A. Pipe Clearances to Combustibles

WARNING! Risk of Fire! Maintain air space clearance to vent. DO NOT pack insulation or other combustibles:

Between ceiling firestops

Between wall shield firestops

Around vent system

Failure to keep insulation or other material away from vent pipe may cause over heating and fire.

Note: Heat shields MUST overlap by a minimum of 1-1/2 in. (38 mm).

SLP heat shield - designed to be used on a wall 4-3/8 in. to 7-5/8 in. (111 mm to 194 mm thick).

If wall thickness is less than 4-3/8 the existing heat shields must be field trimmed. If wall thickness is greater than 7-5/8 in. a DVP- HSM-B will be required.

Heat

2-1/2 in. (64 mm)Shields top clearance at

wall shield firestops

3 in. (76 mm) top clearance

B. Wall Penetration Framing

Combustible Wall Penetration

Whenever a combustible wall is penetrated, you must frame a hole for the wall shield firestop. The wall shield firestop maintains minimum clearances and prevents cold air infiltration.

The opening must be framed on all four sides using the same size framing materials as those used in the wall construction.

SLP pipe - A wall shield firestop must be placed on each side of an interior wall. A minimum 1-1/2 in. (38 mm) overlap of attached heat shields must be maintained.

See Section 10.L. for information for regarding the in- stallation of a horizontal termination cap.

Non-Combustible Wall Penetration

If the hole being penetrated is surrounded by noncom- bustible materials such as concrete, a hole with diameter one in. greater than the pipe is acceptable.

Whenever a non-combustible wall is penetrated, the wall shield firestop is only required on one side and no heat

1 in. (25 mm) clearance around vertical sections

Wall

Shield

Firestop

1 in. (25 mm) clearance bottom and sides

1/2 in. (13 mm) bottom clearance at wall shield firestops

WALL

shield is necessary.

10 in. 10 in.

Figure 6.1 Horizontal venting clearances to combustible materials

B

A*

A*

B

38-7/8 in.

37-7/8 in.

*Shows center of vent framing hole for top venting. The center of the hole is one (1) inch (25.4 mm) above the center of the horizontal vent pipe.

Figure 8.2 Wall Penetration

Heatilator • GDST3831I • 2127-900 Rev. F • 10/08

31

Image 31
Contents HOT Surfaces ModelsWhat to do if you smell gas Do DiscardnotHomeowner Reference Information CongratulationsXxxxxxxx User Guide Table of ContentsFinishing Appliance SetupTroubleshooting Electrical InformationCONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsOperating Instructions User Guide Gas Fireplace SafetyYour Fireplace Clear Space Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Fan Kit optionalWhat to do if YOU Smell GAS Lighting Instructions IPIFinal inspection by Do not Connect 110 VAC to the Control ValveIssue Solutions Frequently Asked QuestionsAfter Fireplace is Lit Remote Control Maintenance and ServiceMaintenance Tasks-Homeowner Glass CleaningLogs Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection VentingIPI Pilot Flame Patterns Burner Ignition and OperationTypical Appliance System Getting StartedTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Selecting Appliance Location Framing and ClearancesConstructing the Appliance Chase Minimum Framing DimensionsClearances TOP View Fireplace Opening Mantel and Wall ProjectionsVent Termination Minimum Clearances Termination LocationsCovered Alcove Applications Correct Install Support BracketsTo Install the Heat Shield Continue Adding Vent ComponentsUse of Elbows Vent Information and DiagramsApproved Pipe Vent Table KeyUse of Flex Vent Top Vent Horizontal Termination One Elbow Vent DiagramsV1 Minimum H1 Maximum V1 Minimum H1 + H2 Maximum Top Vent Horizontal Termination Two ElbowsV1 Minimum H1 + H2 Maximum V1 + V2 Min Top Vent Horizontal Termination Three ElbowsExhaust restrictor Instructions Minimum Maximum + V 2 Min Two Elbows Three ElbowsCombustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingPipe SLP Install the Ceiling FirestopFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Securing and Leveling the Appliance Appliance PreparationAssemble Vent Sections Installing Vent PipeSecuring the Vent Sections Assemble Slip SectionsDisassemble Vent Sections Installing Decorative Ceiling ComponentsAssemble and Install Storm Collar Installing Metal Roof FlashingApply Sealant TOP & Partial Sides Install RF4-8Installing Decorative Wall Components Installing Vertical Termination CapHeat Shield Requirements for Horizontal Termination 22 Venting through the wall Install Horizontal Termination CapGas Connection Gas InformationFuel Conversion Gas PressureCode CSA C22.1 Wiring RequirementsOptional Accessories Requirements Electrical InformationIntellifire Ignition Wiring Diagram with Remote Receiver Wall Switch Installation for Fan Optional Junction Box InstallationFinishing Splatter Guard To install the Splatter GuardTo Remove the Splatter Guard To Close the Lower Access PanelAppliance Setup Models ST-550T-IPI. GDST3831I Install the Log AssemblyPilot Notch Air Shutter Setting Install Trim Kits and SurroundsAir Shutter Settings Symptom Possible Cause Corrective Action TroubleshootingIntellifire Ignition System Remove any contaminants that may have accumulated on Electrical Access Left View Front View GAS Line Right View Appliance Dimension DiagramReference Materials Vent Components Diagrams DVP-2SL SLP-WT-BK SL-2DVP AssemblySLP-DCF-BK SLK-SNKD SLP-CCS-BK SLP-TVHW SLP-TRAP1 SLP-TRAP2DVP-TB1 Horizontal Termination CAP SLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAPService Parts Log Set AssemblyDescription Comments Part Number Service Parts ListStocked At DepotIntermittent Pilot Ignition Valve Assembly Contact Information