct vent gas fueled water heaters installed in every dwelling, building or structure used in whole or in part for residential purposes, including those owned or operated by the Commonwealth and where the side wall exhaust vent termination is less than seven (7) feet above finished grade in the area of the venting, including but not limited to decks and porches, the following requirements shall be satisfied:

INSTALLATION OF CARBON MONOXIDE DETECTORS At the time of installation of the side wall horizontal vented gas fueled equipment, the installing plumber or gasfitter shall observe that a hard wired carbon monoxide detector with an alarm and battery back-up is installed on the floor level where the gas equipment is to be installed. In addition, the installing plumber or gasfitter shall observe that a battery operated or hard wired carbon monoxide detector with an alarm is installed on each additional level of the dwelling, building or structure served by the sidewall horizontal vented gas fueled equipment. It shall be the responsibility of the property owner to secure the services of qualified licensed professionals for the installation of hard wired carbon monoxide detectors.

In the event that the side wall horizontally vented gas fueled equipment is installed in a crawl space or an attic, the hard wired carbon monoxide detector with alarm and battery back-up may be installed on the next adjacent floor level.

In the event that the requirements of this subdivision can not be met at the time of completion of installation, the owner shall have a period of thirty (30) days to comply with the above requirements provided that during said thirty (30) day period, a battery operated carbon monoxide detector with an alarm shall be installed.

APPROVED CARBON MONOXIDE DETECTORS Each carbon monoxide detector as required in accordance with the above provisions shall comply with NFPA 720 and be ANSI/UL 2034 listed and CSA certified.

SIGNAGE A metal or plastic identification plate shall be permanently mounted to the exterior of the building at a minimum height of eight (8) feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment. The sign shall read, in print size no less than one-half (1/2) inch in size, “GAS VENT DIRECTLY

BELOW. KEEP CLEAR OF ALL OBSTRUCTIONS.”

INSPECTION The state or local gas inspector of the side wall horizontally vented gas fueled equipment shall not approve the installation unless, upon inspection, the inspector observes carbon monoxide detectors and signage installed in accordance with the provisions of 248 CMR 5.08(2)(a) 1 through 4.

EXEMPTIONS: The following equipment is exempt from 248 CMR 5.08(2)(a)1 through 4:

1.The equipment listed in Chapter 10 entitled “Equipment Not Required To Be Vented” in the most current edition of NFPA 54 as adopted by the Board; and

2.Product Approved side wall horizontally vented gas fueled equipment installed in a room or structure separate from the dwelling, building, or structure used in whole or in part for residential purposes.

MANUFACTURER REQUIREMENTS - GAS EQUIPMENT VENTING SYSTEM PROVIDED When the manufacturer of Product Approved side wall horizontally vented gas equipment provides a venting system design or venting system components with the equipment, the instructions provided by the manufacturer for installation of the equipment and the venting system shall include:

1.Detailed instructions for the installation of the venting system design or the venting system components; and

2.A complete parts list for the venting system design or venting system.

MANUFACTURER REQUIREMENTS - GAS EQUIPMENT VENTING SYSTEM NOT PROVIDED When the manufacturer of a Product Approved side wall horizontally vented gas fueled equipment does not provide the parts for venting the flue gases, but identifies “special venting systems,” the following requirements shall be satisfied by the manufacturer:

1.The referenced “special venting system” instructions shall be included with the appliance or equipment installation instructions; and

2.The “special venting systems” shall be Product Approved by the Board, and the instructions for that system shall include a parts list and detailed installation instructions.

A copy of all installation instructions for all Product Approved side wall horizontally vented gas fueled equipment, all venting instructions, all parts lists for venting instructions, and/or all venting design instructions shall remain with the appliance or equipment at the completion of the installation.

19

Image 19
Contents Models Safe INSTALLATION, USE and Service General Safety GAS and Electrical Characteristics Dimension and capacity dataCapacity and Flow data Recovery CapacitiesIntroduction ContentsGrounding Instructions PrecautionsHigh Altitude Installations Field Installed ComponentsControl Components Circulating Pump Water Temperature Limit ControlsON/OFF Switch Temperature ProbesVB HOT Water Heating BOILERS, are shipped with a 50 psi Required AbilityLocation Panels and CoversAir Requirements Breathing Hazard Carbon Monoxide Gas Installtion ClearancesChemical Vapor Corrosion LevelingOutdoor Air Through Two Vertical Ducts Outdoor Air Through Two OpeningsOutdoor Air Through One Opening OutdoorAir Through Two HorizontalDuctsAir From Other Indoor Spaces Power Vent Termination Clearances Sidewall Power VentDirect Vent Termination Clearances Sidewall Direct VentVenting System Using AL 29-4C Special Installation ConsiderationsConnecting Vent to Boiler Horizontal Installtion Requirements Vertical Installation RequirementsVenting Supports Vertical Termination BELOW. Keep Clear of ALL Obstructions Direct Vent Installation RequirementsDirect Vent Horizontal Direct Vent Using TWT with Vertical Intake General System installationHot Water Heating Hydronic Equipment Thermal Expansion Closed System Remote Probe Installation ProcedureInternal Contaminants Hard Water ConditionsGas Supply Line Sizing Gas ConnectionsTypical PRIMARY, Secondary Piping ONE VF Model VW HOT Water Supply Boiler with Vertical Tank ONE VF Model VW HOT Water Supply Boiler with Horizontal Tank Wiring Suggested Pipe Size For Multiple Gas Appliances Propane Gas Suggested Pipe Size For Multiple Gas Appliances Natural GasConnection Diagram Wiring DiagramPage VB/VW-500, 750 & 1000 Schematic Diagram Purging Gas Line Filling and Purging of Heating Boiler InstallationFilling Hot Water Supply Boiler Installation OperationRisk of Scalds Water Temperature RegulationMCB/FCB Dipswitches MCB Ten Position DipswitchMCB Three position Dipswitch Lighting & Operation Instructions for Models VB/VW 500, 750 Propane AdjustmentSetting of the Test Mode High Fire Setting Natural GASInputs to MCB Operating Sequence Temperature Setpoints System Control AlgorithmUIM Operating Procedures Description of FCB control states OperatingSetpointAdjustmentProcedureHighLimitDifferentialSetpointAdjustment Procedure UIM LED’s Fault Messages and Troubleshooting GuideFault Displayed Description Red LED Lockout Troubleshooting Ignition SystemTroubleshooting Gas Valve Preventative maintenanceMain Burner Blower Compartment Burner MaintenanceRelief Valve Combustion Air FilterReplacement Parts Venting MaintenanceHeatExchangerPreventativeMaintenance Tube Cleaning Procedure Mechanical Removal of DepositsPage Page Page Limited Warranty Tennessee Waltz Parkway, Ashland City, TN Phone

VB/VW- 1000, VB/VW- 750 specifications

A.O. Smith is a renowned name in the water heating industry, and their VB/VW-750 and VB/VW-1000 models reflect the cutting-edge advancements in both design and functionality. These commercial water heaters stand out due to their innovative features and robust characteristics, making them ideal solutions for various applications in commercial settings.

The VB/VW-750 and VB/VW-1000 models are designed with high efficiency in mind. They utilize advanced heat transfer technology that maximizes energy use, translating to significant savings on utility bills. These units are engineered to deliver consistent hot water supply, essential for businesses such as restaurants, hotels, and manufacturing facilities where extensive hot water demands are necessary.

One of the standout features of the VB/VW models is their high recovery rate. This means they can produce a large volume of hot water within a short period, catering to peak demand times without compromising performance. Additionally, the units come equipped with a durable tank made from high-quality materials to resist corrosion, which ensures a long lifespan and reliability in service.

The VB/VW-750 and VB/VW-1000 are also equipped with advanced control systems. These systems provide precise temperature regulation, improving safety and energy efficiency. The smart pumping system further enhances performance by optimizing water flow and reducing energy consumption during operation.

Maintenance and serviceability are key characteristics of these models. They feature easy access to critical components, allowing for quick inspections and repairs. This design consideration minimizes downtime, which is crucial for any business reliant on continuous hot water supply.

Both models are compliant with various industry standards, including energy efficiency regulations. A.O. Smith has focused on ensuring these water heaters not only meet but exceed these requirements, contributing to sustainability efforts.

In summary, the A.O. Smith VB/VW-750 and VB/VW-1000 models combine efficiency, reliability, and ease of maintenance. Their advanced features and cutting-edge technologies make them a top choice for commercial hot water applications, positioning A.O. Smith as a leader in the water heating industry. With their strong performance and durability, these models are designed to meet the demands of modern businesses while providing peace of mind regarding hot water availability.