Hearth and Home Technologies GDST3831I Mantel and Wall Projections, TOP View Fireplace Opening

Page 20

D. Mantel and Wall Projections

WARNING! Risk of Fire! Comply with all minimum clear- ances as specified. Framing or finishing material closer than the minimums listed must be constructed entirely of noncom- bustible materials (i.e., steel studs, concrete board, etc).

Note: All

 

measurements

 

in inches.

CEILING

 

MAX.

 

12

 

11

TOP VIEW

FIREPLACE

3-1/4 in.

OPENING

 

Min.

 

 

Note: Clearance from opening to perpendicular wall.

1/2 in. Min.

Unlimited

 

 

10

 

 

 

 

 

 

 

8

9

 

 

 

 

 

 

7

 

 

 

 

 

 

32

 

 

 

 

 

 

 

6

 

 

 

 

 

 

 

 

5

 

 

 

 

 

 

12 13

MIN.

4

 

 

 

 

 

10 11

 

3

 

6

7

8

9

 

 

4

5

 

 

 

 

 

 

 

 

 

 

 

 

 

TOP OF HOOD OR FIREPLACE OPENING

Figure 5.3 Minimum Vertical and Maximum Horizontal

 

Dimensions of Combustibles

 

 

 

Note: All

 

 

 

 

 

 

 

 

measurements

 

 

 

 

CEILING

 

 

in inches.

 

 

 

 

 

 

MAX.

 

 

 

 

 

 

 

 

 

 

 

 

 

18

 

 

 

 

 

 

12

 

 

 

 

 

 

 

11

 

 

 

 

 

 

 

10

 

 

 

32

 

 

 

 

9

 

 

 

 

 

 

 

 

 

 

 

MIN.

 

 

8

 

 

 

 

14

 

 

 

 

 

 

 

 

 

 

 

 

 

8

 

 

7

 

 

 

6

7

 

 

6

 

4

5

 

 

 

 

5

 

 

 

3

 

 

 

 

 

2

 

 

 

4

 

 

1

 

 

 

 

 

 

 

 

 

 

 

TOP OF HOOD OR FIREPLACE OPENING

Figure 5.4 Minimum Vertical and Maximum Horizontal

Dimensions of Non-Combustibles

Figure 5.5 Combustible Mantel Leg or Wall Projections (Acceptable on both sides of opening)

SHEETROCK

3.5 in.

AIR SPACE REQUIRED

Figure 5.6 Non-Combustible Zone

20

Heatilator • GDST3831I • 2127-900 Rev. F • 10/08

Image 20
Contents Models What to do if you smell gasDo Discardnot HOT SurfacesXxxxxxxx CongratulationsHomeowner Reference Information Table of Contents User GuideAppliance Setup TroubleshootingElectrical Information FinishingCONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsYour Fireplace Gas Fireplace SafetyOperating Instructions User Guide Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesFan Kit optional Clear SpaceLighting Instructions IPI Final inspection byDo not Connect 110 VAC to the Control Valve What to do if YOU Smell GASAfter Fireplace is Lit Frequently Asked QuestionsIssue Solutions Maintenance and Service Maintenance Tasks-HomeownerGlass Cleaning Remote ControlMaintenance Tasks-Qualified Service Technician Gasket Seal and Glass Assembly InspectionVenting LogsBurner Ignition and Operation IPI Pilot Flame PatternsGetting Started Typical Appliance SystemInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Framing and Clearances Selecting Appliance LocationClearances Minimum Framing DimensionsConstructing the Appliance Chase Mantel and Wall Projections TOP View Fireplace OpeningTermination Locations Vent Termination Minimum ClearancesCovered Alcove Applications Install Support Brackets To Install the Heat ShieldContinue Adding Vent Components CorrectVent Information and Diagrams Approved PipeVent Table Key Use of ElbowsUse of Flex Vent V1 Minimum H1 Maximum Vent DiagramsTop Vent Horizontal Termination One Elbow Top Vent Horizontal Termination Two Elbows V1 Minimum H1 + H2 MaximumTop Vent Horizontal Termination Three Elbows V1 Minimum H1 + H2 Maximum V1 + V2 MinExhaust restrictor Instructions Two Elbows Three Elbows Minimum Maximum + V 2 MinVent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationInstall the Ceiling Firestop Pipe SLPVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Appliance Preparation Securing and Leveling the ApplianceInstalling Vent Pipe Assemble Vent SectionsAssemble Slip Sections Securing the Vent SectionsInstalling Decorative Ceiling Components Disassemble Vent SectionsInstalling Metal Roof Flashing Assemble and Install Storm CollarInstall RF4-8 Apply Sealant TOP & Partial SidesHeat Shield Requirements for Horizontal Termination Installing Vertical Termination CapInstalling Decorative Wall Components Install Horizontal Termination Cap 22 Venting through the wallGas Information Fuel ConversionGas Pressure Gas ConnectionWiring Requirements Optional Accessories RequirementsElectrical Information Code CSA C22.1Intellifire Ignition Wiring Diagram with Remote Receiver Junction Box Installation Wall Switch Installation for Fan OptionalFinishing To install the Splatter Guard Splatter GuardTo Close the Lower Access Panel To Remove the Splatter GuardAppliance Setup Pilot Install the Log AssemblyModels ST-550T-IPI. GDST3831I Notch Air Shutter Settings Install Trim Kits and SurroundsAir Shutter Setting Intellifire Ignition System TroubleshootingSymptom Possible Cause Corrective Action Remove any contaminants that may have accumulated on Reference Materials Appliance Dimension DiagramElectrical Access Left View Front View GAS Line Right View Vent Components Diagrams Assembly SLP-DCF-BK SLK-SNKD SLP-CCS-BK SLP-TVHWSLP-TRAP1 SLP-TRAP2 DVP-2SL SLP-WT-BK SL-2DVPSLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP DVP-TB1 Horizontal Termination CAPLog Set Assembly Service PartsService Parts List StockedAt Depot Description Comments Part NumberIntermittent Pilot Ignition Valve Assembly Contact Information