Hearth and Home Technologies GDST3831I SLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP

Page 58

WARNING

Fire Risk.

When using SLP-HRC-SS and SLP-HRC-ZC- SS termination caps on top vented fireplaces, a one foot minimum vertical vent section is

required before installing first elbow.

When using DVP-TB1 termination cap on top vented fireplaces, a three foot minimum vertical ventsectionisrequired before installing first elbow.

15in.

(381 mm)

8-1/8 in.

(206 mm)

13 in.

Effective Length

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(330 mm)

 

 

5-1/2 in.

 

8-3/8 in.

5-3/4 to 8-3/8 in.

 

 

 

 

 

 

 

 

146 to 213 mm

 

 

140 mm

 

213 mm

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

87°

 

 

 

 

 

 

 

 

 

 

SLP-HRC-SS

SLP-HRC-ZC-SS

HORIZONTAL TERMINATION CAP

10-1/2 in.

267 mm

10-7/8 in.

276 mm

DVP-TB1

SLP90 SL-2DVP

ASSEMBLY

DVP-TB1

DVP-TB1

HORIZONTAL TERMINATION CAP

Figure 16.4 SLP Series Vent Components

58

Heatilator • GDST3831I • 2127-900 Rev. F • 10/08

Image 58
Contents Do Discardnot ModelsWhat to do if you smell gas HOT SurfacesHomeowner Reference Information CongratulationsXxxxxxxx Table of Contents User GuideElectrical Information Appliance SetupTroubleshooting FinishingCONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsOperating Instructions User Guide Gas Fireplace SafetyYour Fireplace Fan Kit optional Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Clear SpaceDo not Connect 110 VAC to the Control Valve Lighting Instructions IPIFinal inspection by What to do if YOU Smell GASIssue Solutions Frequently Asked QuestionsAfter Fireplace is Lit Glass Cleaning Maintenance and ServiceMaintenance Tasks-Homeowner Remote ControlVenting Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection LogsBurner Ignition and Operation IPI Pilot Flame PatternsGetting Started Typical Appliance SystemTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase Minimum Framing DimensionsClearances Mantel and Wall Projections TOP View Fireplace OpeningTermination Locations Vent Termination Minimum ClearancesCovered Alcove Applications Continue Adding Vent Components Install Support BracketsTo Install the Heat Shield CorrectVent Table Key Vent Information and DiagramsApproved Pipe Use of ElbowsUse of Flex Vent Top Vent Horizontal Termination One Elbow Vent DiagramsV1 Minimum H1 Maximum Top Vent Horizontal Termination Two Elbows V1 Minimum H1 + H2 MaximumTop Vent Horizontal Termination Three Elbows V1 Minimum H1 + H2 Maximum V1 + V2 MinExhaust restrictor Instructions Two Elbows Three Elbows Minimum Maximum + V 2 MinWall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Combustible Wall PenetrationInstall the Ceiling Firestop Pipe SLPFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Appliance Preparation Securing and Leveling the ApplianceInstalling Vent Pipe Assemble Vent SectionsAssemble Slip Sections Securing the Vent SectionsInstalling Decorative Ceiling Components Disassemble Vent SectionsInstalling Metal Roof Flashing Assemble and Install Storm CollarInstall RF4-8 Apply Sealant TOP & Partial SidesInstalling Decorative Wall Components Installing Vertical Termination CapHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap 22 Venting through the wallGas Pressure Gas InformationFuel Conversion Gas ConnectionElectrical Information Wiring RequirementsOptional Accessories Requirements Code CSA C22.1Intellifire Ignition Wiring Diagram with Remote Receiver Junction Box Installation Wall Switch Installation for Fan OptionalFinishing To install the Splatter Guard Splatter GuardTo Close the Lower Access Panel To Remove the Splatter GuardAppliance Setup Models ST-550T-IPI. GDST3831I Install the Log AssemblyPilot Notch Air Shutter Setting Install Trim Kits and SurroundsAir Shutter Settings Symptom Possible Cause Corrective Action TroubleshootingIntellifire Ignition System Remove any contaminants that may have accumulated on Electrical Access Left View Front View GAS Line Right View Appliance Dimension DiagramReference Materials Vent Components Diagrams SLP-TRAP1 SLP-TRAP2 AssemblySLP-DCF-BK SLK-SNKD SLP-CCS-BK SLP-TVHW DVP-2SL SLP-WT-BK SL-2DVPSLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP DVP-TB1 Horizontal Termination CAPLog Set Assembly Service PartsAt Depot Service Parts ListStocked Description Comments Part NumberIntermittent Pilot Ignition Valve Assembly Contact Information