I. Installing Vertical Termination Cap

Attach the vertical termination cap by sliding the inner collar of the cap into the inner flue of the pipe section while placing the outer collar of the cap over the outer flue of the pipe section.

Secure the cap by driving three self-tapping screws (supplied) through the pilot holes in the outer collar of the cap into the outer flue of the pipe (see Figure 10.20).

TERMINATION CAP

(1 of 3)

STORM

COLLAR

SCREWS

CAULK

Figure 10.20

J. Installing Decorative Wall Components

A decorative wall thimble can be installed on wall through which the vent passes. The decorative wall thimble is used to cover the firestop.

Slide the decorative wall thimble over the last section of horizontal pipe before connecting the termination cap to the pipe.

Once the pipe section and the termination cap have been connected, slide the wall thimble up to the interior wall surface and attach with screws provided. See Figure 10.21.

K.Heat Shield Requirements for Horizontal Termination

WARNING! Risk of Fire! To prevent overheating and fire, heat shields must extend through the entire wall thick- ness.

DO NOT remove the heat shields attached to the wall shield firestop and the horizontal termination cap (shown in Figure 10.22).

Heat shields must overlap 1-1/2 in. (38 mm) mini- mum.

There are two sections of the heat shield. One section is factory-attached to the wall shield firestop. The other section is factory-attached to the cap. See Figure 8.22.

If the wall thickness does not allow the required 1-1/2 in. (38 mm) heat shield overlap when installed, an extended heat shield must be used.

If the wall thickness is less than 4 in./102 mm (DVP) or 4-3/8 in./ 111 mm (SLP), the heat shields on the cap and wall shield firestop must to be trimmed. A minimum 1-1/2 in. (38 mm) overlap MUST be maintained.

Use an extended heat shield if the finished wall thickness is greater than 7-1/4 in. (184 mm).

The extended heat shield may need to be cut to length maintaining sufficient length for a 1-1/2 in. (38 mm) overlap between heat shields.

Attach the extended heat shield to either of the existing heat shields using the screws supplied with the extended heat shield. Refer to vent components diagrams in the back of this manual.

Rest the small leg on the extended heat shield on top of the pipe section to properly space it from the pipe section.

Important Notice: Heat shields may not be field constructed.

Figure 10.21 Wall Thimble

40

Heatilator • GDST3831I • 2127-900 Rev. F • 10/08

Image 40
Contents Models What to do if you smell gasDo Discardnot HOT SurfacesHomeowner Reference Information CongratulationsXxxxxxxx Table of Contents User GuideAppliance Setup TroubleshootingElectrical Information FinishingCONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsOperating Instructions User Guide Gas Fireplace SafetyYour Fireplace Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesFan Kit optional Clear SpaceLighting Instructions IPI Final inspection byDo not Connect 110 VAC to the Control Valve What to do if YOU Smell GASIssue Solutions Frequently Asked QuestionsAfter Fireplace is Lit Maintenance and Service Maintenance Tasks-HomeownerGlass Cleaning Remote ControlMaintenance Tasks-Qualified Service Technician Gasket Seal and Glass Assembly InspectionVenting LogsBurner Ignition and Operation IPI Pilot Flame PatternsGetting Started Typical Appliance SystemTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase Minimum Framing DimensionsClearances Mantel and Wall Projections TOP View Fireplace OpeningTermination Locations Vent Termination Minimum ClearancesCovered Alcove Applications Install Support Brackets To Install the Heat ShieldContinue Adding Vent Components CorrectVent Information and Diagrams Approved PipeVent Table Key Use of ElbowsUse of Flex Vent Top Vent Horizontal Termination One Elbow Vent DiagramsV1 Minimum H1 Maximum Top Vent Horizontal Termination Two Elbows V1 Minimum H1 + H2 MaximumTop Vent Horizontal Termination Three Elbows V1 Minimum H1 + H2 Maximum V1 + V2 MinExhaust restrictor Instructions Two Elbows Three Elbows Minimum Maximum + V 2 MinVent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationInstall the Ceiling Firestop Pipe SLPFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Appliance Preparation Securing and Leveling the ApplianceInstalling Vent Pipe Assemble Vent SectionsAssemble Slip Sections Securing the Vent SectionsInstalling Decorative Ceiling Components Disassemble Vent SectionsInstalling Metal Roof Flashing Assemble and Install Storm CollarInstall RF4-8 Apply Sealant TOP & Partial SidesInstalling Decorative Wall Components Installing Vertical Termination CapHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap 22 Venting through the wallGas Information Fuel ConversionGas Pressure Gas ConnectionWiring Requirements Optional Accessories RequirementsElectrical Information Code CSA C22.1Intellifire Ignition Wiring Diagram with Remote Receiver Junction Box Installation Wall Switch Installation for Fan OptionalFinishing To install the Splatter Guard Splatter GuardTo Close the Lower Access Panel To Remove the Splatter GuardAppliance Setup Models ST-550T-IPI. GDST3831I Install the Log AssemblyPilot Notch Air Shutter Setting Install Trim Kits and SurroundsAir Shutter Settings Symptom Possible Cause Corrective Action TroubleshootingIntellifire Ignition System Remove any contaminants that may have accumulated on Electrical Access Left View Front View GAS Line Right View Appliance Dimension DiagramReference Materials Vent Components Diagrams Assembly SLP-DCF-BK SLK-SNKD SLP-CCS-BK SLP-TVHWSLP-TRAP1 SLP-TRAP2 DVP-2SL SLP-WT-BK SL-2DVPSLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP DVP-TB1 Horizontal Termination CAPLog Set Assembly Service PartsService Parts List StockedAt Depot Description Comments Part NumberIntermittent Pilot Ignition Valve Assembly Contact Information