Hearth and Home Technologies GDST3831I owner manual Top Vent Horizontal Termination Two Elbows

Page 27

1. Top Vent - Horizontal Termination - (continued)

Two Elbows

WARNING**

Fire Risk.

When using SLP-HRC-SS and SLP-HRC-ZC-SS termination caps on top vented fireplaces, a one foot minimum vertical vent section is required before

installing first elbow.

When using DVP-TB1 termination cap on top vented fireplaces, a three foot minimum vertical vent section is required before installing first elbow.

When using any other cap, a section of vertical pipe (12 inches minimum) MUST be installed prior to attaching a 90° elbow.

Note: There MUST be a 25% reduction in total H when using flex vent except when using the simple up and out installation (see Figure 7.3).

V1 Minimum**

H1 + H2 Maximum

90 Elbow**

1/2 ft.

152 mm

 

 

 

 

1/2 ft.**

152 mm

1 ft.

305 mm

 

 

 

 

1-1/2 ft.**

457 mm

2 ft.

610 mm

2-1/2 ft.**

762 mm

4 ft.

1.2 m

3-1/2 ft.

1.1 m

6 ft.

1.8 m

 

 

 

 

4-1/2 ft.

1.4 m

14 ft.

4.3 m

 

 

 

 

H1 + H2 Max. =14 ft. (4.3 m)

V1 + H1 + H2 Max. = 40 ft. (12.2 m)

See Warning**

V1

H2

H1

 

INSTALLED

HORIZONTALLY

Figure 7.5

Heatilator • GDST3831I • 2127-900 Rev. F • 10/08

27

Image 27
Contents HOT Surfaces ModelsWhat to do if you smell gas Do DiscardnotCongratulations Homeowner Reference InformationXxxxxxxx User Guide Table of ContentsFinishing Appliance SetupTroubleshooting Electrical InformationCONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsGas Fireplace Safety Operating Instructions User GuideYour Fireplace Clear Space Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Fan Kit optionalWhat to do if YOU Smell GAS Lighting Instructions IPIFinal inspection by Do not Connect 110 VAC to the Control ValveFrequently Asked Questions Issue SolutionsAfter Fireplace is Lit Remote Control Maintenance and ServiceMaintenance Tasks-Homeowner Glass CleaningLogs Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection VentingIPI Pilot Flame Patterns Burner Ignition and OperationTypical Appliance System Getting StartedDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Selecting Appliance Location Framing and ClearancesMinimum Framing Dimensions Constructing the Appliance ChaseClearances TOP View Fireplace Opening Mantel and Wall ProjectionsVent Termination Minimum Clearances Termination LocationsCovered Alcove Applications Correct Install Support BracketsTo Install the Heat Shield Continue Adding Vent ComponentsUse of Elbows Vent Information and DiagramsApproved Pipe Vent Table KeyUse of Flex Vent Vent Diagrams Top Vent Horizontal Termination One ElbowV1 Minimum H1 Maximum V1 Minimum H1 + H2 Maximum Top Vent Horizontal Termination Two ElbowsV1 Minimum H1 + H2 Maximum V1 + V2 Min Top Vent Horizontal Termination Three ElbowsExhaust restrictor Instructions Minimum Maximum + V 2 Min Two Elbows Three ElbowsCombustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingPipe SLP Install the Ceiling FirestopInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Securing and Leveling the Appliance Appliance PreparationAssemble Vent Sections Installing Vent PipeSecuring the Vent Sections Assemble Slip SectionsDisassemble Vent Sections Installing Decorative Ceiling ComponentsAssemble and Install Storm Collar Installing Metal Roof FlashingApply Sealant TOP & Partial Sides Install RF4-8Installing Vertical Termination Cap Installing Decorative Wall ComponentsHeat Shield Requirements for Horizontal Termination 22 Venting through the wall Install Horizontal Termination CapGas Connection Gas InformationFuel Conversion Gas PressureCode CSA C22.1 Wiring RequirementsOptional Accessories Requirements Electrical InformationIntellifire Ignition Wiring Diagram with Remote Receiver Wall Switch Installation for Fan Optional Junction Box InstallationFinishing Splatter Guard To install the Splatter GuardTo Remove the Splatter Guard To Close the Lower Access PanelAppliance Setup Install the Log Assembly Models ST-550T-IPI. GDST3831IPilot Notch Install Trim Kits and Surrounds Air Shutter SettingAir Shutter Settings Troubleshooting Symptom Possible Cause Corrective ActionIntellifire Ignition System Remove any contaminants that may have accumulated on Appliance Dimension Diagram Electrical Access Left View Front View GAS Line Right ViewReference Materials Vent Components Diagrams DVP-2SL SLP-WT-BK SL-2DVP AssemblySLP-DCF-BK SLK-SNKD SLP-CCS-BK SLP-TVHW SLP-TRAP1 SLP-TRAP2DVP-TB1 Horizontal Termination CAP SLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAPService Parts Log Set AssemblyDescription Comments Part Number Service Parts ListStocked At DepotIntermittent Pilot Ignition Valve Assembly Contact Information