Desa VGN30B, VN2000BB Placing Heater On Mounting Bracket, Installing Bottom Mounting Screws

Page 13

INSTALLING TO WALL

Continued

4.For thin walls (1/2" or less), insert red key into wall anchor. Push red key to “pop” open anchor wings. IMPORTANT: Do not hammer key!

For thick walls (over 1/2" thick) or solid walls, do not pop open wings.

Figure 9 - Popping Open Anchor Wings For Thin Walls

5.Place mounting bracket onto wall. Line up last hole on each end of bracket with wall anchors.

6.Insert mounting screws through bracket and into wall anchors.

7.Tighten screws until mounting bracket is firmly fastened to wall.

Placing Heater On Mounting Bracket

1.Locate two horizontal slots on back panel of heater.

2.Place heater onto mounting bracket. Slide horizontal slots onto stand-out tabs on mounting bracket.

 

Horizontal Slots

Stand-Out Tab

Mounting Bracket

 

 

(attached to wall)

Figure 10 - Mounting Heater Onto Mounting Bracket

Installing Bottom Mounting Screws

1.Locate two bottom mounting holes. These holes are near bottom on back panel of heater (see Figure 11).

2.Mark screw locations on wall.

3.Remove heater from mounting bracket.

4.If installing bottom mounting screws into hollow or solid wall, install wall anchors. Follow steps 1 through 4 under Attaching To Wall Anchor Method, page 12.

If installing bottom mounting screw into wall stud, drill holes at marked loca- tions using 9/64" drill bit.

5.Replace heater onto mounting bracket.

6.Place spacers between bottom mounting holes and wall anchor or drilled hole.

7.Hold spacer in place with one hand. With other hand, insert mounting screw through bottom mounting hole and spacer. Place tip of screw in opening of wall anchor or drilled hole.

8.Tighten both screws until heater is firmly secured to wall. Do not over tighten. Note: Do not replace front panel at this time. Replace front panel after making

gas connections and checking for leaks (see pages 14-16).

Figure 11 - Installing Bottom Mounting Screws

Continued

100099

13

Image 13
Contents What to do if YOU Smell GAS OWNER’S Operation and Installation ManualSafety ContentsSafety Information Local Codes Product IdentificationUnpacking ProductCombustion Fresh AIR ForVentilation Producing Adequate VentilationDetermining FRESH-AIR Flow for Heater Location Fresh AIRDetermining if You Have a Confined or Unconfined Space Ventilation AIR Fresh AIR for Combustion and VentilationVentilation Air From Inside Building Ventilation Air From Outdoors Ventilation AIRInstallation Items Installing To WallCheck GAS Type Locating HeaterRight Ceiling16 3/ 4 VGN30B FloorMounting Bracket Installing Heater to WallRemoving Front Panel Of Heater Methods For Attaching Mounting Bracket To WallAttaching Mounting Bracket To Wall Marking Screw LocationsPlacing Heater On Mounting Bracket Installing Bottom Mounting ScrewsConnecting to GAS Supply Checking GAS Pressure Testing GAS Supply Piping SystemConnections Servicing. Correct all leaks at onceChecking Pressure Testing Heater GAS ConnectionsHeater OperatingPilot Operating HeaterBurner InspectingPilot Flame Pattern Shutting Off HeaterBurner Flame Pattern Inspecting BurnerCorrect Flame Pattern AT High Position Incorrect Flame Pattern AT High PositionMaintenance CleaningTrouble Shooting ODS/PILOT and BurnerTROUBLE- Shooting See CleaningFrom Top Ing statement atService Hints Technical ServiceVGN30B Parts Under Warranty Replacement PartsParts Not Under Warranty Manual Shutoff AccessoriesFloor Mounting Stand ODS/Pilot KEY Part Number Description QTY VGN30B Parts List12-2 12-1 VN2000BB Limited Warranty Vanguard VENT-FREE Heaters Warranty Information