Heat & Glo LifeStyle 704-902 owner manual Option C Southwestern kiva-style

Page 34

Note: Previous numbers are for combustible construction numbers. Arch may protrude up to 5-1/2 inches maximum as measured from unit front face.

Note: The kiva-style arch depth may be any size if using noncombustible materials i.e. concrete, steel, plaster, etc.

A template is provided on unit shipping carton. Simply cut along the line and use as a template when constructing kiva-style arch (see Figure 11.6).

CAUTION

Template for kiva-style arch represents MINIMUM inside dimensions. When constructing kiva-style arch, you must add thickness of finishing materials to achieve proper size of finished arch.

BACKING

MATERIAL

KIVA-STYLE ARCH

STRUCTURE

FINISHING

MATERIAL

Figure 11.6

Inside of the kiva-style arch can be finished using com- bustible materials. For example, thin drywall may be layered to form around curved arch.

OPTION C: SOUTHWESTERN kiva-style

The third installation option illustrated is a corner-installa- tion with custom finishing. This option requires advanced finishing methods involving either combustible or non-com- bustible construction materials (see Figure 11.7).

Figure 11.7

A template is provided on the unit shipping carton. Simply cut along the line and use as a template for construction purposes.

The cardboard template provided represents MINIMUM inside dimensions of the finished wall surface.

If finishing with plaster or drywall, a finish edge trim is provided around door front on unit. Finishing materials MUST not extend inside of the finish edge trim.

CAUTION

Finishing materials cut inside the provided template or inside finish edge trim will cause the door not to fit.

WARNING

Fire Risk.

Follow minimum specified clearances found in Section 16, (Appliance Dimensions Diagram) and on fireplace exterior if using combustible framing materials.

34

Heat & Glo • Bravo • 704-902 Rev. E • 7/08

Image 34
Contents Model Bravo What to do if you smell gasCongratulations Homeowner Reference InformationTable of Contents Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsGetting Started Installation to ensure maximum safety and benefitTools and Supplies Needed Framing and Clearances Selecting Appliance LocationClearances Constructing the Appliance ChaseClearance to Combustibles Mantel Projections Clearances to Mantels or Combustibles above ApplianceTermination Locations Vent Termination Minimum ClearancesAlcove Applications Use of Elbows Vent Information and DiagramsVent Table Key Measuring StandardsMinimum Maximum Vent DiagramsTop Vent Horizontal Termination One Elbow V1 Minimum H1 + H2 MaximumTop Vent Horizontal Termination Three Elbows V1 + V2 Minimum H1 + H2 MaximumTop Vent Vertical Termination No Elbow V1 = 46 ft. Max .0 m Flue OutletV1 Minimum H1 Maximum Top Vent Vertical Termination H1 + H2Wall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Combustible Wall PenetrationInstalling Attic Shield Installing the Ceiling FirestopVertical Penetration Framing Appliance Preparation Securing and Leveling the ApplianceAttaching Vent to the Firebox Assembly Installing Vent PipeAssembly of Vent Sections DVP Pipe Assembling Pipe SectionsAssembling Minimum Installations MI Sections Assembling DVP-12A Slip SectionsSecuring the Vent Sections Vertical Sections Disassembly of Vent SectionsHorizontal Sections Installing the Horizontal Termination Cap Installing Heat Shield and Horizontal Termination CapHeat Shield Requirements for Horizontal Termination Installing Roof Flashing and Vertical Ter- mination Cap 13 Minimum Height from Roof to LowestAssembling and Installing Storm Collar 17 Assembling the Storm Collar Around the PipeFuel Conversions Gas Connection Gas InformationGas Pressures High Altitude Installations Intellifire Ignition System Wiring Recommendation for WireConnecting to the Appliance Wall Switch RequiredLOW Voltage See Note Junction Box Installation GRN wire Ground attached To GRN screw with Inside boxFinishing Facing MaterialOption a Flush Wall Finish Finishing StylesOption B Kiva-style Arch Option C Southwestern kiva-style Flush wall installation with Luxor Surround Option D Flush Wall Finish with Luxor SurroundAccessories Appliance SetupClean the Appliance Lava Rock and Ember PlacementLog Assembly LOGS-BRAVO Positioning the LogsRight Grate Tine LOG #6 Removing Glass Assembly Glass AssemblyAir Shutter Settings Replacing Glass AssemblyOperating Instructions Before Lighting ApplianceLighting Appliance Intellifire IgnitionInitial Break-in Procedure Frequently Asked QuestionsAfter Appliance is Lit Intellifire Ignition System TroubleshootingSympton Possible Cause Corrective Action Symptom Possible Cause Corrective Action Maintenance Tasks Maintaining and Servicing ApplianceInspect Maintenance Tasks Recommend addition of screen if one is not presentAppliance Dimension Diagram Reference MaterialsVent Components Diagrams P 4 5 4 5 E lb o wDVP-TRAP1 DVP-TRAPK2 DVP-TRAP2 DVP-TRAPK1 DVP and SL Series Components DVP-HSM-BDVP-HRC, DVP-HRC-SS Not Approved for ALL Units Log Set Assembly Service Parts ListStocked At DepotIntermittent Pilot Ignition Limited Lifetime Warranty Limited Lifetime Warranty Heat & GLO GAS Appliance ProductsContact Information Do not Discard this Manual