3 Framing and Clearances

Note:

Illustrations reflect typical installations and are FOR DESIGN PURPOSES ONLY.

Illustrations/diagrams are not drawn to scale.

Actual installation may vary due to individual design preference.

A.Selecting Appliance Location

When selecting a location for your appliance it is important to consider the required clearances to walls (see figure 3.1).

WARNING

Fire Risk

Provide adequate clearance:

Around air openings

To combustibles

• For service access

Locate appliance away from traffic areas.

NOTE: For actual appliance dimensions refer to Sec- tion 16.

B. Mantel Projections

A Studio front is required for all installs. No mantels are allowed when using Studio 24 fronts.

1/2 IN.

A

A

B

C

TOP VENT,

ONE 90º ELBOW

B

ALCOVE

INSTALLATION

D

 

A

B

C

D

Inches

33-1/8

29-1/8

46-3/4

35-1/8

 

 

 

 

 

Millimeters

841

740

1187

892

In addition to these framing dimensions, also reference the following sections:

Clearances and Mantel Projections (Section 3B).

Vent Clearances and Framing (Section 6).

Figure 3.1 Appliance Locations

Heat & Glo • Soho24B • 2137-900 Rev. H • 10/08

7

 

Image 7
Contents What to do if you smell gas Model Soho24BHot glass will cause burns Homeowner Reference Information CongratulationsTable of Contents Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsGetting Started Installation to ensure maximum safety and benefitTools and Supplies Needed Selecting Appliance Location Framing and ClearancesMantel Projections Clearances Constructing the Appliance ChaseVent Termination Minimum Clearances Termination LocationsSee .4 for specific clearances Alcove Applications Measuring Standards Vent Information and DiagramsVent Table Key Use of ElbowsMinimum Maximum Vent DiagramsTop Vent Horizontal Termination One Elbow Two ElbowsV1 Min H1 Max V2 Min H2 Max Top Vent Horizontal Termination Three ElbowsV1 = 45 ft Max .72 m V1 = 3 ft Min mm Top Vent Vertical Termination No ElbowV1 Minimum H1 Maximum V1 + V1 Minimum H1+ H2 Maximum V1+ V2 Minimum Top Vent Vertical Termination Three ElbowsCombustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingPipe SLP Vertical Penetration FramingFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Top Vent Appliance PreparationProper Positioning, Leveling Securing and Leveling the ApplianceAssemble Vent Sections Installing Vent PipeSecure the Vent Sections Assemble Slip SectionsDisassemble Vent Sections Install Decorative Ceiling ComponentsAssemble and Install Storm Collar Install Metal Roof FlashingApply Sealant TOP & Partial Sides Install RF4-8Install Decorative Wall Components Install Vertical Termination CapHeat Shield Requirements for Horizontal Termination 22 Venting through the wall Install Horizontal Termination CapPressure Natural Gas Propane Gas InformationFuel Conversions Gas Connection Gas PressuresHigh Altitude Installations Electrical Information Recommendation for WireGRN wire Ground attached To GRN screw with Inside box Junction Box InstallationFacing Material FinishingSee for combustible/non-combustible definitions Remove Shipping Materials Appliance SetupClean the Appliance AccessoriesPositioning Stones Stone Placement Soho24BNo Stones in this Area Replacing Glass Assembly Glass AssemblyAir Shutter Setting Removing Glass AssemblyBefore Lighting Appliance Operating InstructionsLighting Instructions IPI Turn off all electric power to the applianceFinal inspection by Initial Break-in Procedure Frequently Asked QuestionsAfter Appliance is Lit Intellifire Ignition System TroubleshootingSympton Possible Cause Corrective Action Symptom Possible Cause Corrective Action Maintaining and Servicing Appliance Maintenance TasksRecommend addition of screen if one is not present Inspect Maintenance TasksLocation Inches Millimeter Appliance Dimension DiagramAppliance Dimensions Table Reference MaterialsSL Series Components Vent Components DiagramsEffective Height/Length ElbowRF4-8 Roof Flashing Ceiling Firestop SupportCeiling Firestop Black SnorkelSupport Box-Black AdapterPart number list on following Service PartsAt Depot StockedNo longer available IPI Valve Assembly CONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Contact Information