2. Top Vent - Vertical Termination - (continued)

Three Elbows

V1 Minimum

H1+ H2 Maximum

V2

V1+ V2 Minimum

Elbow only

1/2 ft.

152 mm

*

*

*

1/2 ft.

152 mm

1 ft.

305 mm

*

*

*

 

 

 

 

 

 

 

1-1/2 ft.

457 mm

2 ft.

610 mm

*

*

*

 

 

 

 

 

 

 

2-1/2 ft.

762 mm

4 ft.

1.2 m

*

*

*

3-1/2 ft.

1.1 m

6 ft.

1.8 m

*

*

*

4-1/2 ft.

1.4 m

14 ft.

4.3 m

*

*

*

 

 

 

 

 

 

 

H1 + H2 = 14 ft (4.3 m) Maximum

V1 + V2 + H1 + H2 = 37 ft (11.3 m) Maximum

*No specific restrictions on this value EXCEPT V1 + V2 + H1 + H2 cannot

exceed 37 ft. (11.3 m)

V2

H1

H2

V1

 

INSTALLED

HORIZONTALLY

Figure 5.8

Heat & Glo • Soho24B • 2137-900 Rev. H • 10/08

15

 

Image 15
Contents Model Soho24B What to do if you smell gasHot glass will cause burns Homeowner Reference Information CongratulationsTable of Contents Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsInstallation to ensure maximum safety and benefit Getting StartedTools and Supplies Needed Framing and Clearances Selecting Appliance LocationMantel Projections Clearances Constructing the Appliance ChaseTermination Locations Vent Termination Minimum ClearancesSee .4 for specific clearances Alcove Applications Measuring Standards Vent Information and DiagramsVent Table Key Use of Elbows Minimum Maximum Vent Diagrams Top Vent Horizontal Termination One Elbow Two ElbowsV1 Min H1 Max V2 Min H2 Max Top Vent Horizontal Termination Three ElbowsTop Vent Vertical Termination No Elbow V1 = 45 ft Max .72 m V1 = 3 ft Min mmV1 Minimum H1 Maximum V1 + V1 Minimum H1+ H2 Maximum V1+ V2 Minimum Top Vent Vertical Termination Three ElbowsCombustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingPipe SLP Vertical Penetration FramingInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Top Vent Appliance PreparationProper Positioning, Leveling Securing and Leveling the ApplianceAssemble Vent Sections Installing Vent PipeSecure the Vent Sections Assemble Slip SectionsDisassemble Vent Sections Install Decorative Ceiling ComponentsAssemble and Install Storm Collar Install Metal Roof FlashingApply Sealant TOP & Partial Sides Install RF4-8Install Vertical Termination Cap Install Decorative Wall ComponentsHeat Shield Requirements for Horizontal Termination 22 Venting through the wall Install Horizontal Termination CapPressure Natural Gas Propane Gas InformationFuel Conversions Gas Connection Gas PressuresHigh Altitude Installations Electrical Information Recommendation for WireGRN wire Ground attached To GRN screw with Inside box Junction Box InstallationFinishing Facing MaterialSee for combustible/non-combustible definitions Remove Shipping Materials Appliance SetupClean the Appliance AccessoriesPositioning Stones Stone Placement Soho24BNo Stones in this Area Replacing Glass Assembly Glass AssemblyAir Shutter Setting Removing Glass AssemblyBefore Lighting Appliance Operating InstructionsTurn off all electric power to the appliance Lighting Instructions IPIFinal inspection by Frequently Asked Questions Initial Break-in ProcedureAfter Appliance is Lit Troubleshooting Intellifire Ignition SystemSympton Possible Cause Corrective Action Symptom Possible Cause Corrective Action Maintaining and Servicing Appliance Maintenance TasksRecommend addition of screen if one is not present Inspect Maintenance TasksLocation Inches Millimeter Appliance Dimension DiagramAppliance Dimensions Table Reference MaterialsSL Series Components Vent Components DiagramsEffective Height/Length ElbowRF4-8 Roof Flashing Ceiling Firestop SupportCeiling Firestop Black SnorkelSupport Box-Black AdapterPart number list on following Service PartsStocked At DepotNo longer available IPI Valve Assembly CONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Contact Information