Crown Boiler BWC Series installation instructions VENT/ AIR Intake Fitting Equivalent Length

Page 15

TABLE 6.5: PERMISSIBLE VENT SYSTEMS AND PRINCIPLE VENT COMPONENTS

MANUFACTURER

VENT SYSTEM

SIZE

WALL

HORIZONTAL

VERTICAL

THIMBLES

TERMINATION

TERMINATION

 

 

 

 

 

 

 

 

 

 

 

 

7393GC

ELBOW: 7314TERM

 

 

SAF-T VENT

3

7393GCS

TEE: 7390TEE

9392

 

 

5391CI

 

 

HEAT FAB

EZ SEAL

 

 

 

 

 

 

 

 

 

 

7493GC

ELBOW: 7414TERM

 

 

 

4

7493GCS

9492

 

 

TEE: 7490TEE

 

 

 

5491CI

 

 

 

 

 

 

 

 

 

 

 

 

PROTECH

 

3

FSWT3

ELBOW: FSELB9003 + FSBS3

FSBS3

 

TEE: FSTT3

SYSTEMS

FASNSEAL

 

 

 

 

 

 

 

 

 

ELBOW: FSELB9004 + FSBS4

 

INC.

 

4

FSWT4

FSBS4

 

TEE: FSTT4

 

 

 

 

 

 

 

 

 

 

 

 

 

3

2SVSWTEF03

ELBOW: 2SVSTEX0390

24SVSTPF03

 

SVE

TEE: 2SVSTTF03

 

 

 

 

Z-FLEX

SERIES III

 

 

ELBOW:

 

 

(“Z-VENT III”)

4

2SVSWTEF04

2SVEEWCF0490 + 2SVSTPF04

24SVSTPF04

 

 

 

 

TEE: 2SVSTTF04

 

 

 

3

SR03WT15

ELBOW: SRTE-03

SRTP-03

 

 

TEE: SRTT-03

FLEX-L INTL.

STAR-34

 

 

 

4

SR04WT15

ELBOW: SRTE-04

SRTP-04

 

 

 

 

TEE: SRTT-04

 

 

 

 

 

NOTE: See vent system manufacturer’s literature for other part numbers that are required such as straight pipe, elbows, firestops and vent supports.

TABLE 6.6: VENT/ AIR INTAKE FITTING

EQUIVALENT LENGTH

VENT FITTING

EQUIVALENT

 

LENGTH (ft)

3” 90 ELBOW

5.5

3” 45 ELBOW

4.0

 

 

4” 90 ELBOW

8.0

 

 

4” 45 ELBOW

4.5

 

 

13

Image 15
Contents BWC Series Page VII II Specifications Product DescriptionIV Locating the Boiler III Before InstallingMinimum Clearance To Combustible Material Air for Ventilation Page Vent System Design VI VentingHorizontal Direct Venting Vent Options 1,2 2a Summary of Horizontal Venting Options 3c Positioning Vent Terminal Under Overhangs Vertical Direct Vent System Vent Options 6 2b Summary of Vertical Venting Options VENT/ AIR Intake Fitting Equivalent Length Removing an Existing Boiler From a Common Chimney Vent / Intake System Assembly7a STAR-34 Connection to Vent Collar Z-VENT III Connection to Vent Collar SAF-T Vent Ezseal Connection to Vent Collar 10 Fasnseal Connection to Vent Collar 11 Condensate Piping Arrangement Gas Connection To Boiler VII Gas PipingGeneral System Piping Precautions Viii System PipingSystem Design Method 1 Primary/Secondary Piping Boiler in Secondary Loop Piping Method #1 Heat Only 4a Piping Method #1 Secondary Loop Piping Shaded Pipe and Circulator Sizing for Boiler Loop Fitting Equivalent Lengths Method 2 Primary/Secondary Piping Boiler in Primary Loop Piping Method #2 Heat Only 10a Piping Method #2 Secondary Loop Piping Bolded Page Flow GPM Piping for Special Situations 14 Chiller Piping IX Wiring Wiring Connections Diagram Ladder Diagram Page Start-up and Checkout BWC Series Lighting and Operating Instructions For Your Safety Read Before LightingBWC Burner Typical CO2/O2 Combustion Readings Gas Valve DetailPage XI Operation Normal Display In Standby ModePage 170 First Digit Boiler Status Boiler StatusOutdoor Reset Curve Continuously XII. Service and MaintenancePage No Error Code Displayed XIII. TroubleshootingCode Condition Possible Causes Soft Lockout Codes DisplayedHard Lockout Codes Displayed XIV Parts BWC Replacement Parts List TBD Page Page Page Page Ignition Electrode Gasket, 5mm 240011 Page BWC Replacement Parts List Page Page Page Page Page PN 980040 BWC 08/05