Manuals
/
Foundry Networks
/
Computer Equipment
/
Network Hardware
Foundry Networks
FGS648P-POE, FGS624P-POE, FGS624XGP-POE
manual
September
Models:
FGS648P
FGS624XGP-POE
FGS624P
FGS624XGP
FGS648P-POE
FGS624P-POE
1
22
96
96
Download
96 pages
59.24 Kb
19
20
21
22
23
24
25
26
Specs
Install
Pinouts and Signalling
Password
Connecting Network Devices
Warranty
Dimension
Maintenance
Configuring IP Addresses
Reset Button
Page 22
Image 22
FastIron GS Compact Layer 2 Switch Hardware Installation Guide
2 - 14
© 2007 Foundry Networks, Inc.
September 2007
Page 21
Page 23
Page 22
Image 22
Page 21
Page 23
Contents
FGS Release
Page
Contents
Hecking C Onnectivity
Hardware Specifications
Egulatory S Tatements
What’s Included in This Edition?
Chapter About This Guide
Introduction
Audience
Warranty Coverage
How to Get Help
Related Publications
Chapter Product Overview
Product Overview
Hardware Features
Software Features
FGS624P and FGS624P-POE
FGS624XGP and FGS624XGP-POE
FGS648P and FGS648P-POE
Control Features
Shows the FGS648P and FGS648P-POE
Serial Management Interface Console Port
Optional 2-port 10-GbE Module port 49
Network Interfaces
Reset Button
Network Interfaces Show Media Description
10/100/1000 Mbps Ports
Port 10-GbE Module
Port 10-GbE Hybrid Interface Module Release
Port CX4 Module Release
10GbE XFP Transceiver FGS624XGP Models Only
10GbE XG and CX4 Module
CX4 10Gbps XFP Transceiver
Position State Meaning 10/100/1000 Copper Port LEDs
LEDs for Network Interfaces and Power Supplies
LEDs
100/1000 Fiber Port LEDs
Gbps Port LEDs
Power Supply LEDs
Position State Meaning
POE Port LEDs
Fiber Optic Modules
Power Supplies
Position State Meaning Stacking LEDs
Power Specifications for POE
Cooling System and Fans
September
Unpacking a System
Chapter Installing the FastIron GS Chassis
Package Contents
General Requirements
Summary of Installation Tasks
Summary of Installation Tasks Where to Find More Information
Lifting Precautions
Installation Precautions
General Precautions
Summary of Installation Tasks
Power Supply Precautions
Installing an Additional Power Supply
Preparing the Installation Site
Cabling Infrastructure Installation Location
Installing an AC Power Supply
Power supply locking screw Latches
Retaining Bale AC Power Cord
Installing a DC Power Supply
Ground screw Negative terminal screw
Ground
Desktop Installation
Installing the Device
Rack Mount Installation
Attaching the Short Mounting Brackets
Wall Mount Installation
Installing the Brackets and Mounting the Device
Powering On the System
Install top screws Install device
Powering Off the System
Verifying Proper Operation
LEDs for Power
Observing the Power Status LEDs
Attaching a PC or Terminal
FastIron FastIron-PREM
DB-9 to DB-9
Chapter Connecting Network Devices Checking Connectivity
Assigning Permanent Passwords
Recovering from a Lost Password
Configuring IP Addresses
Devices Running Layer 2 Software
Cable Specifications
Connecting Network Devices
Connecting to Ethernet or Fast Ethernet Hubs
Installing a Fiber Optic Module
Connecting to Workstations, Servers, or Routers
Connecting a Network Device to a Fiber Port
Automatic MDI/MDIX Detection
Pinging an IP Address
Testing Connectivity
Cleaning the Fiber-Optic Connectors
Cabling a Fiber Optic Module
Network Connection-Related LED States
Observing LEDs
Desired Meaning Abnormal Meaning/Action State
Configuration Notes
Troubleshooting Network Connections
Using Virtual Cable Testing to Diagnose a Cable
Command Syntax
This Line
Viewing the Results of the Cable Analysis
Cable Statistics Displays
September
Displaying the Temperature
Managing Temperature Settings
Using the Temperature Sensor
Chapter Managing the FastIron GS Chassis
Displaying Temperature Messages
Changing the Temperature Warning Level
Displaying Management Module CPU Usage
Changing the Chassis Temperature Polling Interval
Removing MAC Address Entries
September
Chassis Specifications
Chapter Hardware Specifications
Power Supply Specifications
Environmental Considerations
Chassis Specifications
Physical Dimensions and Weight
Storage Environment
Regulatory Compliance
Cooling
Chassis Regulatory Compliance Description Certifications
Power Source Interruptions
Mean Time Between Failure
Power Draw Specifications
Power Supply Draw Specifications Model Typical Maximum
Pinouts and Signalling
Serial Console Port Pinouts
Lists the pin assignment and signalling for 10/100/100 ports
10/100 and Gigabit Port Pinouts
LC connector 62.5/125 200 For SFP module
Warranty
Power Supply Specifications
Power Cords
LC connector 1530.33 Up to For XFP module 1561.42 nm 80 km
Key features
10 Maximum Power Supply Consumption for FGS Models FGS624
Power Supply Consumption
FGS648
11 Input Connector for Power Supplies
Input Connector and Plug
Power Supply Input Connector Properties
Safety Warnings
13 Safety Warning Labels on Power Supplies
Electrical Specifications
Output Specifications
Replacing a Power Supply
Hardware Maintenance Schedule
Chapter Maintaining the FastIron GS Hardware
Determining Which Power Supply Failed
Installation Precautions and Warnings
AC Power Supplies
Removing an AC Power Supply
Locking screw
Installing an AC Power Supply
DC Power Supplies
Removing a DC Power Supply
Shows a front view of the DC power supply
Installing a DC Power Supply
Ground
Installing a 2-port 10-GbE Module
Installing or Replacing a 2-port 10-GbE Module
Removing a 2-port 10-GbE Module
Installing or Replacing a POE Daughter Card
Installing a 2-port 10-GbE Module
Disassembling the Chassis
Removing the Screws for the Top Cover
Installing a POE Daughter Card
Removing the Top Cover
POE Daughter Card
Re-assembling the Chassis
POE Daughter Cards
Replacing a Fiber Optic Module
Removing a Fiber Optic Module
Installing a New Fiber Optic Module
Cleaning the Fiber-Optic Connectors
Cabling a Fiber Optic Module
Digital Optical Monitoring
Status Value Description
Supported Media
CLI Commands
No optical-monitor alarm interval
Show optic port/slotnumber
Europe and Australia
Appendix a Regulatory Statements
Industry Canada Statement
Japan
English Translation of above statement
Appendix B
Foundry Networks, Inc
Page
Foundry Networks, Inc
Page
September
Page
September
Top
Page
Image
Contents