Hearth and Home Technologies Soho24B owner manual Top Vent Horizontal Termination Three Elbows

Page 13

1. Top Vent - Horizontal Termination - (continued)

Three Elbows

V1 Min.

 

H1 Max.

V2 Min.

H2 Max.

Elbow only

2 ft.

 

610 mm

*

= V2

1 ft.

304 mm

2 ft.

 

610 mm

*

= V2

1-1/2 ft.

457 mm

3 ft.

 

914 mm

*

= V2

2-1/2 ft.

762 mm

5 ft.

 

1.5 m

*

= V2

3-1/2 ft.

1.1 m

7 ft.

 

2.1 m

*

= V2

4-1/2 ft.

1.4 m

15 ft.

 

4.6 m

*

= 0

 

 

 

 

 

 

 

*When using V2 , H2 Max = V2. If V2 = 0, then H2 Max = 1-1/2 ft. (38 mm)

(H1 + H2 ) cannot exceed 15 ft. (4.6 m) when using appropriate V2.

H2

V2

H1V1

Figure 5.5

Heat & Glo • Soho24B • 2137-900 Rev. H • 10/08

13

 

Image 13
Contents What to do if you smell gas Model Soho24BHot glass will cause burns Homeowner Reference Information CongratulationsTable of Contents Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsGetting Started Installation to ensure maximum safety and benefitTools and Supplies Needed Selecting Appliance Location Framing and ClearancesMantel Projections Clearances Constructing the Appliance ChaseVent Termination Minimum Clearances Termination LocationsSee .4 for specific clearances Alcove Applications Vent Table Key Vent Information and DiagramsUse of Elbows Measuring StandardsTop Vent Horizontal Termination One Elbow Vent DiagramsTwo Elbows Minimum MaximumV1 Min H1 Max V2 Min H2 Max Top Vent Horizontal Termination Three ElbowsV1 = 45 ft Max .72 m V1 = 3 ft Min mm Top Vent Vertical Termination No ElbowV1 Minimum H1 Maximum V1 + V1 Minimum H1+ H2 Maximum V1+ V2 Minimum Top Vent Vertical Termination Three ElbowsPipe Clearances to Combustibles Vent Clearances and FramingWall Penetration Framing Combustible Wall PenetrationPipe SLP Vertical Penetration FramingFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Top Vent Appliance PreparationProper Positioning, Leveling Securing and Leveling the ApplianceAssemble Vent Sections Installing Vent PipeSecure the Vent Sections Assemble Slip SectionsDisassemble Vent Sections Install Decorative Ceiling ComponentsAssemble and Install Storm Collar Install Metal Roof FlashingApply Sealant TOP & Partial Sides Install RF4-8Install Decorative Wall Components Install Vertical Termination CapHeat Shield Requirements for Horizontal Termination 22 Venting through the wall Install Horizontal Termination CapFuel Conversions Gas Connection Gas InformationGas Pressures Pressure Natural Gas PropaneHigh Altitude Installations Electrical Information Recommendation for WireGRN wire Ground attached To GRN screw with Inside box Junction Box InstallationFacing Material FinishingSee for combustible/non-combustible definitions Clean the Appliance Appliance SetupAccessories Remove Shipping MaterialsPositioning Stones Stone Placement Soho24BNo Stones in this Area Air Shutter Setting Glass AssemblyRemoving Glass Assembly Replacing Glass AssemblyBefore Lighting Appliance Operating InstructionsLighting Instructions IPI Turn off all electric power to the applianceFinal inspection by Initial Break-in Procedure Frequently Asked QuestionsAfter Appliance is Lit Intellifire Ignition System TroubleshootingSympton Possible Cause Corrective Action Symptom Possible Cause Corrective Action Maintaining and Servicing Appliance Maintenance TasksRecommend addition of screen if one is not present Inspect Maintenance TasksAppliance Dimensions Table Appliance Dimension DiagramReference Materials Location Inches MillimeterSL Series Components Vent Components DiagramsRF4-8 ElbowRoof Flashing Ceiling Firestop Support Effective Height/LengthSupport Box-Black SnorkelAdapter Ceiling Firestop BlackPart number list on following Service PartsAt Depot StockedNo longer available IPI Valve Assembly CONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Contact Information