B. Vent Components Diagrams (continued)

8-1/8 in.

(206 mm)

15in.

(381 mm)

13in.

(330 mm)

DVP-HRC, DVP-HRC-SS

NOT APPROVED FOR ALL UNITS.

Effective Length 5-3/4 to 8-3/8 in. 146 to 213 mm

 

5-1/2 in.

 

8-3/8 in.

 

140 mm

 

213 mm

 

 

 

 

 

 

 

 

 

87°

 

 

 

 

 

10-1/2 in.

267 mm

10-7/8 in.

276 mm

DVP-HRC-ZC, DVP-HRC-ZC-SS

NOT APPROVED FOR ALL UNITS.

Figure 16. 5 DVP Vent Components

52

Heat & Glo • Bravo • 704-902 Rev. E • 7/08

Image 52
Contents Model Bravo What to do if you smell gasCongratulations Homeowner Reference InformationTable of Contents Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsGetting Started Installation to ensure maximum safety and benefitTools and Supplies Needed Framing and Clearances Selecting Appliance LocationClearances Constructing the Appliance ChaseClearance to Combustibles Mantel Projections Clearances to Mantels or Combustibles above ApplianceTermination Locations Vent Termination Minimum ClearancesAlcove Applications Vent Information and Diagrams Vent Table KeyUse of Elbows Measuring StandardsVent Diagrams Top Vent Horizontal Termination One ElbowMinimum Maximum V1 Minimum H1 + H2 MaximumTop Vent Horizontal Termination Three Elbows V1 + V2 Minimum H1 + H2 MaximumTop Vent Vertical Termination No Elbow V1 = 46 ft. Max .0 m Flue OutletV1 Minimum H1 Maximum Top Vent Vertical Termination H1 + H2Vent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationInstalling Attic Shield Installing the Ceiling FirestopVertical Penetration Framing Appliance Preparation Securing and Leveling the ApplianceInstalling Vent Pipe Assembly of Vent Sections DVP PipeAttaching Vent to the Firebox Assembly Assembling Pipe SectionsAssembling Minimum Installations MI Sections Assembling DVP-12A Slip SectionsSecuring the Vent Sections Vertical Sections Disassembly of Vent SectionsHorizontal Sections Installing the Horizontal Termination Cap Installing Heat Shield and Horizontal Termination CapHeat Shield Requirements for Horizontal Termination Installing Roof Flashing and Vertical Ter- mination Cap 13 Minimum Height from Roof to LowestAssembling and Installing Storm Collar 17 Assembling the Storm Collar Around the PipeFuel Conversions Gas Connection Gas InformationGas Pressures High Altitude Installations Recommendation for Wire Connecting to the ApplianceIntellifire Ignition System Wiring Wall Switch RequiredLOW Voltage See Note Junction Box Installation GRN wire Ground attached To GRN screw with Inside boxFinishing Facing MaterialOption a Flush Wall Finish Finishing StylesOption B Kiva-style Arch Option C Southwestern kiva-style Flush wall installation with Luxor Surround Option D Flush Wall Finish with Luxor SurroundAppliance Setup Clean the ApplianceAccessories Lava Rock and Ember PlacementLog Assembly LOGS-BRAVO Positioning the LogsRight Grate Tine LOG #6 Glass Assembly Air Shutter SettingsRemoving Glass Assembly Replacing Glass AssemblyOperating Instructions Before Lighting ApplianceLighting Appliance Intellifire IgnitionInitial Break-in Procedure Frequently Asked QuestionsAfter Appliance is Lit Intellifire Ignition System TroubleshootingSympton Possible Cause Corrective Action Symptom Possible Cause Corrective Action Maintenance Tasks Maintaining and Servicing ApplianceInspect Maintenance Tasks Recommend addition of screen if one is not presentAppliance Dimension Diagram Reference Materials Vent Components Diagrams P 4 5 4 5 E lb o wDVP-TRAP1 DVP-TRAPK2 DVP-TRAP2 DVP-TRAPK1 DVP and SL Series Components DVP-HSM-BDVP-HRC, DVP-HRC-SS Not Approved for ALL Units Log Set Assembly Service Parts ListStocked At DepotIntermittent Pilot Ignition Limited Lifetime Warranty Limited Lifetime Warranty Heat & GLO GAS Appliance ProductsContact Information Do not Discard this Manual