Hearth and Home Technologies Cinch Pipe & Termination Cap System installation instructions

Page 1

TM

Installation Instructions

Models:

Cinch Pipe & Termination Cap System

These instructions are replacing VP (for Heatilator) and DV (for Heat-N-Glo) pipe assembly instructions. See the appliance installation instructions for configuration of vent assembly and clearances to pipe.

If you need assistance during installation, contact your local dealer or the Technical Serices Dept., Hearth & Home Technologies Inc., phone 1-800-927-6841 or 1-888-427-3973.

If DVP-AD adapters are used off the top of the appliance, the termination height will be raised by 2-3/4 in. overall height.

CAUTION

Sharp Edges

Wear protective gloves and safety glasses during installation.

WARNING

Hearth & Home Technologies disclaims any responsibility for, and the warranty will be voided by, the following actions:

Installation and use of any damaged vent system component.

Modifi catoin of the vent system.

Installation other than as instructed by Hearth & Home Technologies.

Installation and/or use of any component part not approved by Hearth & Home Technologies.

Any such action may cause a fire hazard.

WARNING

Do not mix pipe, fittings or joining methods from different manufacturers.

Note: An arrow (￿) found in the text signifi es change in content.

Hearth & Home Technologies Inc. • Cinch Pipe & Term Caps • 4033-900 Rev K • 05/05

1

Image 1 Contents
Any such action may cause a fire hazard Installation InstructionsNot shown Parts and DescriptionsCool ADD Trap CAP Specification Chart Penetrating a Wall Clearances for the Vent SectionsTop Vented Direct Vent Appliances Rear Vented Direct Vent AppliancesAssemble Vent Sections Attaching Vent to the Firebox AssemblyAssemble Pipe Sections Fire Risk Exhaust Fumes RiskAssemble Slip Sections Assemble Minimum Installation MI SectionsSecure the Vent Sections Disassemble Vent SectionsFire Risk Explosion Risk Asphyxiation Risk Install the Horizontal Termination Cap Install the Heat Shield and Horizontal Termination CapBurn Risk Heat Shield Requirements for Horizontal TerminationInstall Attic Insulation Shield Install the Firestop SpacerVertical Penetration Framing Fire Risk20 Secure with Screws Roof Pitch Min. Ft Install Roof Flashing and Vertical Termination CapCaulk around the top of the storm collar Assemble and Install Storm Collar