FastIron GS Compact Layer 2 Switch Hardware Installation Guide
GENERAL REQUIREMENTS | |
SUMMARY OF INSTALLATION TASKS | |
INSTALLATION PRECAUTIONS | |
GENERAL PRECAUTIONS | |
LIFTING PRECAUTIONS | |
POWER SUPPLY PRECAUTIONS | |
PREPARING THE INSTALLATION SITE | |
CABLING INFRASTRUCTURE | |
INSTALLATION LOCATION | |
INSTALLING AN ADDITIONAL POWER SUPPLY | |
INSTALLING AN AC POWER SUPPLY | |
INSTALLING A DC POWER SUPPLY | |
INSTALLING THE DEVICE | |
DESKTOP INSTALLATION | |
RACK MOUNT INSTALLATION | |
WALL MOUNT INSTALLATION | |
POWERING ON THE SYSTEM | |
POWERING OFF THE SYSTEM | |
VERIFYING PROPER OPERATION | |
OBSERVING THE POWER STATUS LEDS | |
ATTACHING A PC OR TERMINAL |
CHAPTER 4 |
|
CONNECTING NETWORK DEVICES AND |
|
CHECKING CONNECTIVITY | |
ASSIGNING PERMANENT PASSWORDS | |
RECOVERING FROM A LOST PASSWORD | |
CONFIGURING IP ADDRESSES | |
DEVICES RUNNING LAYER 2 SOFTWARE | |
CONNECTING NETWORK DEVICES | |
CABLE SPECIFICATIONS | |
CONNECTING TO ETHERNET OR FAST ETHERNET HUBS | |
CONNECTING TO WORKSTATIONS, SERVERS, OR ROUTERS | |
CONNECTING A NETWORK DEVICE TO A FIBER PORT | |
TESTING CONNECTIVITY | |
PINGING AN IP ADDRESS | |
OBSERVING LEDS | |
TRACING A ROUTE | |
TROUBLESHOOTING NETWORK CONNECTIONS | |
USING VIRTUAL CABLE TESTING TO DIAGNOSE A CABLE | |
CHAPTER 5 |
|
MANAGING THE FASTIRON GS CHASSIS | |
MANAGING TEMPERATURE SETTINGS | |
USING THE TEMPERATURE SENSOR |
iv | © 2007 Foundry Networks, Inc. | September 2007 |