D. Vent Diagrams

WARNING

Fire Risk. Explosion Risk.

Do NOT pack insulation or other combustibles between ceiling firestops.

ALWAYS maintain specified clearances around venting and firestop systems.

Install wall shield and ceiling firestops as specified.

Failure to keep insulation or other material away from vent pipe may cause fire.

1.Top Vent - Horizontal Termination One Elbow

Figure 5.3

Two Elbows

V1 Minimum

H1 Maximum

3 ft.

 

 

0.9 m

2 ft.

 

0.6 m

4 ft.

 

 

1.2 m

4 ft.

 

1.2 m

5 ft.

 

 

1.5 m

6 ft.

 

1.8 m

12 ft.

 

 

3.7m

20 ft.

 

6.1 m

V1

+ H1

= 40 ft. (12.2 m) Maximum

 

H1 = 20 ft. (6.1 m) Maximum

 

Note: When installing the TAOS surround and venting with one elbow, a straight sec- tion of venting (30 in. minimum) MUST be attached directly to starting collars on unit.

Note: The first elbow used MUST always be DVP90ST.

V1 Minimum

H1 + H2 Maximum

3 ft.

0.9 m

2 ft.

0.6 m

4 ft.

1.2 m

4 ft.

1.2 m

5 ft.

1.5 m

6 ft.

1.8 m

12 ft.

3.7 m

20 ft.

6.1 m

V1 + H1 + H2 = 40 ft. (12.2 m) Maximum

H1 + H2 = 20 ft. (6.1 m) Maximum

Note: V1 MUST be a minimum of 3 feet unless using the TAOS surround. For TAOS surround, V1 minimum MUST be 30 in.

Note: The first elbow used

MUST always be DVP90ST.

Figure 5.4

Heat & Glo • Bravo • 704-902 Rev. E • 7/08

13

Image 13
Contents What to do if you smell gas Model BravoHomeowner Reference Information CongratulationsTable of Contents Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsGetting Started Installation to ensure maximum safety and benefitTools and Supplies Needed Selecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseClearance to Combustibles Clearances to Mantels or Combustibles above Appliance Mantel Projections Vent Termination Minimum Clearances Termination LocationsAlcove Applications Vent Table Key Vent Information and DiagramsUse of Elbows Measuring StandardsTop Vent Horizontal Termination One Elbow Vent DiagramsMinimum Maximum V1 Minimum H1 + H2 MaximumV1 + V2 Minimum H1 + H2 Maximum Top Vent Horizontal Termination Three ElbowsFlue Outlet Top Vent Vertical Termination No Elbow V1 = 46 ft. Max .0 mV1 Minimum H1 Maximum H1 + H2 Top Vent Vertical TerminationPipe Clearances to Combustibles Vent Clearances and FramingWall Penetration Framing Combustible Wall PenetrationInstalling Attic Shield Installing the Ceiling FirestopVertical Penetration Framing Securing and Leveling the Appliance Appliance PreparationAssembly of Vent Sections DVP Pipe Installing Vent PipeAttaching Vent to the Firebox Assembly Assembling Pipe SectionsAssembling DVP-12A Slip Sections Assembling Minimum Installations MI SectionsSecuring the Vent Sections Vertical Sections Disassembly of Vent SectionsHorizontal Sections Installing the Horizontal Termination Cap Installing Heat Shield and Horizontal Termination CapHeat Shield Requirements for Horizontal Termination 13 Minimum Height from Roof to Lowest Installing Roof Flashing and Vertical Ter- mination Cap17 Assembling the Storm Collar Around the Pipe Assembling and Installing Storm CollarFuel Conversions Gas Connection Gas InformationGas Pressures High Altitude Installations Connecting to the Appliance Recommendation for WireIntellifire Ignition System Wiring Wall Switch RequiredLOW Voltage See Note GRN wire Ground attached To GRN screw with Inside box Junction Box InstallationFacing Material FinishingOption a Flush Wall Finish Finishing StylesOption B Kiva-style Arch Option C Southwestern kiva-style Option D Flush Wall Finish with Luxor Surround Flush wall installation with Luxor SurroundClean the Appliance Appliance SetupAccessories Lava Rock and Ember PlacementPositioning the Logs Log Assembly LOGS-BRAVORight Grate Tine LOG #6 Air Shutter Settings Glass AssemblyRemoving Glass Assembly Replacing Glass AssemblyBefore Lighting Appliance Operating InstructionsIntellifire Ignition Lighting ApplianceInitial Break-in Procedure Frequently Asked QuestionsAfter Appliance is Lit Intellifire Ignition System TroubleshootingSympton Possible Cause Corrective Action Symptom Possible Cause Corrective Action Maintaining and Servicing Appliance Maintenance TasksRecommend addition of screen if one is not present Inspect Maintenance TasksReference Materials Appliance Dimension DiagramP 4 5 4 5 E lb o w Vent Components DiagramsDVP-TRAP1 DVP-TRAPK2 DVP-TRAP2 DVP-TRAPK1 DVP-HSM-B DVP and SL Series ComponentsDVP-HRC, DVP-HRC-SS Not Approved for ALL Units Service Parts List Log Set AssemblyAt Depot StockedIntermittent Pilot Ignition Limited Lifetime Warranty Heat & GLO GAS Appliance Products Limited Lifetime WarrantyDo not Discard this Manual Contact Information