Hearth and Home Technologies GDST3831I owner manual Notch

Page 51

3

NOTCH

STEP 4. Log #3 (SRV2126-702):Place Log #3 (1 of 2 identical logs) as shown in Figure 7. Align the “Y” of Log #3 with the cutout on Log #2. Rest the bottom of Log #3 in the notch on the ledge on the back side of the basepan.

3

1

3

NOTCH

2

 

STEP 5. Log #3 (SRV2126-702):Place the remaining Log #3 (2 of 2 identical logs) into the fireplace so that the bot- tom of the log rests in the notch on the ledge on the front side of the basepan. Then place the top of Log #3 on top of Log #1 so that the flat spot is hidden. The complete log set assembly is shown in Figure 11. See the fireplace Owner’s Manual for instructions on how to place the Mystic Embers and Mineral Wool.

Heatilator • GDST3831I • 2127-900 Rev. F • 10/08

51

Image 51
Contents HOT Surfaces ModelsWhat to do if you smell gas Do DiscardnotCongratulations Homeowner Reference InformationXxxxxxxx User Guide Table of ContentsFinishing Appliance SetupTroubleshooting Electrical InformationCONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsGas Fireplace Safety Operating Instructions User GuideYour Fireplace Clear Space Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Fan Kit optionalWhat to do if YOU Smell GAS Lighting Instructions IPIFinal inspection by Do not Connect 110 VAC to the Control ValveFrequently Asked Questions Issue SolutionsAfter Fireplace is Lit Remote Control Maintenance and ServiceMaintenance Tasks-Homeowner Glass CleaningLogs Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection VentingIPI Pilot Flame Patterns Burner Ignition and OperationTypical Appliance System Getting StartedDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Selecting Appliance Location Framing and ClearancesMinimum Framing Dimensions Constructing the Appliance ChaseClearances TOP View Fireplace Opening Mantel and Wall ProjectionsVent Termination Minimum Clearances Termination LocationsCovered Alcove Applications Correct Install Support BracketsTo Install the Heat Shield Continue Adding Vent ComponentsUse of Elbows Vent Information and DiagramsApproved Pipe Vent Table KeyUse of Flex Vent Vent Diagrams Top Vent Horizontal Termination One ElbowV1 Minimum H1 Maximum V1 Minimum H1 + H2 Maximum Top Vent Horizontal Termination Two ElbowsV1 Minimum H1 + H2 Maximum V1 + V2 Min Top Vent Horizontal Termination Three ElbowsExhaust restrictor Instructions Minimum Maximum + V 2 Min Two Elbows Three ElbowsCombustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingPipe SLP Install the Ceiling FirestopInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Securing and Leveling the Appliance Appliance PreparationAssemble Vent Sections Installing Vent PipeSecuring the Vent Sections Assemble Slip SectionsDisassemble Vent Sections Installing Decorative Ceiling ComponentsAssemble and Install Storm Collar Installing Metal Roof FlashingApply Sealant TOP & Partial Sides Install RF4-8Installing Vertical Termination Cap Installing Decorative Wall ComponentsHeat Shield Requirements for Horizontal Termination 22 Venting through the wall Install Horizontal Termination CapGas Connection Gas InformationFuel Conversion Gas PressureCode CSA C22.1 Wiring RequirementsOptional Accessories Requirements Electrical InformationIntellifire Ignition Wiring Diagram with Remote Receiver Wall Switch Installation for Fan Optional Junction Box InstallationFinishing Splatter Guard To install the Splatter GuardTo Remove the Splatter Guard To Close the Lower Access PanelAppliance Setup Install the Log Assembly Models ST-550T-IPI. GDST3831IPilot Notch Install Trim Kits and Surrounds Air Shutter SettingAir Shutter Settings Troubleshooting Symptom Possible Cause Corrective ActionIntellifire Ignition System Remove any contaminants that may have accumulated on Appliance Dimension Diagram Electrical Access Left View Front View GAS Line Right ViewReference Materials Vent Components Diagrams DVP-2SL SLP-WT-BK SL-2DVP AssemblySLP-DCF-BK SLK-SNKD SLP-CCS-BK SLP-TVHW SLP-TRAP1 SLP-TRAP2DVP-TB1 Horizontal Termination CAP SLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAPService Parts Log Set AssemblyDescription Comments Part Number Service Parts ListStocked At DepotIntermittent Pilot Ignition Valve Assembly Contact Information